Technical Programs Director Checklist
Form: / Rev: / Date:GMM-104 / Orig. / 04/30/2012
Timeline Tasks
Weekly TasksCheck FAA Website for FAR changes
Check status of 119 managers for filled status, full time status, qualifications ADM 3.6
Monthly Tasks
Review Inspection Personnel Training Records in individual’s training folder for completeness and accuracy.
Check all HAZMAT records for completeness and accuracy. Schedule training for personnel with missing records. See ADM 4.10.
Back up CAS Manager to ensure KLA’s list of outsource maintenance is current CAS 9.6.5
Update Manual Distribution List. ADM 6.6.1.1
Quarterly Tasks
Review Manual Interface Matrix for completeness and accuracy.
Review Forms Management Spreadsheet
Complete review of ADM duties, responsibilities and authorities of all required personnel
Review OpSpecs and ensure changes to manual references are made.
Annual Tasks
Update ADM Chapter 8 with significant terms and acronyms
Review and coordinate/update as necessary Ops Flight and Ferry Flight requirements or references in GMM, FOM, DPM
Miscellaneous Duties
Required Management
If deviations for required management, notify CHDO within 10 days. See ADM 3.6.
Duties, Responsibilities and Authority
Manages the required management personnel process.
Manages the Engineering Order process.
Responsible for monitoring escalations and extensions and scheduling compliance at the prescribed due point for the Short Term Escalation (STE) Program.
Has the duty of calculating any changes to the curtailed load envelope and has authority to modify the information in the database containing the curtailment calculations.
Manages the Outsource Maintenance Provider – Quarterly Utilization Report process and to ensure that this process is current IAW Federal Aviation Regulations, policies, and guidance along with the continued improvement process.
Responsible for the overall management of the Hazardous materials handling and training processes and for the maintenance of HM training records for KLA personnel.
Has been delegated authority to establish and modify the policies, procedures, instructions, and information for the Manual Currency, Content, and Consistency, Distribution, Availability and Supplemental Operations manual processes.
Responsible for providing oversight of the manual system. Responsible for investigating any report issued by an employee relating to a noncurrent or missing manual.
Responsible for maintaining documents housed in the Principal Base of Operations.
Responsible for ensuring the Manual Interface Matrix is current and accurate.
Manages the Computer System and Database process.
Responsible to create and update the Safety Information Card for each type aircraft.
Responsible to place Outlook "reminders" to check on currency of:
- KLA Ops Specs.
- Status of 119 Managers (full time, qualified, etc.).
- Duties and Responsibilities of 119 managers.
- To work with CM for currency of OMP personnel lists.
- Update ADM Abbreviations/Definitions (ADM Chapter 8).
Manages and oversees the currency of the KLA manuals covering the inspection program and other programs covering maintenance, preventive maintenance and servicing. (GMM, MIP, CAS, MTM, GFM, ICE).
Provides overall management of KLA Forms using the KLA Forms ManagementSpreadsheet.
Operations Specifications
Review Master Ops Specs Ensure completeness and accuracy See ADM 6.14.1
Ensure Ops Spec access table in ADM 6.14.4 is accurate
Ensure manuals have current and accurate references to Op Specs