ADMINISTRATIVE/INSTRUCTIONAL WALKAROUND CHECKLIST

First Aid

q  Supplies available/replenished regularly

q  Certified First Aid / School Nurse

q  All P.E. Instruction/Coaches trained 1st aid/CPR

q  Automated External Defibrillator (AED)

o  Athletic events

o  Training required

Walking and Working Surfaces

q  Clean and Dry

q  Wet floors mopped immediately

q  Wet floor signs

q  Adequate lighting

q  Aisles marked and clear

q  Guardrails – platforms over 4 ft

q  Covers/Guardrails used for ditches, etc.

q  Loading dock over 4 ft guarded

q  Floor holes guarded

q  Stairways

o  Adequate railing

o  7 ft clearance

Exits (Egress)

q  Marked with visible sign

q  Directional exit signs

q  Free of obstructions

q  All doors marked / labeled

q  No flammables/combustibles near exit

q  Emergency escape windows marked

q  Emergency escape window free of obstructions

Fire Protection

q  Procedures for Emergency Alarms

q  Portables – Fire Alarm System

o  Central fire pull station

o  Operable smoke alarms

o  Portable fire extinguishers

q  Fire extinguishers available

o  Size and degree of hazard

o  Classrooms with ovens, etc.

o  Kilns

q  Fire extinguishers

o  Not blocked

o  Mounted

o  Hydrostatically tested

o  Visual inspections monthly

o  Annual inspections

q  Training for employees

q  No storage within 24” of ceiling

q  Garbage dumpster > 10ft from bldg

q  Evacuation routes posted in each room

q  Transformers free of comb/flammable materials

q  Drapes – flame retardant material/treated

q  Space Heater

o  Ceramic

o  Kept away from comb/flam materials

o  Unplugged at the end of the day

PPE (Personal Protection Equipment)

q  Hazard assessment

q  Written certification

q  Training

q  PPE provided

q  Required to be worn

q  Goggles / aprons / gloves

q  Eyewash / shower for corrosives

Sanitation

q  Good housekeeping

q  Waste containers emptied regularly

q  Vermin control program

q  Toilet facilities available

q  Soap, hand towels, hot or tepid water

Storage

q  Aisles marked and clear

q  Storage properly stacked/blocked/secured

q  Capacity posted for overhead storage areas

Electrical

q  All breakers labeled

q  Unused openings covered

q  Three ft clearance

q  All exposed parts covered

q  GFCI used within 6 ft of water

q  All equipment is grounded (3 wire)

q  Pull boxes, junctions boxes covered

q  Faceplates on all receptacles and light switches

q  Receptacles accept three prong plugs

q  Extension cords not used as fixed wiring

q  Extension cords not nailed, run over sharp edges, stapled, etc.

q  Extension cords approved for wet locations

q  Daily visual inspection of extension cords

q  Stored at the end of the day

q  Cheater plugs not allowed

q  Strain relief on all cords

Hazard Communication

q  Site-specific program

q  Labels on all containers

q  MSDS for all chemicals

q  Contractor notification

q  List of chemicals

q  Training

Staff members responsible for chemicals brought from home to school

Bloodborne Pathogens

q  Site-specific program

q  Exposure determination

q  Universal precautions

q  Engineering/work practices controls

q  PPE (gloves, apron, goggles)

q  Hepatitis vaccination (no cost)

q  Post-exposure follow-up available

q  Annual training

q  Medical records

q  Spill kit (disinfectants, biohazard bags)

o  Field trips

q  Sharps container

q  Needle stick log

Proper Lifting

q  Proper lifting training

q  Storage containers kept at a small size

q  Equipment in good repair

q  Carts/hand trucks provided

q  Buddy system in place – “HELP”

q  “Body Management” encouraged

Ergonomics

q  Desk area evaluation

q  Chair

o  Proper height to minimize strain

o  Adjustable armrests

q  Computer monitor

o  Eyelevel

q  Phone handset

o  Attachment to prevent straining

q  Keyboard

o  Proper level

q  Storage and equipment at a level to minimize reaching and pulling

Indoor Air Quality

q  Roof/plumbing leaks addressed quickly

(IAQ-Indoor Air Quality concerns)

o  24 – 48 hours

q  Animals cages cleaned regularly

q  Plants

o  Maintained (remove dead parts)

o  Not over-watered

q  Air supply/return vents are not blocked

q  Temp 68 - 76 F to prevent mold

q  Relative humidity <60%

q  Minimal chemicals kept in classroom

Playground

q  Awareness training for instructors on safe play

q  Adequate Supervision

q  Frequent inspections for trash, rocks, glass, etc.

q  Whistles to alert children of unsafe play

q  Walkie-Talkie used to contact office (intruder)

q  Maintenance notified regarding equipment repair needs

Reading Lofts

q  No greater than 32 sq ft (4x8)

q  Non-combustible material

q  Painted wood with tumescent material

o  (INSUL-BLAZE by Glidden Paint Co.)

q  Loft floor not > 4 ft in height

q  Loft floor not > 4 ft in height

q  “Ships ladder” with handrail (30 degrees)

q  Guardrail

o  on all exposed sides

o  at least 42” high

o  slats spaced no more than 3.5” apart

Science Labs

q  Chemical Hygiene Plan

q  Fire blankets

q  Plumbed eyewash/shower

q  Emergency shut off valve

q  Fire extinguishers

q  Vented hood

q  PPE (goggle, aprons, gloves)

q  Chemicals Storage Rooms

o  Inventory

o  Proper disposal of old chemicals

o  Fire protection

o  Ventilation

General Safety items

q  Two/three step type stepladders

o  Disciplinary action for noncompliance

q  Other Recommended Training

o  Sexual Harassment, sex and race discrimination training to all staff

o  Conflict management training

o  Procedures for breaking up fights safely

q  Purses and personal belongings locked up

q  Doors locked when not in use

o  Classrooms

o  Science Labs

o  Office doors

o  Weight room

q  Two-way communication with office

School

Inspected by(print)

Inspector’s Signature

Date of Inspection