BKAB,FKAB,OKG AB,RAB, SKB, TVO

INSPECTION PLAN
PAINTING/RUBBER COATING / Plant: / Paint work contractor: / Form Nor:
Page:
Issued:
Rev:
Sign: /

D.109

1 of 3
020121
System No: / Order No:
131231
No: / Object No:
Contractor: / Room No: / Date:
Valid technical documentation:
TBY, appendix 1. / INSPECTION OF PAINTWORK-CONTRACTOR AND STAFF / INSPECTION OF COMPONENTS IN STEEL-SHOP / INSPECTION OF PRE-TREATED COMPONENTS
CHLORID E TEST (see form D.100) / INSPECTION OF ENVIRONMENT IN PAINT-WORK-ROOM / INSPECTION THAT CURRENT SURFACE PROTECTION-INSTRUCTION EXIST / INSPECTION THAT SURFACE TREATMENT IS TO BE DONE ACC. TO CURRENT INSTRUCTION / INSPECTION OF PAINT-PRODUCTS
Assembly drawing No
Pos Nr / Item / No / Detail draw
No / 1.1 / 1.2 / 1.3 / 1.4 / 1.5 / 1.6 / 1.7
Not. /
  1. Symbol ”B” = Inspection performed by Customer
  2. Symbol ”E” = Inspection performed by responsible Project Supervisor of Paint Contractor
  3. Symbol ”B1” = Inspection by customer who alone decide possibly contributions.
4. Requirements according to moment 1.1 up to 5.12 see TBY app. 1

BKAB,FKAB,OKG AB,RAB, SKB, TVO

INSPECTION PLAN
PAINTING/RUBBER COATING / Form No:
Sida:
Issued:
Rev:
Sign: /

D.109

2 of 3
020121
131231
No:
Contractor No:
Valid technical documentation:
TBY, appendix 1. / INSPECTION OF TEST-REPORT FROM PAINT-SUPPLIER ACC. TO FORM NO NR D 117 / D.112 / INSPECTION OF PAINTED, FINISHED SURFACE / INSPECTION OF FINAL COAT-THICKNESS / HOLIDAY DETECTION OF FINISHED SURFACE / MANUFACT-URING OF TESTPIECES / INSPECTION OF TESTPIECES / INSPECTION OF ADHESION ON TESTPIECES
Assembly drawing No
Pos No / Item / No / Detail draw
No / 1.8 / 1.9 / 1.10 / 1.11 / 2.1 / 2.2 / 2.3
Not. / 1.Symbol ”B” = Inspection performed by Customer
2.Symbol ”E” = Inspection performed by responsible Project Supervisor of Paint Contractor
3.Symbol ”B1” = Inspection by customer who alone decide possibly contributions.
4.Requirements according to moment 1.1 up to 5.12 see TBY app. 1

BKAB,FKAB,OKG AB,RAB, SKB, TVO

INSPECTION PLAN
PAINTING/ RUBBER COATING / Form No:
Page:
Issued:
Rev:
Sign: /

D.109

3 of 3
020121
131231
No:
Contractor No:
Valid technical documentation:
TBY, appendix 1. / CERTIFICATE OF INSPECTION FOR TESTPIECES / ACCOUNTNESS OF DEVIATION REPORT / INSPECTION OF HANDLING AND TRANSPORT / ARRIVAL INSPECTION / INSPECTION OF REPORT ACC. TO FORM NO. D100 / D.108 / INSPECTION OF REPORT ACC. TO FORM NO. D.101
Assembly drawing No
Pos No / Item / No / Detail draw
No / 2.4 / 3 / 4 / 5 / 5.11 / 5.12
Not. / 1.Symbol ”B” = Inspection performed by Customer
2.Symbol ”E” = Inspection performed by responsible Project Supervisor of Paint Contractor
3.Symbol ”B1” = Inspection by customer who alone decide possibly contributions.
4.Requirements according to moment 1.1 up to 5.12 see TBY app. 1 / INSPECTION PLAN APPROVED BY:
Contractor: / Costomer:
Date: / Date:
Sign: / Sign: