HIGHWAY RENEWAL PROJECTS
The following is a list of road and bridge capital projects planned to be undertaken in 2012-13.
Northern/Remote
Continue construction of the all-weather road on the east side of Lake Winnipeg
Pave 18km of PTH 6 north of Devils Lake
Grade widen and pave 23km of PTH 6 south of Grand Rapids including drainage improvements
Pave 26km of PTH 6 north of Grand Rapids
Grade widen and gravel shoulder of 30km of PTH 10 north of The Pas
Continue grade approximately 174km of PR 280, cost-shared with Manitoba Hydro
Replace the structure on PR 287 at Cormorant Lake Narrows near Cormorant
Complete the grade and gravelling of nine km of PR 373 north of Norway House
Complete grade and paving of 51km of PR 373 north of Sea Falls
Continue paving 15km of PR 373 north of Jenpeg
Continue paving seven km of PR 374 southwest of Cross Lake
Continue paving 16km of PR 374 from Kichi Sipi Bridge to Cross Lake
Grade five km of PR 384 (Moose Lake Road) near Lobstick Creek
Improve grade on various locations of PR 391
Capital Region
Continue construction of structures and roadworks for CentrePort Canada Way
Pave 7.5km of PTH 6 south of Grosse Isle
Make intersection improvements on PTH 15 at PR 206
Make intersection and safety improvements on the Perimeter Highway
Improve illumination on the Perimeter Highway at St. Mary’s Road
Rehabilitate structure at east interchange of PTH 1 on the Perimeter Highway
Commence structure rehabilitation on the Perimeter Highway at PTH 75
...2
- 2 -
Western Manitoba
Complete minor structure rehabilitation on PTH 1 at the Assiniboine River
Construct a three-kilometre service road in Brandon parallel to PTH 1
Pave three km of shoulders of PTH 1 east of Douglas
Pave 18km of PTH 1 west of Sidney
Replace structure on PTH 2 at Jackson Creek west of Sinclair
Pave 12km of PTH 2 between Sinclair and Reston
Pave 22km of PTH 10 north of Minto
Continue reconstruction of PTH 10 north of Brandon
Pave 24km of PTH 16 east of Gladstone and 18km between Binscarth and Foxwarren
Replace structure on PTH 34 at Gillespie Drain south of Gladstone
Continue construction of PTH 110, the Brandon east access
Rehabilitate structure on PR 250 at Assiniboine River north of Alexander
Pave remaining 10km of PR 340 between Wawanesa and Shilo
Eastern Manitoba
Rehabilitate structure on PTH 1 at Birch River (east of Prawda)
Pave eight km of PTH 1 between MacGregor and Bagot
Pave 10km of PTH 1 through Portage la Prairie
Rehabilitate structure on PTH 1 at Assiniboine River east of Portage la Prairie
Replace structure on PTH 2 at Codner Drain near Starbuck
Pave 13km of PTH 11 near McArthur Falls
Rehabilitate structure on PTH 11 at Powerview Creek near Pine Falls
Commence structure replacement on PTH 12 at Rat River Diversion southwest of Zhoda
Rehabilitate structure on PTH 23 east of Morris at the Red River
Pave 15km of PTH 59 between PTH 52 and PR 210
Continue reconstruction of PTH 75 in the town of Morris and intersection improvements at the U.S. border
Rehabilitate structure on PR 207 at the Cordite Drain north of PTH 15
Pave 16km of PR 207 from PR 206 to PTH 1 through Lorette
...3
- 3 -
Complete paving of PR 210 from Ste. Anne to Landmark
Rehabilitate structure on PR 211 at Winnipeg River west of Pinawa
Pave two km of PR 216 between New Bothwell and PR 311
Grade and gravel various locations of PR 304 between Manigotagan and Wallace Lake
Pave various locations of PR 311 between PR 200 and PTH 12
Grade and gravel various locations of PR 315 between PR 313 and the Ontario boundary
Interlake
Replace structure on PTH 6 at Burnt Lake Drain north of Lundar
Complete rehabilitation of fivekm of PTH 9 between PTH 44 and Craig Avenue in Selkirk
Pave 20km of PTH 68 east of Lake Manitoba Narrows
Make intersection improvements on PTH 68 at West Vogar Access
Make minor structure repairs on PR 204 at Red River near Selkirk
Pave 10km of PR 232 south of Winnipeg Beach
Pave 10km of PR 233 north of PTH 68 near Arborg
Pave the Gimli access road
Parklands
Pave 14km of PTH 5 north of Riding Mountain to Norgate
Pave 10km of PTH 5 south of McCreary
Replace structure on PTH 5 at Turtle River near Laurier
Rehabilitate structure on PTH 10 at Bowsman River north of Bowsman
