October 2007doc.: IEEE 802.11-07/2702r0
IEEE P802.11
Wireless LANs
Date: 2007-09-11
Author(s):
Name / Company / Address / Phone / email
Peter Ecclesine / Cisco Systems / 170 W. Tasman Dr.
MS SJ-10-5
San Jose, CA 95134-1706 / +1-408-527-0815 /
Minutes from October 30th 2007 TGy Teleconference Call
Agenda:
Preliminary11September Agenda:
1) Roll call
2) Approval of agenda
3) "Are you aware of, and understand the IEEE patent policy",
if not "Refer the correct section or IEEE Patcom URL"
4) Review and approve23 October minutes,07/2660r0
5)Review of comment validity rules and obligation to file a valid vote
a)Comments on changed text
b)Comments on text affected by changed text
c)Comments on text referred to by outstanding unresolved comments
d) 07/0360r4 Section 6.4
6) Discussion ofP802.11y D5.0,
LB-94-104-106-109-112 Comment spreadsheet, D5 comments,07/2623r2, Enablement and other comments (to be announced), and ECSA comments 07/2656r1.
7)Plansto work atAtlanta session and afterAtlanta
8) Any other discussion – nextteleconf6 November 13:00 ET forup to1.5 hours, discussing procedure for going to Sponsor Ballot,LB112, LB109, LB106, LB104and LB94 comments and submissions
9) Adjourn at or before14:30 ET
Proceedings:
- Chair calls telecon to order 13:03 ET
- Roll call –Peter Ecclesine (Cisco Systems), Rich Kennedy (ETS-Lindgren), Dan Lubar (Relay Services), Jim Raab (Dell), Scott Blue (self), Douglas Chan (Cisco Systems)
- Chair reviews proposed telecon Agenda and asks for approval of same
- Chair asks if anyone objects to accepting the agenda as stated. Hearing no objection, the telecon agenda is approved. Objections to approving the agenda. No reply is heard.
- Chair asks if anyone has not read the IEEE patent policy (Patcom Statement)
- Chair asks: "Are you aware of, and understand the IEEE patent policy? If not refer the correct section or IEEE Patcom URL: ”
- Chair asks: “..does anyone not understand the IEEE patent policy as read?" No reply is heard
- Chair asks: “Are there matters that the WG chair needs to be informed of related to essential patents?” No reply is heard
- Chair notes the Oct 23rd minutes are 07/2660r0, and asks if there are matters arising from the minutes. No reply is heard. Chair asks: “Is there any objection to approving the minutes unanimously?” No response is heard. 07/2660r0 Oct 23rdteleconference minutes are approved unanimously.
- The chair briefly reviewed comment validity rules and obligation to file a valid vote.
- Chair reviewed the 07/2683r0 comment resolution document
- CID 4021 Reject
- CID 4022 Accept
- Chair asked if anyone wants to look at any particular comments from the spreadsheet.
- CID 4023 Reject
- CID 3084 not a valid recirculation comment – Reject
- CID 4024 Reject
- CID 4002 Accept in Principle
- CID 4029 no definition for Action Frame No Ack
- CID 4011, 4012 and 4013 – Accept
- CID 4008 Accept
- CID 4025 Accept in Principle
- CID 4027 not a valid recirculation comment – Reject
- CID 4026 Accept in Principle
- CID 4041 Accept in Principle
- CID 4042 Accept in Principle
- CID 4017 and 4018 Accept
- CID 4015 Accept
- CID 4010 Accept in Principle
- CID 4009 Reject
- Chair stated he received an email from Steve Shelhammer asking for time on the TGy agenda in November. He responded that TGy does not have enough hours to make that happen; just two 2-hour sessions.Steve suggested the meeting to discuss document 19-07-0020-00-00 coexistence metrics in the 3650 band from Marianna Goldhammer. The document is not yet on the server. Asked if there will be meetings Tuesday PM2 and Wednesday PM2 for 802.19 discussion on coexistence metrics.
- Chair discussed the plan for November.
- Chair asked if there was any more discussion. Hearing none.
- Chair also stated that he may not be able to make the November meeting.
- Chair asked if there was any further discussion. No reply heard.
