KEARNS IMPROVEMENT DISTRICT
5350 West 5400 South
Kearns, Utah 84118
September 8, 2014
INVITATION TO PRE-QUALIFY:
Kearns Improvement District is seeking contractors that would like to pre-qualify to submit bids for the construction of the 5 MG Culinary Water Tank and 30-inch Diameter Culinary Waterline Project.
The scope of work is anticipated to include the following work items:
The construction of a water-tight reinforced concrete structure with a 5 million gallon capacity; valve vault with piping, valves, etc.; 30-Inch diameter inlet/outlet piping; site work; grading, and emergency overflow piping and structures. The project also includes electrical connections to and electrical work associated with the valve vault at the tank site.
No pre-submittal information meeting will be held.
The qualifying contractors must:
1)Show a minimum of 5-years of experience installing reinforced concrete culinary water tanks.
2)Demonstrate construction of at least three (3) reinforced concrete culinary water tanks with a capacity of 3 Million Gallons or largerand construction of at least three (3) culinary waterlines 18 inches in diameter or larger within City Streets in the last 10 years.
3)Document completion of 3 separate projects with a minimum cost of $1,000,000 each. The total value of change orders for each of these projects must equal less than 10% of the total project cost.
4)Demonstrate through references satisfactory performance on similar projects.
5)Have a local office in the State of Utah.
6)Provide a minimum of 5 references.
7)Show capability to meet the OWNER’S insurance and bonding requirements.
Only Contractors who are pre-qualified by Kearns Improvement District will be allowed to submit bids for the project.
If you would like to submit information that would qualify your company, please complete the attached pages and supply the requested information.
Please return the requesting information to Kearns Improvement DistrictOffice, 5350 West 5400 South, Kearns, Utah 84118, on or before 5:00 PM, Friday, September 19, 2014.
1
PROJECT: KEARNS IMPROVEMENT DISTRICT 5 MG CULINARY WATER TANK
A. PRE QUALIFY SUBMITTAL
On or before 5:00 p.m. September 19, 2014 submit the following:
Submit “QUESTIONNAIRE AND STATEMENT OF QUALIFICATIONS”
Submit requested information on projects of similar size and scope.
Mark envelope or container with “Pre-qualifying forKearns Improvement District 5 MG Culinary Water Tank and 30-Inch Diameter Culinary Waterline”and state the submission deadline date and time.
The envelope should also bear on the outside the name of the contractor and the company address.
Submission Deadline:5:00 P.M., Friday, September 19, 2014.
Submit to: Kearns Improvement District
5350 West 5400 South
Kearns, UT 84118
Information provided by contractors will be sent to Kearns Improvement District appointed Selection Committee for evaluation. Only those contractors that are selected by the Selection Committee will be sent the Request for Proposal for the Construction of the Kearns Improvement District5 MG Culinary Water Tank and 30-Iinch Diameter Culinary Waterline.
Questions on the project must be received by Vern Conder, Engineer with Hansen, Allen & Luce, Inc. no later than 3:00 PM September 16th E-mail is the preferred method for all questions. (, phone 801-566-5599).
QUESTIONNAIRE AND STATEMENT OF QUALIFICATIONS
1.General Company Information:
Company Name: ______
Type of Corporation: ______
Incorporated in the State of: ______
Company Owner or CEO:______
Main Business Contact: ______
Business Address: ______
Business Phone Numbers (general & FAX lines):______
E-mail Address: ______
Number of Years in the General Construction Business: ______
- Contractor License Information:
Primary Classification: ______
Utah Number: ______Date of Issue: ______
License Holder: ______
Type of License: ______
Supplemental Classifications held, if any: ______
Please state and explain any disciplinary actions taken by the State of Utah to revoke or suspend the above license or attempts to investigate the license holder for business or construction related reasons (include on a separate and attached sheet of paper).
- Names and titles of Principal Officers of Contractor’s firm:
Name ______
Title ______
Name ______
Title ______
Name ______
Title ______
- Name, Address, and telephone number of surety company and agent who will provide the required bonds on this Contract:
______
- Contractor’s maximum bonding amount: ______
- The Contractor must agree to the insurance and bonding requirements in Exhibit A, “Section 00800 Supplementary Conditions”, cc attached
- Company Similar Project Work Experience:
List a minimum of three (3) projects constructed by your company within the last ten (10) years involving the installation of 3.0 Million Gallon reinforced concrete culinary water storage tanks or larger and three (3) projects constructed by your company within the last ten (10) years involving the construction of 18-inch diameter culinary waterlines or larger in City streets.
Include a complete accounting of:
1)Total construction cost.
2)Total of change order allowances.
3)Name and phone number of project engineer.
4)Name and phone number of project owner/client.
5)Calendar days to complete from notice to proceed to closeout.
6)Name of each project manager or superintendent.
7)Dates of individual project completion.
- Company Projects Work Experience with projects over $1,000,000:
List three (3) projects completed by Contractor with a project budget of at least $1,000,000. The total change in cost due to changer orders must also be shown:
Include a complete accounting of:
1) Total construction cost.