Complete intersection improvements on PTH 20A in Dauphin at Mountain Road
Continue reconstruction of 20km of PTH 83 north of San Clara
Pave 15km of PR 269 east of Fork River
Complete paving of PR 483 to Pelican Rapids
Replace structureon PR 489 at the tributary of the Garland River south of Duck River
Grade twokm of PR 588 west of Swan River
...4
- 4 -
FLOOD REPAIR PROJECTS
Damaged Infrastructure Substantially Completed
HwyLocationDescription of Work
1Assiniboine River Diversion west of Portage, east bankStructure rehabilitation
1Assiniboine River Diversion west of Portage, west bankStructure rehabilitation
1At the Assiniboine River, Grand Valley (east bank)Structure rehabilitation
1At PR 459, Grand Valley (east bank)Structure rehabilitation
22.1km west of the PTH 22 junctionSlope stabilization
3One km east of the Saskatchewan boundaryMinor culvert rehabilitation
30.6 km east of east junction of PTH 83Minor culvert rehabilitation
53.2 km north of the north junction of PR 265Culvert replacement
5At Wilson RiverSlope stabilization
5At the Assiniboine RiverStructure rehabilitation
66.4 km north of PR 227Minor culvert rehabilitation
812.8km north of RivertonMinor culvert rehabilitation
10In the vicinity of Minnedosa, 0.8km west of PR 355Slope stabilization
10One km north of the U.S. borderMinor culvert rehabilitation
10NE 15-36-26WMinor culvert rehabilitation
10In the vicinity of the Pioneer elevatorMinor culvert rehabilitation
10One km south of Smith CreekSpot road improvements
104.7 km south of MafekingMinor drainage improvements
10MafekingSpot road improvements
16At theAssiniboine River (west of Russell)Structure rehabilitation
17One km west of PTH 8Minor culvert rehabilitation
17PR 233 -PR 224Minor culvert rehabilitation
171.6 km west of PTH 7 - 4.6km westMinor culvert rehabilitation
186.7 km north of the U.S. borderCulvert replacement
20North of PR 271Spot road improvements
2015 km east of PR 271Minor culvert rehabilitation
21Three km north of the east junction with PTH 2Slope stabilization
...5
- 5 -
HwyLocationDescription of Work
2110.4 km north of PTH 2Minor drainage improvements
21North of HartneyAcquisition of right-of-way
22At the Souris RiverStructure rehabilitation
23Lizzie Avenue in Morris, PR 246Spot road improvements
23PR 422 - west dike, MorrisSpot road improvements
23At PTH 21Spot road improvements
232.3 km west of PTH 5Culvert replacement
24The east junction with PR 264Spot road improvements
266.6km east of PR 430 -PR 248Spot road improvements
34At the Pembina River BridgeSpot road improvements
3417.6 km north of PTH 1Spot road improvements
34At the Assiniboine River, north of HollandStructure
411.3 km north of PR 571Spot road improvements
59At Road 25NMinor culvert replacement
677.5 km east of PTH 6 -5.4 km eastSpot road improvements
68Six km east of Lake Manitoba NarrowsGrading, flood protection
75Two km south of PR 246 (St. Jean Baptiste), MorrisSpot road improvements
75Morris River -PR 205 (north- and southbound lanes)Spot road improvements
75Morris River - 10 km north of the river (service roads)Spot road improvements
75Three km south of PR 246 (service roads)Spot road improvements
75Two km north of north junction of PTH 23 to five km northShoulder rehabilitation
83At Municipal Road 210 NMinor culvert rehabilitation
83At Minnewasta CreekCulvert replacement
110Victoria Avenue -PR 457Grading
200Emerson - four km north of EmersonSpot road improvements
200PR 311 -St. AdolpheSpot road improvements
200PR 210 - the Floodway bridgeSpot road improvements
201Three km east of Roseau River First NationSpot road improvements
201PTH 50 -PR 209Spot road improvements
...6
- 6 -
HwyLocationDescription of Work
20113.6km east of PR 242Spot road improvements
205Morris River Bridge -PR 422Spot road improvements
210St. Adolphe - three km east of PR 200Spot road improvements
217PR 246 - three km east of PR 200Grade reconstruction
222Two km north of HnausaMinor culvert rehabilitation
231At Gimli yardMinor culvert rehabilitation
233One km south of PR 325Spot road improvements
240PR 240, eight km south of PR 245Spot road improvements
2401.6 km north of PTH 1 - Delta BeachSpot road improvements
240One km south of PTH 23Culvert replacement
