Techincal Analysis Study Report

Delmarva Power C&I Energy Savings Program

Technical Analysis Study Report (TASR)

PROJECT: (TITLE)

Version: (x.x)

Submitted By:

(ABC COMPANY)

(Company Address)

(Company City/Town, State, ZIP Code)

(if a consultant or contractor prepared the report )

Report Prepared by:

(NAME OF CONSULTANT/CONTRACTOR)

(Address)

(Address)

Month Day, Year

Date / 1 / Company Name

Confidential Information – Not for Distribution

Techincal Analysis Study Report

INSTRUCTIONS

The purpose of this report is to provide program partners and program participants an easy to use, pre-approved Technical Analysis Study Report template. This template will help you capture the necessary data needed to expedite the review, evaluation and approval of projects.

Items highlighted in YELLOW represent data that you will need to provide in the report.

Items highlighted in GREEN provide you with instructions and clarifications on information, descriptions, or data needed to evaluate the project.

(Please delete this page and all text in Green before submitting the report)

DISCLAIMER

This report is not intended to serve as an engineering design document, but is intended to provide estimated energy efficiency savings associated with the proposed Project. The information and recommendation represented in this report have been reviewed for their technical accuracy and are believed to be reasonable and correct.

Delmarva Power or Lockheed Martin are not liable if the projected estimated savings or economics are not actually achieved because of varying operating conditions. All savings and cost estimates are for informational purposes, and are not to be construed as a design document or as guarantees. The customer should independently evaluate the information presented in this report, and in no event will Delmarva Power or Lockheed Martin be held liable if the customer fails to achieve a specified amount of energy savings, operation of their facilities, or any incidental or consequential damages of any kind in connection with this report or the installation of the recommended measures.

Information in this report shall be held confidential by Lockheed Martin and/or Delmarva Power, and shall not be disclosed to any other parties for any reason without expressed permission from the submitting company. The only exceptions to this non-disclosure are program evaluation contractors under Delmarva Power who may need access to these and all program related data.

Date / 1 / Company Name

Confidential Information – Not for Distribution

Techincal Analysis Study Report

Contents

Page
1 / section 1: Overview and summary / 1-1
1.1 Electricity Usage / 1-
1.2 Project Summary / 1-
1.3 Electricity Savings Estimate / 1-
1.3.1 Program Baseline / 1-
1.4 Project Economics / 1-
2 / Section 2: PROJECT DETAILS / 2-
2.1 EEM-1: ______/ 2-
2.2 EEM-2: ______
Add or subtract EEMs as needed / 2-
3 / SECTION 3: NEXT STEPS: IMPLEMENTATION / 4-
APPENDIX A: program incentives / A-1
Appendix B: TECHNICAL ANALYSIS STUDY CONTACTS / B-1
Appendix C: PROJECT CAPITAL COST ESTIMATES / C-1
Appendix d: PICTURES OF EXISTING EQUIPMENT / D-1
Appendix e: SUPPORTING CALCULATIONS AND DATA / E-1
Date / 1 / Company Name

Confidential Information – Not for Distribution

Techincal Analysis Study Report

1. OVERVIEW AND SUMMARY

The benefits and costs of installing Name of Project at ABC Co. are summarized in this report. THIS IS A VERY BRIEF INTRODUCTION TO THE PROJECT. SHOULD BE SHORT AND TO THE POINT

This report is prepared through the Delmarva Power C&I Energy Efficiency Program - Custom Incentives. The Program is designed to assist Delmarva Power’s commercial and industrial sector customers with energy-efficiency and energy-saving investments by preparing technical analysis studies and providing capital-improvement financial incentives.

·  BRIEF DESCRIPTION OF COMPANY: ADD HERE A BRIEF SUMMARY OF WHAT FACILILTY DOES OR MAKES: ABC Co. produces xxxxxxx.

·  ANNUAL ELECTRICITY USAGE: XXX.X GWh was purchased from Delmarva Power in calendar year 20xx.

·  BRIEF SUMMARY OF CURRENT PROJECT: The current project involves installing XXXXXXXXX. This will allow ABC Co. to BRIEF DESCRIPTION OF BENEFITS OF PROJECT (BOTH ELECTRICITY USE AND PRODUCTIVITY ENHANCEMENT).

With this overview, details of the project and the Program are presented in the remainder of this report. THE ROADMAP OF THE REPORT GOES HERE, IMPORTANT TO SOLIDIFY FLOW. TAILOR AS NEEDED.

·  Section 1 contains a discussion of company operations and electricity usage, a high-level summary of the Name of Project Project, estimates of project electricity savings, and a summary of the project economics.

·  A more detailed description of the project  including discussions of existing equipment, planned improvements, and the method used to estimate project benefits  are presented in Section 2.