2) Total of change order allowances.
3) Name and phone number of project engineer.
4) Name and phone number of project owner/client.
5) Calendar days to complete from notice to proceed to closeout.
6) Name of each project manager or superintendent.
7) Dates of individual project completion.
Please use additional pages to provide the requested information.
- Provide five (5) references for whom the Contractor has provided work on similar projects who is familiar with the Contractor’s abilities. This Information must be provided on the attached reference sheets (see attached, forms).
- List the Major equipment that you anticipate using for this project. Also indicate whether the equipment is owned or if it will be rented.
______
______
Contractor’s Signature
EXHIBIT A
1
SECTION 00800
SUPPLEMENTARY CONDITIONS
SC-5.04CONTRACTOR'S LIABILITY INSURANCE
The requirements of General Conditions paragraph 5.04 for insurance to be purchased and maintained by the CONTRACTOR, and any renewals thereof, are modified and supplemented as follows:
C.A copy of the acceptable Certificates of Insurance filed with the OWNER shall be delivered to the ENGINEER for review before any work at the site is started.
D.All liability insurance policies for the project shall include an endorsement naming the OWNER and ENGINEER as additional insured.
E.The CONTRACTOR General Liability Insurance shall be comprehensive form and shall include the following coverages:
1.Premises/Operations, collapse hazard, underground hazard, products/completed operations hazard, contractual insurance applicable to CONTRACTOR’s obligations under SC 6.03 Indemnification, broad form property damage, independent contractors, and personal injury.
2.Auto Liability Insurance shall be comprehensive form and shall cover owned, hired and non-owned vehicles.
3.The limits of liability for the insurance required by paragraph 5.04 of the General Conditions shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations:
a.Workers' Compensation, etc. under paragraphs 5.04.A.1 and A.2. of the General Conditions:
(1) State:...... Statutory
(2) Applicable Federal:...... Statutory
(3) Employer's Liability...... $1,000,000
(Each Accident):
- CONTRACTOR's Liability Insurance under paragraphs 5.04.A.3 through A.6 of the General Conditions which shall also include completed operations and product liability coverages and eliminate the exclusion with respect to property under the care, custody and control of CONTRACTOR:
(1) General Aggregate (Except Products--Completed Operations)...... $1,000,000
(2) Products--Completed Operations Aggregate...... $1,000,000
(3) Personal and Advertising Injury (Per Person/ Organization):...... $1,000,000
(4) Each Occurrence (Bodily Injury and Property Damage):...... $1,000,000
(5)Property Damage liability insurance will provide Explosion, Collapse and Underground coverages where applicable.
(6)Excess Liability in Umbrella Form:
(a) General Aggregate...... $2,000,000
(b) Each Occurrence...... $1,000,000
- Automobile Liability under paragraph 5.04.A.6 of the General Conditions:
(1)Bodily Injury:
(a) Each Person...... $1,000,000
(b) Each Accident...... $1,000,000
(2)Property Damage:
(a) Each Accident...... $1,000,000
or
(3)Combined Single Limit (Bodily Injury and Property Damage):
(a) Each ) Each Accident...... $1,000,000
- The Contractual Liability coverage required by paragraph 5.04.B.4 of the General Conditions shall provide coverage for not less than the following amounts:
(1)Bodily Injury
(a) Each Accident...... $1,000,000
(b) Annual Aggregate...... $1,000,000
(2) Property Damage:
(a) Each Accident...... $1,000,000
(b) Annual Aggregate...... $1,000,000
e.Other persons or entities (other than those already listed in the General Conditions) to be included on the policy as additional insured shall include:
(1)Kearns Improvement District
(2)Hansen, Allen & Luce, Inc. and its subconsultants
(3)Other Engineering or testing groups employed by OWNER for work at the site or this project.
CONTRACTOR REFERENCE NO. 1
Name of Contractor:Date:
Name of Reference:
Title of Reference:
Company:
Telephone Number:
Name of Project:
Cost of Project:
Include a brief description of the project below:
CONTRACTOR REFERENCE NO. 2
Name of Contractor:Date:
Name of Reference:
Title of Reference:
Company:
Telephone Number:
Name of Project:
Cost of Project:
Include a brief description of the project below:
CONTRACTOR REFERENCE NO. 3
Name of Contractor:Date:
Name of Reference:
Title of Reference:
Company:
Telephone Number:
Name of Project:
Cost of Project:
Include a brief description of the project below:
CONTRACTOR REFERENCE NO. 4
Name of Contractor:Date:
Name of Reference:
Title of Reference:
Company:
Telephone Number:
Name of Project:
Cost of Project:
Include a brief description of the project below:
CONTRACTOR REFERENCE NO. 5
Name of Contractor:Date:
Name of Reference:
Title of Reference:
Company:
Telephone Number:
Name of Project:
Cost of Project:
Include a brief description of the project below:
1