BC Hydro Community-Based Biomass Power Call RFQ – Registration Form

SCHEDULE 3

REGISTRATION FORM

Issue Date:April 7, 2010

This is a form field document. Enter data only in the form fields. All other content is in read-only format. Do not otherwise modify or supplement this document. Yourregistration content should be submitted to BC Hydro on or before the ‘Registration Closes’ date shown on the latest RFQ Timetable, and include:

(i)A completed Registration Form (Schedule 3) in MS Word format submitted via email to ;

(ii)A signed Disclosure Statement (Schedule 4) in hard copy, and

(iii)two (2) signed copies of a Confidentiality and Compliance Agreement (Schedule 5) in hard copy to

BC Hydro

10th Floor, 333 Dunsmuir Street

Vancouver, BC V6B 5R3

Attention: RFQ Administrator (CBB Power Call)

Respondent Information
Respondent’s Full Name (Company or Entity):
Respondent’s Postal Address
Address: / City: / Province/State: / Country: / Postal/Zip Code:
Respondent / Project Website Address:
Respondent Contact Person
First Name: / Last Name:
Title: / Email:
Phone: / Alternate Phone: / Fax:
Disclosure Statement
Respondents should complete the Disclosure Statement (Schedule 4) and submit it as part of the RegistrationDocuments. BC Hydro recognizes that Projects may be in their initial stages and requests that Respondents complete the Disclosure Statement with the information that they have available at this time. Respondents are required to submit updated Disclosure Statements to BC Hydro during the RFQ process if and when circumstances change so that the Disclosure Statement is accurate and up to date.
All persons considering participation in the RFQ are advised that persons or consultants associated with Respondents may include (i) former employees of BC Hydro and/or Government Entities, or (ii) current or former consultants to BC Hydro. (See the Disclosure Statement for a definition of “Government Entities”).
BC Hydro reserves the right to require any Respondents to confirm or implement policies and/or measures to avoid any actual or perceived conflict of interest and/or unfair advantage that may arise from any relationship required to be disclosed under this section.
Confidentiality and Compliance Agreement
All Respondents must submit two (2) signed copies of the Confidentiality and Compliance Agreement(Schedule 5 of the RFQ) and submit them as part of the Registration Documents.
Registration Checklist
A completed Registration Form (Schedule 3) in MS Word format submitted via email to.
A signed Disclosure Statement (Schedule 4) in hard copy, and
two (2) signed copies of the Confidentiality and Compliance Agreement (Schedule 5) in hard copy to
BC Hydro
10th Floor, 333 Dunsmuir Street
Vancouver, BC V6B 5R3
Attention: RFQ Administrator (CBB Power Call)
Preliminary Project Information
If a Respondent intends to submit Proposals for more than one Project, add additional Project sections as required using the ‘New Project’ button to the right. Only one Registration Form is required regardless of the number of Projects for which Proposals are to be submitted. /
Project 1
Project Name:
Plant Capacity: MW
Location: (Geographic Region) (Blank)Central InteriorEast KootenayKelly/NicolaLower MainlandNorth CoastPeace RegionSouth InteriorVancouver Island(Nearest City or Town)
Primary Fuel Source: (Blank)Pulp Residuals: Black LiquorSawmill Residuals: Hog Fuel/Sawdust/ChippingForest Sourced Residuals: Roadside/Sort Yard/SlashStanding Timber Uneconomic for Normal HarvestingSorted Clean Organic Municipal Solid WasteOther Clean Biomass: Agricultural Residues, CropsTechnology Type:(Blank)Biogas (e.g. gasification)Biomass (e.g. combustion boiler)OtherUndecidedDescribe if “Other”:
Interconnection:(Blank)To Distribution SystemTo Transmission System behind Customer LoadInterconnection Details:(Blank)DirectIndirect
Scheduled COD (e.g. 2014-10-01):
Project Type:(Blank)New (Greenfield) GenerationAdditional Generator at Existing FacilityExisting GenerationCustomer-based Generation / Is there an existing EPA for the Project with BC Hydro or another party?(Blank)YesNo

Issued April 7, 20101