·  This is followed in Section 3 by a discussion of the method for verifying savings.

·  Section 4 presents a description of the next steps.

·  The appendices contain a summary of Program incentives, study contacts, project capital cost estimates, pictures of existing equipment, and supporting calculations and data.


1.1 Electricity Usage

Current monthly electricity use by is summarized in Exhibit 1 below.

PLEASE ENTER THE LAST 12 MONTHS OF BILLING HISTORY IN THE TABLE PROVIDED BELOW.

Exhibit 1-1
Electricity Usage
Electricity Usage / Monthly kWh / Monthly Peak kW / Production (Units)*
Month 1
Month 2
Month 3
Month 4
Month 5
Month 6
Month 7
Month 8
Month 9
Month 10
Month 11
Month 12
Total / N/A
* Production data only for process improvements in manufacturing plants


1.2 Project Summary

High-level description of project, with benefits. THIS IS A SUMMARY OF THE PROJECT, INCLUDING INFORMATION ON INSTALLATION PLANS (IMPORTANT, IF NOT KNOWN, SAY SO).

·  High-level description of current process/equipment

·  High-level description of planned improvement

·  Installation plans, with dates (project start and completion).


1.3 Electricity Savings Estimate

It is estimated that electricity use will be reduced by XXX MWh, Y% of current Name of End Use usage. IN THE CASE OF A DETAILED CALCULATION, THE BOTTOM LINE WILL GO HERE, WITH A BRIEF EXPLANATION OF METHOD BELOW.

·  This estimate is based on . . . A summary of the calculations is provided below. (Details are provided in Appendix E). INCLUDE APPENDIX E ONLY IF NEEDED.


1.3.1 Program Baseline

PROVIDE A DESCRIPTION OF THE PROGRAM BASELINE, INCLUDING SOURCE. FOR EXAMPLE: This is an energy efficiency improvement project. The baseline is current energy usage levels. Production levels are not expected to change substantially in the near future.


1.4 Project Economics

Highlights of project economics are summarized in Exhibit 2 below.[1] NOTE THAT THE TOTAL ANNUAL kWh SAVINGS NEED TO BE ALLOCATED ACROSS FOUR TIME PERIODS.

Exhibit 2 / USE A COLUMN FOR EACH
ABC Company PROJECT NAME Project / EEM WHEN THERE IS MORE
Project Economics / THAN ONE IN A PROJECT
Category / Totals / EEM-1 / EEM-2 / EEM-3
Annual Electricity and Demand Savings
Total Annual Electricity Savings [kWh]
June – Sept./Weekdays* 7am to 11pm
June – Sept./All other times
Oct. – May/Weekdays* 7am to 11pm
Oct. – May/All other times
Demand Savings [kW]
Average Electricity Rate [$/kWh]
Annual Electricity Cost Savings / $0 / $0 / $0 / $0
Gross Project Cost applicable to Electricity1 / $0 / $0 / $0 / $0
Incentive [$] / $0 / $0 / $0 / $0
Net project Cost [$] / $0 / $0 / $0
Simple Payback [Years]
Without Incentive
With Incentive

EEM = Energy Efficiency Measure

* Weekdays excluding holidays

As noted in the footnote, a breakdown of the Gross Total Project Cost should be provided in Appendix C. If the project saves both electricity and fuel, only the cost that is applicable to electricity savings should be shown in Exhibit 2. Explain and show in Appendix C how the cost allocation was developed.


2. PROJECT DETAILS

WHERE THE PROJECT IS COMPRISED OF MORE THAN ONE EEM, THERE WILL BE SEPARATE SECTIONS (2.1, 2.2 . . .); ONE FOR EACH EEM. IF THE PROJECT CONSISTS OF A SINGLE EEM, DETAILS WILL BE PLACED IN SECTION 2, WITH NO SUBSECTIONS.

Details of the Project name Project for ABC Company are presented in this section. Each section contains a description of the existing conditions, the recommended opportunity, and the energy savings/productivity enhancement calculations.

