ORLY REPATO DUCHA

ADDRESS P.O. Box 17185 Kifaf Bldg.Flat # 3 Karama,DubaiU.A.E.

Mobile No.+971559282242 / +97339883624

Email

______

OBJECTIVES:

A position in electrical engineering to perform related duties as assigned or required to meet company’s goal and objectives.To contribute in the development process of the company in leading the efficient and technical excellence in service.

WORK EXPIRIENCES: Experience in design calculation, project execution and implementation, project management and safety implementation.

Company:Arif and Bintoak Consulting Architects and Engineers

Address:P.O. Box 3670 3rd Floor Arif and Bintoak bldg. Karama Dubai U.A.E.

Date:November 25, 2006 up to present

Position:Electrical Engineer

Projects:Project Name:Jumeira Beach Residence Hotel

Project Manager: Mace International

Plot No.HO4-07

Project Location: Sector 04,DubaiMarina

Project Cost:Dhs 114,800,000

No. of Floors:1-Basement + 3 floors + 20 Typical floors

Project Name:Marina Quay’s

Project Manager;Emaar Properties

Plot No.392-00 (8FGH)

Project Location: Marsa Dubai

Project Cost:Dhs 365 million

No. of Floors:

Tower F – G+41 Podium: (3 Base + G+2)

Tower G – G+11 Villa 1 – G+3 Tower H – G+11 Villa 2 – G+4

Villa 1 – G+3

Project Name: Proposed Residential Development on Plot No. 124-531

Owner;Abdulla Gargash

Project Location: Al Muraqabat Dubai

No. of floors3 Basement+G+7+ Roof

Project Name: Proposed Commercial & OfficeBuilding Plot No. 373-1343

Project Location: Al Barsha Dubai

No. of floors2 Basement+G+9+ Roof

DUTIES AND RESPONSIBILITIES

-Review and approved electrical drawings.

-Executing all electrical works as per approved drawing, materials, specification and as per local authority requirements.

-Attend all electrical inspection requested by the contractor for approval.

-Review and approved method of statement for testing and commissioning of all electrical works.

-Execute all electrical system testing and commissioning.

-Prepared weekly and monthly progress report.

-Monitor contractor accomplishments.

-Review and approved billing of the contactor as per site works completion.

-Attending safety meeting and monitor safety implementation on site.

-Issued engineer instruction as per revised drawing and engineering matters,

-Check materials on site as per approved manufacturer and supplier.

-Factory visit to the approved manufacturer and witness the testing they done for the switch gear, electrical panels and generators.

-Check and generate defect list/snaglist.

-Check and approved as-built drawing.

-Review and approved operation and maintenance manual, training manuals for all electrical system.

-Attend training conducted by the contractor/supplier prior to handing over of all electrical system

-Witness and approved all electrical system testing and commissioning prior to system hand over.

Company:Vazbuilt Construction

Address:1269 Edsa Quezon CityPhilippines

Project:Marina Villas

Date:March 2005 – November 24, 2006

Position:Electrical Engineer

DUTIES AND RESPONSIBILITIES

Working with the MEP department of the Marina project. Involved in site operation and testing and commissioning of all electrical services. Supervised and monitor site progress and responsible for the following scope of works.

-Supervised installation of all electrical works for internal and external facilities.

-Supervised electrical works for the temporary facilities and provide material take off.

-Provide material requisition form for site used.

-Coordinate to other discipline to avoid complict of works.

-Coordinate to the design department for the approved drawing to be implemented on site.

Company:Leighton Contractors Asia Ltd.

Address:Brgy. Tibag Pulilan, BulacanPhilippines

Project:Manila North Tollways Project

Date:April 03, 2004 – December 07, 2005

Position:Electrical Engineer

DUTIES AND RESPONSIBILITIES

Working in the MEP department of the Manila North Tollways Project.Involved site operation, testing and commissioning of all electrical systems.Supervised and monitor site progress and responsible for the following scope of works.

-Supervised installation of all electrical works for the whole projects.

-Attending inspection together with the consultant for approval.

-Responsible for material take off for site used.

-Supervised and monitor subcontractor activities and giving instruction.

-Provide site progress report and prepare all document subjected for hand over and final inspection.

-Supervised all testing and commissioning for all electrical works.

-Supervised the rectification of puchlist/snaglist and raised inspection for the consultant approval.

-Coordinate with other decipline to avoid complict of works.

Company:Meralco Industrial Engineering Services Corporation (MIESCOR)

Address:RenaissanceTower,Pasig CityPhilippines

Date:September 12, 2003 - March 31, 2004

Position:Maintenance staff/electrician

Working in the maintenance division of the Manila Electric Corporation (MERALCO) Sta. Maria Branch and responsible for the following scope of works,

-Secondary line maintenance/fieldman.

-Meter calibration technician.

-Inspection of service entrance for metering approval.

Company:First In Colors Inc.

Address:65 Industria st.Bagumbayan, Quezon CityPhilippines

Date:December 21, 2002 – May 14, 2003

Position:Maintenance staff/electrician

Working in the Engineering and maintenance division of the First In Colors Inc. and responsible for the following scope of works,

-Preventive maintenance

-Calibration technician.

-Electrician

Company:EEI CORPORATION

Address:Sta. Maria Bauan, Batangas Philippines

Date:April to November 2002

Position:Jr. Electrical Engineer

Working in the Engineering and maintenance division of EEI Corporation and responsible for the following scope of works.

-Repair of all electrical equipments.

-Control panel and motor controls.

TRAINING & SEMINAR ATTENDED:

Pneumatic Fund transfer System

Leighton Contractors Asia Ltd.

October 2004

Enviromental and Occupational Safety &Health Awareness Seminar

Conducted by MACE international

Arif & Bintoak Consulting Architect and Engineers

July 2007

EDUCATIONAL BACKGROUND:

Post GraduateProject management

Chicago Management Training Institute

Dubai, United Arab Emirates

(30th May 2008 – 1st August 2008)

CollegeAuroraStateCollege of Technology

Zabali Campus Baler, Aurora

(1996-2002)

DegreeDiploma in Electrical Technology

June 02, 2000

Bachelor of Science in Electrical Engineering

June 07, 2002

High SchoolCalabuananNationalHigh School

Brgy. Calabuanan Baler, Aurora

(1993-1996)

ElementaryCalabuananElementary School

Brgy. Calabuanan Baler, Aurora

(1988-1993)

PERSONAL DATA:

Gender:Male

Nationality:Filipino

Date of Birth:04 December 1979

Civil Status:Single

Place of Birth:Maria Aurora, Aurora

Religion:Iglesia Ni Cristo

PRC License No:0027842

SSS No.33-8215521-4

Passport No.XX4989848

CHARACTER REFERENCES:

Toni Torehi

Project Manager

Arif & Bintoak Consulting Architect and Engineers

Cel # 0504547075

Satheesh

Resident Engineer

Arif & Bintoak Consulting Architect and Engineers

Cel. # +971504104508

Ulrich Dienstbach

Building Manager

Leighton Contractors Asia Ltd.

Cel. # +639209517761

I hereby certify that the information above are true and correct to the best of my knowledge and belief.

______

Orly R. Ducha