Westlake High School Technology & Engineering Education Dept.
(ADV.) TECHNICAL DRAWING/DESIGN HONORS - LEVEL III
Assignments
1st Qtr. assignments Timeline
1. Summer activities/reading assignments Summer break
2. "Concept Structure" (incl.mass/shape/form/style/character/materials) 8-9 days
a. 4-5 days to construct
b. 3-4 days to draft 2 point perspective - add details on 2 pt.
c. see handout; see "Architecture" book by Kicklighter - pg. 407______week 2
3. "10 Basic House Styles/Designs" (see student examples) – if time permits 4-5 days___week 3
4. "Foam Core Model" (see student examples) or Contest 12-14 days_week 5
5. "Contracting a Home" - Vol. 1 & 2 video (take notes) - OPTIONAL 4-5 days
6. "Exploded Pictorial" (Hepler/Wallach book - pg. 398 or 410) - OPTIONAL 5-6 days
7. "Production Set" (see handout & student examples) 17-18 days_week 9
2nd Qtr. assignments
1. “Matte Board Model Mock-up” (for Home/Garden Show or State Conf.) 9-11 days
2. “Student Model Home Design Contest” remainder week 18
3rd Qtr. assignments
1. NorthEast Ohio Science and Engineering Fair (NEOSEF) 40 days week 23 2. Concurrent - Ohio Technology & Engineering Educators Association State Conference Project
3. *“Concept Car” - see handout/student examples/Stehrenberger examples 10 days___week 25
4. *”Tech Modules” (Advanced AutoCad LT, Vinyl Graphics, 3D Modeling, etc.) 10 days___week 27
5. *“Logo Re-Design” (for local company, individuals, etc.) * = if time permits
4th Qtr. assignments
1. “Technology Poster Power” – 7 technological systems (a,b & c size) 10-15 days____week 28
2. “Powerpoint of Tech Posters” 5 days____week 31
3. “Elevation Rendering” (add color, background, materials through Photopaint) 5 days____week 32
4. “Vinyl Graphic W” (design and cut out W w/ vinyl sign making machine) 5 days____week 33
5. “Wall of Fame Induction” (make and hang new Tech grads on wall) 5 days____week 34
6. “Contest/Service Project 10 days week 35
If time permits:
> “Business Card/Logo” (see examples) 5 days
> “Wall Graphic” (see examples) 9-10 days
> “Airbrush Phantom Project” (see examples) 14-15 days
> “Independent Project” (see handout) 14-15 days
Special Assignments (At any time and/or if time permits):
.....Service project/ Interdisciplinary project
.....Complete activities for other and/or new TechEd Modules
.....Advanced assignment(s) on AutoCad, INVENTOR, REVIT, other appropriate software programs
…..Contests, Competitions, Fundraisers, Grant projects, etc.