IF ONLY ONE OPPORTUNITY, OMIT “2.1”:

2.1 EEM-1: ______

2.1.1 Description of Existing System/Equipment and Operating Schedule

Currently, . . . Provide detailed description of existing system and equipment(ratings, age, condition) will be presented here (including tables, as available)

2.1.2 Description of Proposed Upgrade

Replacing . . . . Provide a detailed description of planned equipment here (including tables, as available)

2.1.3 Method for Estimating Project Benefits

DESCRIBE HOW BENEFITS (ENERGY SAVINGS/PRODUCTIVITY ENHANCEMENTS) WERE ESTIMATED: METHOD; MONITORING, IF ANY; REFERENCES; CALCULATIONS (INCLUDING REFERENCE TO APPROPRIATE APPENDICES AND ATTACHMENTS)

Estimates of project electricity savings were made by . . . Add description here


2.2 EEM-2: ______

2.2.1 Description of Existing System/Equipment and Operating Schedule

Currently, . . . Provide detailed description of existing system and equipment(ratings, age, condition) will be presented here (including tables, as available)

2.2.2 Description of Proposed Upgrade

Replacing . . . . Provide a detailed description of planned equipment here (including tables, as available)

2.2.3 Method for Estimating Project Benefits

DESCRIBE HOW BENEFITS (ENERGY SAVINGS/PRODUCTIVITY ENHANCEMENTS) WERE ESTIMATED: METHOD; MONITORING, IF ANY; REFERENCES; CALCULATIONS (INCLUDING REFERENCE TO APPROPRIATE APPENDICES AND ATTACHMENTS)

Estimates of project electricity savings were made by . . . Add description here

The increase in output generated by the project was estimated by . . . Add description here


3. NEXT STEPS: IMPLEMENTATION

Upon receipt of pre-installation Approval of this project and an Incentive Offer from the Program Office, the next steps in the process are:

·  The customer shall select a contractor/vendor if it has not already done so.

·  The customer shall, if costs of the project change based on selection of a contractor /vendor, notify the Program Office of that change.

·  The Program Office will then issue a revised pre-approval.

·  The customer shall complete the installation of the project.

·  When the project is complete, the customer will notify the program office and will provide detailed information on variations between this study report and the actual installation and planned operation of EEM equipment.

·  Upon satisfactory completion of a post-installation inspection (if required), and receipt and review of all final project documentation, we will prepare the incentive check and forward it to the customer or their designated payee.

Date / 1 / Company Name

Confidential Information – Not for Distribution

Techincal Analysis Study Report

APPENDIX A: PROGRAM INCENTIVES

Incentives are calculated based on the difference between the baseline (pre-project) electricity usage and enhanced (post-project) electricity usage.

·  Productivity enhancements qualify for incentives when they reduce electricity use per unit of production.

·  In many “support” applications (HVAC and lighting systems) output will not change, so the incentive is based on the amount of electricity saved.

The program will pay incentives based on the annual energy savings resulting for the project, after the project has been completed and installation has been inspected and verified to result in the savings estimated in this report, or on an adjusted savings based on the actual project installed, if it varies from the project planned and described in this report. The rate used (in cents per annual kWh saved) shall be determined by the Delmarva Power program office.

Incentives will usually be restricted so that the project simple payback after incentives is no less than 1.5 years. (Projects which payback in less than 1.5 years will not be given incentives.)

Projects that result in annual energy savings of less than 50,000 kWh are discouraged. (The cost of applying for and approving and processing such small projects is not justified.)

Incentive will be limited to $250,000 per Delmarva Power electric account (including all incentive applications in a program year. And no customer (via multiple accounts) shall be eligible for more than $500,000 in program incentives in a single program year.

Incentives for any project shall not exceed 50% of the total installed project cost.


APPENDIX B: TECHNICAL ANALYSIS STUDY CONTACTS

Exhibit B-1
Project Feasibility Study Contacts
Name / Role / Organization / Contact Information
John Energy Saver / President / ABC Company / Office Phone: Cell Phone: Email:
Joe Trade Ally / Project Engineer / Trade Ally A / Office Phone: Cell Phone: Email:


APPENDIX C: PROJECT CAPITAL COST ESTIMATES

The estimated capital cost of the project is presented in Exhibit C-1.

Exhibit C-1
ABC Company Name of Project
Capital Cost Estimate
Item / Cost / % / Total Capital Cost
Grand Total
EEM #1 Sub Total:
Hardware
Freight
Sales Tax
Labor
Contingency
EEM #2 Sub Total:
Hardware
Freight
Sales Tax
Labor
Contingency
EEM #3 Sub Total:
Hardware
Add rows as needed to include all EEMs
List Sources Whenever Possible

If the project saves both electricity and fuel, only the cost that is applicable to electricity savings should be shown in Exhibit 2. Explain and show HERE how the cost allocation was developed.


APPENDIX D: PICTURES OF EXISTING EQUIPMENT

Pictures of the existing equipment are presented here as input to the Pre-Installation Inspection.
Provide if available


APPENDIX E: SUPPORTING CALCULATIONS AND DATA

TO AVOID MAKING THE STUDY TOO LONG, PUT THE IMPORTANT INFORMATION HERE, DETAILED DATA IN AN ELECTRONIC ATTACHMENT.

Date / 1 / Company Name

Confidential Information – Not for Distribution

[1] Details for the capital cost estimate are provided in Appendix C.