REPORT NUMBER DO-30543 TE/ABT
TITLE Supply of 575 Pairs of Connectors for a shielded twisted pairs high voltage cable for fast pulsed system
CERN Abstract
This technical specification concerns the design, manufacture, conformity tests, delivery to CERN and documentation
of a connector for a shielded twisted pairs high voltage cable used in fast pulsed system.
Deliveries are foreseen over 18 weeks from placement of the contract.
The supply shall include:
• The design of the connectors (chassis and cable connectors);
• The manufacture of :
- Pre-series of 40 pairs of high voltage shielded twisted connectors;
- Series of 535 pairs of high voltage shielded twisted connectors.
• The conformity tests of the connectors;
• Five crimping tools (if specific tools are required for cable assembly on the connector);
• The assembly notice;
• The packing;
• The transport to CERN (if ordered);
• Documentation.
Start Time 25-May-17
End Time 15-Jun-17
Cost Range ILO - <200K
ACTIVITY CODE 03020400
Main Category Electronics and Radio Frequency
Sub Category Passive components
Category Connectors
İhale Dokümanlarını İncelemek için à TIKLAYINIZ
REPORT NUMBER DO-30660 EP
TITLE Supply of FPGA components M2GL090-FGG484 from MICROSEMI
CERN Abstract
This technical specification concerns the supply of 3600 FPGA product M2GL090-FGG484 from IGLOO2 MICROSEMI 65 nm family flashed by the company with a dedicated firmware provided by CERN.
Products have to belong to the same production batch, or very close ones, produced in 2017 or after in the same production site and have to be SEU immune. They must be produced all with the same revision version. Traceability information has to be provided for each component.
The delivery of a sample of at least 2 FPGA flashed with the CERN firmware is required to be within 5 weeks after the submission of the firmware by CERN to the company, following the entry into force of the contract. A first batch of a minimum of 1000 components is required to be delivered within five weeks after CERN’s acceptance of the samples, while the remaining 2600 FPGA are required to be delivered within eighteen weeks after CERN’s acceptance of the samples. CERN reserves the right to purchase 1500 additional supply.
Start Time 23-May-17
End Time 13-Jun-17
Cost Range ILO - <200K
ACTIVITY CODE 03010500
Main Category Electronics and Radio Frequency
Sub Category Active components
Category Integrated Circuits
İhale Dokümanlarını İncelemek için à TIKLAYINIZ
REPORT NUMBER DO-30555 EP/ATLAS
TITLE Supply of the Borate polyethylene Shieldings for the ATLAS New Small Wheel Upgrade
CERN Abstract
This technical specification concerns the supply of the new JD and Hub shieldings, which are part of the NSW complete
assembly.
It concerns only the parts made out borate polyethylene and HD polyethylene.
Start Time 25-May-17
End Time 08-Jun-17
Cost Range ILO - <200K
ACTIVITY CODE 05040501
Main Category Mechanical Engineering and raw materials
Sub Category Fabrication technologies
Category Fabrication techniques for non-metals
Section Machining of non-metals (fibreglass, ceramics …)
İhale Dokümanlarını İncelemek için à TIKLAYINIZ
REPORT NUMBER DO-30610 EN/MME
TITLE Supply of Extruded Aluminium Tubes for SPS coax-lines ID345
CERN Abstract
The purpose of this price enquiry is the award of a contract for the supply of Extruded Aluminium Tubes.
--Manufacturing
The contractor shall be responsible for the production of its own manufacturing drawing, applicable to its organization
and production methods, in order to produce component in compliance with CERN technical drawing.
The tubes shall be produced only by extrusion technology. Other manufacturing technologies shall not be used.
CERN reserves the right to be present, or to be represented by an organization of its choice, to witness any phase of
manufacturing process.
In order to verify the dimensions and tolerances of pre-series units, a possible technical visit will be take place in the
contractor’s premises.
--Physical property
The extruded aluminium tubes shall have an electrical resistivity at 20°C less than 3.9∙〖10〗^(-8) Ω∙m.
Metrology and control
CERN reserves the right to be present, or to be represented by an organization of its choice, to witness any tests carried
out at the contractor's premises. The contractor shall give at least 10 working days’ notice of the proposed date of any
such control.