242At PR 242 (north of Westborne)Spot road improvements
242North of the junction with PR 242 - Lynchs PointSpot road improvements
242At Westbourne drainMinor culvert rehabilitation
243PTH 75 - the RM boundarySpot road improvements
2450.02 km east of PR 342Minor culvert rehabilitation
246Two km north of PR 205 - PTH 23Spot road improvements
246PTH 75 (St. Jean Baptiste) - five km south of PTH 23Spot road improvements
2476.4 km east of PR 332Minor culvert rehabilitation
247West of PTH 75Spot road improvements
248PR 227 - PTH 6Culvert replacement
2500.5km south of Assiniboine river - 0.5 km north of riverGrading
2525.5 km north of PTH 3Minor culvert rehabilitation
2534.5 km east of PTH 18Culvert replacement
253At nine km east of the north junction with PR 458Minor culvert rehabilitation
2544.6 km north of PTH 2Spot road improvements
254Three km north of PR 345Spot road improvements
2543.6 km north of PTH 1Spot road improvements
25410 km south of PTH 3 and PR 254Minor culvert rehabilitation
...7
- 7 -
HwyLocationDescription of Work
254Eight km south of PTH 3Minor drainage Improvements
2560.2km north of the U.S. BorderMinor culvert rehabilitation
257At Scallion Creek (Virden)Minor structure rehabilitation
259At the Assiniboine River, 4.4 km east of the CPR lineGrading
259At the Assiniboine River flood relief structureMinor structure rehabilitation
2644.2km south of PTH 42Spot road improvements
26410.7km south of PTH 42Minor culvert rehabilitation
265East of Plumas - PTH 50Culvert replacement
2668.5 km south of PR 268Minor culvert rehabilitation
268At Birch RiverMinor culvert replacement
268Birch River - Woody RiverSpot road improvements
268NE corner 22-39-25WCulvert replacement
271NE 34-32-20WMinor culvert rehabilitation
271Two km west of PTH 20Spot road improvements
2710.3km west of PR 489Spot road improvements
272In the vicinity of Duck BayGrading
274Ranch Creek, 29.7km southwest of east junction, PTH 5Spot road improvements
275North of 19-36-27WMinor culvert rehabilitation
2765.0 km north of Ste Rose - seven km south of PR 328Surfacing, road repairs
27820.5 km north of PTH 50Culvert replacement
305At the flood relief channelStructure rehabilitation
305At the Assiniboine RiverStructure rehabilitation
31720.5 km west of PTH 12Culvert replacement
320Various locationsSpot road improvements
3234.8 km west of PR 236Spot road improvements
3230.5 km west of PR 322Spot road improvements
324At PR 222Minor culvert rehabilitation
3255.6 km west of PTH 17Spot road improvements
...8
- 8 -
HwyLocationDescription of Work
3293.2km east of the junction with PR 326Minor culvert rehabilitation
330PTH 75 - PR 205Spot road improvements
331At Hoop and Holler BendGrade reconstruction
331Hoop and Holler CutSpot road improvements
332At Tobacco Creek in the vicinity of Lowe FarmAcquisition of right-of-Way
334One km south of PTH 2Minor culvert rehabilitation
3386.9km north of PR 245 - PR 305Minor culvert rehabilitation
340At Black Creek (north of Wawanesa)Structure
341At 0.7km and 11.1km east of PTH 10Minor culvert rehabilitation
34115.5 km east of PTH 10Minor culvert rehabilitation
342At 8.6 km north of PTH 23Culvert replacement
3420.7 km south of PR 245Culvert replacement
3423.6 km north of PTH 23Culvert replacement
34517.6 km east of PTH 83Grading
34616.3 km north of PTH 3Culvert replacement
3474.1 km west of PTH 22Spot road improvements
348West of BrandonBridge removal
350Four km south of MacGregorSpot road improvements
35215.2 km north of PTH 16Minor culvert rehabilitation
36411.2 km west of PR 481 - 11.7 km west of PR 481Spot road improvements
366At Municipal Road 151 WMinor culvert rehabilitation
366NE corner 33-38-26WMinor culvert rehabilitation
366In the vicinity of Elk Lake, 3.2 km south of PR 367Minor culvert rehabilitation
367Five km east of theShell River BridgeMinor culvert rehabilitation
367South of the Shell River BridgeSpot road improvements
415Four km north of PR 322Spot road improvements
419Four km west of PTH 17Spot road improvements
430One km north of PTH 1 - PTH 26Grading
430At the Assiniboine River (northeast of Portage la Prairie)Structure
...9
- 9 -
HwyLocationDescription of Work
