DraftAGENDA – Subcommittee 11 (Field Operating Equipment)
Exploration Production Standards Conference on Oilfield Equipment and Materials
Renaissance Worthington Hotel, Ft. Worth, TX, USA
Wednesday, January26, 2011
API Subcommittee 11 Chair: Bryan Freeman
API Subcommittee 11 Secretary: Tom Van Akkeren
9:00 AM –12:00 Noon
Agenda Items:
- Attendance – Ed Baniak
- Adoption of the Agenda – Bryan Freeman
- Ratify the Summer 2010Washington, DC meeting minutes (attached) – Bryan Freeman
- Review 2010SC11 ballot actions – Ed Baniak
- Ballot 2091 – API Std 11D2, 1st Edition (Closed9/8/2010), Published October 2010
- Review other2010/2011actions – Ed Baniak
a.Spec 11B, Errata 1, Published October 2010
- Report or Update from Burt with regards to ISO updates. Bert Dijkhuis
- Report/Updates from task groups
- 11S Suite of RPs – Norm Hein
- 11AX Revision–Benny Williams
- 11B Corrections – Benny Williams
- 11BR Revision – Darrell Copsey
- 11E Revision – David Doyle
- 11G Revision – David Doyle
Action Item 6/30/10: SC11 Chair to approach the 11S Suite revision chair and discuss the status of the document revisions in order to ensure that activity commences immediately.
Action Item 6/30/10: SC11 Chair to approach those people interested in the revision of API 11S-suite of documents to determine if one or several would be willing to take on the revision of the documents as chair(s).
Action Item 6/30/10: SC11 Chair to approach the ISO 15551 project lead to determine how the API documents are intended to be used in the ISO document.
- API SC11 and ISO Cooperation –Bryan Freeman/Bert Dijkhuis
- Standard ISO 15551 Electric Submersible Pumps
- Standard ISO 15136-3 Progressing Cavity Pumps–Drive Strings
- New Business
- Upcoming Meetings:
a.API Summer Standards Conference in San Francisco, CA (June 27-July 1, 2011)
b.API Winter Standards Conference in Ft. Worth, TX (January 23-27, 2012)
- Adjourn
Draft Minutes – Subcommittee 11 (Field Operating Equipment)
Exploration and Production Standards Conference on Oilfield Equipment and Materials
Joint API Subcommittee11& ISO/TC67/SC4/WG4– Field Operating Equipment
Hyatt Regency Washington on Capitol Hill, Washington, DC, USA
Wednesday, June 30, 2010
API Subcommittee 11 Chair: Bryan Freeman
API Subcommittee 11 Secretary: Tom Van Akkeren
ISO TC67/SC4/WG4 Convenor: Bert Dijkhuis
1:00 PM – 5:00 PM
Agenda Items:
- Attendance – Ed Baniak
Ed Baniak volunteered to take the minutes since the secretary was absent.
Attendance sheet was sent around the room (see Attachment A)
Quorum was not established (required 9 and only 7 voting members present)
- Adoption of the Agenda – Bryan Freeman
Agreed to move item 9 to position 4. MSP to accept agenda as amended.
- Ratify the Winter 2010New Orleans meeting minutes (attached) – Bryan Freeman
MSP by those present to accept the minute
- Review 2009 ballot outcomes – Ed Baniak
Ballot 1889 – API Spec 11B, 27th Edition (Closed 12/22/2009), Published May 2010
- Review proposed 2010 ballots – Ed Baniak
Proposed back-adoption of ISO 15136-1 (PCP – Pumps, Published November 2009) as API 11D2
MSP made to send a ballot for ISO 15136-1 as API 11D2.
- New Business
- 15136-3: New work item in 2009 for drive strings for PCP. First meeting in September in Calgary or Edmonton. Core group should have a balance between manufacturers and users. Seeking input from people who will be available on a regular basis.
- 15551-1: New item on ESP pumps. The goal is to have both informative and normative annexes. Wants to have a CD document ready for the ESP meeting in April 2011.