All supply shall be controlled in order to be conform to drawing.
--For the pre-series units, the following tests will be perform at CERN:
1) Metrology test on 2 tubes randomly chosen
2) Electrical resistivity test on the 2 remaining tubes.
Start Time 25-May-17
End Time 15-Jun-17
Cost Range ILO - <200K
ACTIVITY CODE 05010204
Main Category Mechanical Engineering and raw materials
Sub Category Metallic raw materials, finished and semi-finished
products
Category Metallic pipes, tubes, rods, bars and profiles
Section Aluminium, aluminium alloys
İhale Dokümanlarını İncelemek için à TIKLAYINIZ
REPORT NUMBER DO-30664 EP
TITLE Storage platform with an integrated grey room at LHCb Point8
CERN Abstract
This technical specification concerns the design, manufacturing and installation of a storage platform with an
integrated grey room below the platform.
Deliveries are foreseen over 2 months from placement of the contract.
2.1 Deliverables Included in the Supply
The supply shall include:
·The design of the platform structure and related technical report.
·The design of the grey room and related technical report.
·The design calculations and a CE certificate of conformity of the structure.
·The production drawings , by means of paper and computer readable files
·The manufacturing of the platform structures, its stairs and the grey room;
·The installation of the platform structure and the grey room at CERN;
·All manpower, equipment and tools needed for the assembly at CERN;
·Declaration of conformity of the delivered items, by means of paper and/or computerreadable files;
·Quality control report;
·Safe packaging and transport to CERN.
·Documentation.
2.2 Activities at the Contractor’s Premises
The contractor shall perform the following activities at his premises:
·Design;
·Manufacturing;
·Packing, and shipping if required by CERN (see § 4.4).
Production shall not start before CERN has given its formal approval in writing.
2.3 Activities on the CERN Site
The contractor shall execute the following activities on the CERN site in France:
·Installation; Commissioning;
Start Time 25-May-17
End Time 21-Jun-17
Cost Range ILO - <200K
ACTIVITY CODE 01010203
Main Category Civil engineering, building and technical services
Sub Category Civil engineering
Category Foundation work
Section Berlin-type walls
İhale Dokümanlarını İncelemek için à TIKLAYINIZ
REPORT NUMBER DO-30652 BE/CO
TITLE Supply of FmcAdc100M14b4cha (EDA-02063) boards
CERN Abstract
This technical specification concerns the supply of 190 assembled and tested FmcAdc100M14b4cha printed circuit
boards, also known as EDA-02063 boards.
The delivery of the pre-series of 20 boards is required to be within 17 weeks following the entry into force of the
contract, while the remaining 170 boards are required to be delivered within ten weeks after CERN’s acceptance of
the pre-series.
The supply shall include:
• Assembled and tested printed circuit boards;
• Component traceability list (see § 4.3.2);
• The test results:
o Conformity of PCB production quality (see § 4.2);
o Conformity of PCB assembly quality (inspection report, e.g. IPC-610) (see § 4.5.1);
o Conformity of ionic residues (IPC/EIA J-STD-001, Cleanliness Designator C-22 &
section 8.3.6), tested on 10% of the boards (see § 4.5.1);
o Conformity of mechanics (visual inspection report) (see § 4.5.2);
o Production test results (see § 4.5.3);
o Test and Measurement reports and Certificate of Conformity of the final supply (see § 4.7).
Activities of the Contractor
The activities the contractor shall perform shall include:
• The manufacturing of the PCBs (see § 4.2);
• The purchase of the components and materials according to the BOM (see § 4.3);
• The manufacturing of mechanical parts (see § 4.3);
• The assembly of the PCBs followed by testing for ionic residues (see § 4.4.1);
• The assembly of the mechanical parts (see § 4.4.2);
• The final functional testing of the boards (see § 4.5.3);
Start Time 31-May-17
End Time 28-Jun-17
Cost Range ILO - <200K
ACTIVITY CODE 03030300
Main Category Electronics and Radio Frequency
Sub Category Electronic assembly and wiring work
Category Assembly and wiring with technical design study and testing
İhale Dokümanlarını İncelemek için à TIKLAYINIZ