45010.6 km north of the U.S. borderMinor drainage improvements
452Seven km east of PTH 83Spot road improvements
453PTH 10 - PR 340Spot road improvements
4570.5 km east of PTH 1A - 2.5 km east of PTH 1ASpot road improvements
4580.7 km north of PTH 3Minor culvert rehabilitation
4582.9 km north of PTH 3Slope stabilization
459PTH 1 - PTH 10Grading
4621.6 km north of PR 265Minor culvert rehabilitation
467One km west of PTH 83Spot road improvements
4786.5 km south of PTH 45Culvert replacement
485Various locations (south of 23 and 24-35-26W)Minor culvert rehabilitation
485At West Favel RiverSlope stabilization
486Various Locations (north of 16 and 17-34-28W)Minor culvert rehabilitation
488In the vicinity of Minitonas Creek (south of 33-34-27W)Minor culvert rehabilitation
488NE 1-36-27WMinor culvert rehabilitation
489PR 271 - PTH 20 (various locations)Spot road improvement
489NE 8-34-20WSpot road improvements
513Three km west of Frenchman’s Rapids - two km eastGrading
518PTH 6 - five km north of PTH 6Grade and gravel
5181.6km south of PR 415Spot road improvements
530At the Souris River (Treesbank)Bridge removal
549West of the Shellmouth DamSpot road improvements
569One km east of PTH 50 - 2.6km east of PTH 50Minor culvert rehabilitation
57914.5 km west of PTH 16Spot road improvements
583At the Shell RiverStructure rehabilitation
588South of Trout Creek (west of 18-37-28W)Slope stabilization
606In the vicinity of Bethan, 0.5km south of PR 471Spot road improvements
611Fairford Access RoadGrading
620Eden AccessGrading
...10
- 10 -
HwyLocationDescription of Work
6280.5km south of PR 251Culvert replacement
633MacGregor AccessSpot road improvements
646At four km west of PTH 10Minor culvert rehabilitation
650Riverside AccessSpot road improvements
800Hanks Main Market Road (detour for PR 416)Spot road improvements
800Polson Main Market - 1.6 km north of PR 229Spot road improvements
800Silver Main Market - five km west of PTH 17Spot road improvements
800Sumka Main Market - 1.5 km west of PTH 7Spot road improvements
800Thomchuk Main Market - 2.5 km north of PR 231Spot road improvements
800Fraserwood Main Market , 0.8 km west of PTH 7Spot road improvements
800Malonton Main Market, 0.8 km east of PTH 7Spot road improvements
800Meleb Main Market, 1.6km east of PTH 7Spot road improvements
800Narcisse West Main Market, 16 km west of PTH 17Spot road improvements
800Fairford MMR, nine km east of PTH 6 - one km eastSpot road improvements
PR 355 - Main Street (Minnedosa)Spot road improvements
Work Identified for Completion
Eastern Region
150.2 km east of Brokenhead RiverCulvert replacement
75Morris - Plum River BridgeSpot road improvements
217Red River - One km eastSpot road improvements
246Plum River - 0.5 km southSpot road improvements
631Pembina Trail, Bourret Street - 0.4 km southSpot road improvements
South-Central Region
13One km south of Elm CreekSpot road improvements
16Gladstone, PR 260 - Whitemud RiverCulvert replacement
227At the Assiniboine River DiversionStructure rehabilitation
229three km east of the regional boundaryGrading
240At the Assiniboine River (south of Portage la Prairie)Structure
...11
- 11 -
HwyLocationDescription of Work
242At Lynchs PointGrading
242At the Assiniboine River (southwest of Portage la Prairie)Structure
248At the Assiniboine River (Baie St. Paul)Structure
331Hoop and Holler Curve - PTH 13Grading
332At Tobacco Creek, in the vicinity of Lowe FarmReplacement of timber Bridge
415PR 518 - 13 km east of PR 518Grading
518North of PTH 6 - PR 415Grading
800At the Assiniboine River Diversion, Road 71NStructure rehabilitation
Southwestern Region
11.1 km east of PTH 1Slope stabilization
1At the Assiniboine River, Grand Valley (west bank)Structure rehabilitation
1At PR 459, Grand Valley (west bank)Structure rehabilitation
2At the Souris River (Wawanesa)Structure rehabilitation
3At seven km east of PTH 83Spot road improvements
3Two km east of the junction with PR 458Spot road improvements
30.8km east of the east junction with PTH 5Spot road improvements
3At the Souris RiverStructure rehabilitation
5One km north of the north junction with PR 265 Culvert replacement
59.1 km north of PTH 2 - 2.6 km north of Assiniboine RiverGrade reconstruction