- Dan made a motion to adjourn, seconded by Scott. Chair asked if there were any objections to adjourning. Hearing none, the meeting was adjourned at 13:32 ET
References:
FCC 05-56 ( )
FCC 07-99 ( )
IEEE 802.11 Drafts (in IEEE 802.11 Member Area)
802.11-2007
P802.11k-D8.0
P802.11n-D2.05
P802.11r-D8.0
P802.11y-D4.00.pdf
TGy Reference Docs:
11-06-0571-00-000y-cbp-tg-telecon-minutes-19-april.doc
11-06-0607-00-000y-TGy-telecon-minutes-3May.doc
11-06-0668-01-000y-3650-3700-mhz-fcc-action.ppt
11-06-0680-01-000y-may-chairs-report.ppt
11-06-0740-00-000y-joint-tgy-rr-tag-may-minutes.doc
11-06-0855-03-000y-Annex-and-J-3650-MHz-band.doc
11-06-0863-02-000y-tgy-june-14th-2006-conference-call-minutes.doc
11-06-0864-04-000y-3650-mhz-mobile-service-enablement.doc
11-06-0867-02-000y-references-mobile-service-enablement.doc
11-06-0873-00-000y-tgy-june-28th-2006-conference-call-minutes.doc
11-06-0922-00-000y-tgy-july-11th-2006-conference-call-minutes.doc
11-06-0955-03-000y-ofdm-phy-3650-mhz-band.doc
11-06-1023-01-000y-proposal-tgy.ppt
11-06-1024-02-000y-tgy-july-chairs-report.ppt
11-06-1120-00-000y-Minutes-from-San-Diego-Plenary-2006.doc
11-06-1374-00-000y-aug15th-and-aug29th-2006-conference-call-minutes.doc
11-06-1427-00-000y-sept12th-2006-conference-call-minutes.doc
11-06-1432-01-000y-extended-channel-switch-announement-normative-text.doc
11-06-1433-00-000y-extended-channel-switch-announement-presentation.ppt
11-06-1466-01-000y-TGy-September-chairs-report.ppt
11-06-1536-00-000y-proprosed-draft-revision.doc
11-06-1537-00-000y-melbourne-minutes-september.doc
11-06-1561-00-000y-tgy-sept-26th-2006-conference-call-minutes.doc
11-06-1609-04-000y-tgy-internal-review-comment-submissions.xls
11-06-1830-00-000y-dse-in-licensed-band-operations.doc
11-06-1675-02-000y-tgy-November-chairs-report-ppt.ppt (from Dallas Plenary)
11-06-1865-00-000y-tgy-brief-intro-to-tgy.doc
11-06-1871-00-000y-TGy-2006-Dallas-Plenary-Minutes.doc
11-06-1934-05-000n-tgn-opening-report-london-jan-07
11-07-0008-09-000y-tgy-lb94-comment-spreadsheet
11-07-0098-03-000y-tgy-january-chairs-report
11-07-0121-00-000y-tgy-meeting-minutes-from-jan-2007-london-interim-session
11-07-0224-00-000y-TGy-Jan-30th-Telecon-Minutes.doc
11-07-0245-02-000y-TGy-LB94-7-10-11-Submission.doc
11-07-0251-00-000y-TGy-February-13th-Telecon-Minutes.doc
11-07-0270-00-000y-TGy-LB94-3-4-5-6-9.8-Submission.doc
11-07-0271-01-000y-11-07-0271-00-000y-TGy-LB94-a-d-i-j-submission-doc.doc
11-07-0272-00-000y-phy-comments.doc
11-07-0282-00-000y-TGy-LB94-17-etc-Submission.doc
11-07-0291-00-0007-TGy-February-27-telecon-minutes.doc
11-07-0373-01-000y-tgy-march-opening-report
11-07-0392-00-000y-tgy-redline-between-draft-d1-0-and-d1-1
11-07-0395-00-000y-tgy-meeting-minutes-mar-2007-orlando-plenary
11-07-0401-03-000y-long-slottime-option-rtscts-procedure
11-07-0473-00-000y-tgy-lb94-submission-editors-resolutions
11-07-0479-00-000y-tgy-redline-between-d1-0-and-d1-2
11-07-0602-06-000y-d2-comments
11-07-0603-01-000y-lb104-dse-reporting-cid-1093
11-07-0673-03-000y-lb104-non-editorial-comments
11-07-0674-04-000y-lb104-editorial-comments-submission
11-07-0679-04-000y-tgy-may-opening-report
11-07-0783-01-000y-meeting-minutes-may-2007-montreal-interim
11-07-0801-01-000y-3-and-11-14-submission
11-07-0821-00-000y-tgy-may-closing-report
11-07-1974-01-000y-tgy-june-5th-telecon-minutes.doc
11-07-2038-02-000y-tgy-june-26th-telecon-minutes.doc
11-07-2060-00-000y-tgy-july-3rd-telecon-minutes.doc
11-07-2066-01-000y-coexistence-assurance
11-07-2105-00-000y-july-10th-telecon-minutes
11-07-2143-03-000y-tgy-july-opening-report
11-07-2197-00-000y-discussion-on-cca-ed
11-07-2208-02-000y-802-11y-conditional-sponsor-ballot-report
11-07-2263-00-000y-tgy-july-closing-report
11-07-2264-00-000y-tgy-redline-between-draft-3-2-and-3-1
11-07-2268-00-000y-tgy-redline-between-draft-4-0-and-3-0
11-07-2353-01-000y-august-28th-telecon-minutes.doc
11-07-2366-00-000y-tgy-sept-4th-telecon-minutes
11-07-2382-00-000y-lb109-non-editorial-comments
11-07-2383-01-000y-lb109-editorial-comments
11-07-2384-00-000y-lb109-dse-comments
11-07-2464-01-000y-tgy-sept-opening-report
11-07-2480-00-000v-lb108-ecsa-comment-resolutions
11-07-2505-00-0000-meeting-minutes-sept-2007-waikoloa-interim (this document)
11-07-2571-00-000y-tgy-d4-0-submission-for-mib-changes
11-07-2579-00-000y-redline-between-draft-4-2-and-4-0
11-07-2623-01-000y-D5-comments.xls
11-07-2655-00-000y-tgy-oct-16th-telecon-minutes
11-07-2656-00-000y-LB112-ECSA-comments
11-07-2660-00-000y-october-23rd-telecon-minutes
11-07-2683-00-000y-lb112-submission-for-non-ecsa-comments
11-07-2702-00-000y-tgy-oct-30th-telecon-minutes (this document)
Acronyms/Abbreviations
CBP – Contention-Based Protocol
CCA – Clear Channel Assessment
CSA – Channel Switch Announcement
CSMA/CD – Carrier Sense Multiple Access/Collision Detect
DFS – Dynamic Frequency Selection
DSE – dependent station enablement
E-CSA – Extended Channel Switch Announcement
ED – Energy Detect
LCI – Location Configuration Information
PICS – Protocol Implementation Conformance Statement
STA – Station
TPC – Transmit Power Control
Submissionpage 1Rich Kennedy, OakTree Wireless