- The first meeting of 11BR has occurred and assignments have been made. This is being worked to correct problems with the document (for industry) and to align it with the new API 11B. Expect that the document will be ready for ballot by the middle of 2011.
- Report / Update from Bert Dijkhuis with regards to ISO activities. Bert Dijkhuis
There are about 20 projects inISO/TC67/SC4/WG4. The documents are under various stages of revision. The WG is looking for new subjects. There are two projects for SSSVs up for revision. There are 3 new projects (drive strings for PCP [tied to API SC11], the ESP document [tied to API SC11] and completion accessories [tied to API SC19]).
Discussions centered on the use of the 11S documents. With the lack of progress on the API side and quick development on the ISO side, there is a potential for a large gap being generated. There is concern that there may not be compatible documents (ISO and API).
Action Item: SC11 Chair to approach the 11S Suite revision chair and discuss the status of the document revisions in order to ensure that activity commences immediately.
Action Item: SC11 Chair to approach those people interested in the revision of API 11S-suite of documents to determine if one or several would be willing to take on the revision of the documents as chair(s).
Action Item: SC11 Chair to approach the ISO 15551 project lead to determine how the API documents are intended to be used in the ISO document.
ISO/TC67/SC4/WG4 was given the task to develop a new standard on well integrity for the production phase (exclusive of the drilling phase). If there is interest in becoming a participant on this standard, ISO will welcome input.
- Report/Updates from task groups
- 11AX Revision–Benny Williams
The WG is making progress on the revision of the document. Meeting scheduled for the 1st week of August in Midland, TX. Scope of the document changed to include verification of materials. Adding proposed 12 new products that would be eligible for Monogramming. The WG is looking at the dimensions of existing products. The WG is considering mid 2011 as the target date for the document to be ready for ballot. WG is to look at this timeline in January 2011 to see if the document.
- 11B Revision – Benny Williams
Document published and will be effective in November 2010. There are two errata that have been identified and will be issued soon. There are some tolerance differences to allow for a wider face make-up. These are intentional changes.
- 11G Revision – David Doyle
Most of the work is being done with a small number of individuals. There is input from BP and other companies, but most of the work is internal to Lufkin. The WG is adding structural bearings and lubrication (including the possibility of synthetic greases), wireline maintenance, v-belt maintenance, brake system maintenance, structural bolted joints, isolation restraint (lock-out/tag-out). Some of the safety issues may need to be brought to the front of the document. The document title may change to include “maintenance”. Target date is late 2010 for having a document ready for ballot.
- 11S Suite of RPs – Norm Hein
No report submitted. The SC11 chair will approach the WG chair to determine the status of the documents.
- Proposed Revision of API Spec 11E – David Doyle/Darrell Copsey
There is a proposed Annex K to the document on double circular arc gearing submitted by China. There have been difficult times in getting information from China on the source documents of the proposal. There was no other person/organization that has been approached to provide clarification on this document. There has been no additional information provided, so the chair of the WG proposes that this activity be discontinued. When additional information is provided, the SC will entertain re-activating the project based on the submission of a new work item proposal.
Furthermore, with API 11E, there have been discussions on including metric units in the document. The WG created a parallel document with just metric units and track it through the entire document. The question was what to do with the metric-based document. Should there be two different documents (one in SI units and one in USC units) or should there be just one document with everything in one combined document? The SC decided to proceed with the development of one unified document at this time. A final decision will be made at the next SC meeting as to what needs to be done with the document.
- API SC11 and ISO Cooperation – Bryan Freeman/Bert Dijkhuis
- Standard ISO 15551 Electric Submersible Pumps
- Standard ISO 15136-3 Progressing Cavity Pumps – Drive Strings
Items discussed in ISO review above.
10. Upcoming Meetings:
a.API Winter Standards Conference in Ft. Worth, TX (January 24-28, 2011)
b.API Summer Standards Conference in San Francisco, CA(June 27-July 1, 2011)
11. Adjourn
Meeting adjourned at 4:00 PM