5Various locationsGrading
10Assiniboine River - 0.2 km north of PR 459Spot road improvements
10At Little Saskatchewan River Valley (near Minnedosa)Spot road improvements
10At the Souris RiverStructure rehabilitation
160.6 km east of Road 85W (near Neepawa)Minor culvert rehabilitation
186.2 km north of PTH 3Culvert jacking
218.0 km north of PTH 23Grade construction
217.5 km north of PTH 1Grade reconstruction
2113.3 km north of the east junction with PTH 2Slope stabilization
...12
- 12 -
HwyLocationDescription of work
210.45 km north of the junction with PR 355Slope stabilization
21At the Souris River (Hartney)Structure rehabilitation
22At the Souris RiverGuardrail replacement
231.6km west of the junction with PTH 18Slope stabilization
24One km west of PR 270Minor culvert rehabilitation
412.1 km south of PTH 42Bit pavement/shoulder gravel
41At the Assiniboine River (south of St-Lazare)Structure rehabilitation
451.8 km west of PR 270 at North Jackfish LakeGrade reconstruction
451.6 km east of PR 354Culvert jacking
83At the Assiniboine River (south of Miniota)Drainage improvements
837.5 km north of PTH 1Culvert replacement
8313.1 km north of the junction with PTH 1Culvert replacement
2504.5 km north of PTH 1Slope stabilization
250In the vicinity of Sandy LakeCulvert replacement
251At the Souris River (Coulter)Structure rehabilitation
254At the Souris RiverStructure rehabilitation
262Various locationsCulvert replacement
265Various locations (in the vicinity of Eden)Culvert replacement
27010 km south of PTH 45 - 8.3km south of PTH 45Minor culvert rehabilitation
2700.2 km south of PTH 24 (Rapid City)Culvert replacement
2708.3 km north of PTH 16Grading
3405.2 km north of the junction with PTH 2Spot road improvements
340At SourisStructure rehabilitation
3421.7 km south of PR 253Grade reconstruction
345At the Souris RiverStructure rehabilitation
346One km north of the junction with PTH 23Slope stabilization
346At the Souris RiverStructure rehabilitation
347At Elgin Creek, east branchMinor structure rehabilitation
...13
- 13 -
HwyLocationDescription of work
347At Elgin Creek, west branchMinor structure rehabilitation
347At the Souris RiverStructure rehabilitation
352Various locations (in the vicinity of Edrans)Culvert replacement
354In the vicinity of OnanoleSpot road improvements
355MinnedosaSpot road improvements
4407.1 km north of PR 253Spot road improvements
452At the Souris RiverStructure rehabilitation
453At Mile CreekMinor structure rehabilitation
455One km east of PTH 21Slope stabilization
464One km north of PR 353 (SE 35-12-16W)Spot road improvements
464At 0.2km north of Road 82N Spot road improvements
465At 0.5 km east of Road 95W Spot road improvements
465PR 262 - PR 466 (various locations)Culvert replacement
466At the PR 465 junction - PTH 16Minor culvert replacement
4701.6 km west of PR 354 - 4.8 km west of PR 354Culvert replacement
471In the vicinity of Bethany and EdenCulvert replacement
4763.2 km north of PTH 16Spot road improvements
478At the Assiniboine River (west of Binscarth)Structure rehabilitation
54210.1 km north of the junction with PR 257Minor culvert rehabilitation
5791.7 km north of PR 478Spot road improvements
5794.8 km west of PTH 16Spot road improvements
579At the Assiniboine River (in the vicinity of Millwood)Structure rehabilitation
6700.6 km east of PTH 42 (town of Shoal Lake)Spot road improvements
8000.3 km east of PR 354 and one km north of PR 470 Culvert replacement
800At the Qu’Appelle River (old PTH 41)Structure rehabilitation
1AAssiniboine River -PR 457Grading
...14
- 14 -
West-Central Region
HwyLocationDescription of work
10At the West Favel RiverSlope stabilization
6829 km east of Lake Manitoba NarrowsGrading, flood protection
239Steeprock - PTH 6 (various locations)Bituminous levelling
417In the vicinity of Lake Manitoba First NationGrading, flood protection
481In the vicinity of Crane River First Nation (FN)Grading, flood protection
4853.6 km south of PR 366Minor culvert rehabilitation
5123.3 km southeast of PTH 68Grade reconstruction
513Six km east of Gypsumville - 16 km west of Dauphin FNConstruct winter road
513PTH 6 - Dauphin RiverGrading
643St. Laurent access (various locations)Bituminous levelling