RayatShikshanSanstha’s

KarmaveerBhauraoPatilPolytechnic,Satara

A

Project Report

On

“______”

Presented By

“Roll No. Name of Student”

“Roll No. Name of Student”

“Roll No. Name of Student”

“Roll No. Name of Student”

Diploma in Mechanical Engineering

Guided By

Prof. ______

Mechanical Engineering Department

[2016-17]

RayatShikshanSanstha’s

KarmaveerBhauraoPatilPolytechnic,Satara

C E R T I F I C A T E

This is to certify that Mr / Miss ______has successfully completed the Project work entitled“______” in the partial fulfillment of Diploma in Mechanical EngineeringofMaharashtra State of Technical Education, Mumbai, Maharashtra State.

Prof. ______Prof. N. B. Devi Prin. B. V. Kadam Guide Head of Department Principal

Date:

Place:

ACKNOWLEDGEMENT

TABLE OF CONTENTS

1. Abstract ------1

2.

3.

4.

LIST OF TABLES

Table 1...... 13

Table 2...... 20

LIST OF FIGURES

Figure 1...... 22

Figure 2

Points Consideration ForProject Report

1)Fonts for all lettering of the report should be in Times New Roman. The font size for heading is 14 (bold) & for remaining 12.

2)Header in report after index pages (at Centre)

KarmaveerBhauraoPatil Polytechnic, Satara

3)Footer in report after index pages

Department of Mechanical Engineering 2016-17Page No.

Possible List of Required Data For The Completion Of The Project Report

1)Abstract (1 page) – Overall information about project.

2)Introduction (Max 4-5 pages) – General information related with project

3)Advantages and disadvantages / Limitations

4)Methodology- A system of methods used in a particular area of study or activity.

5)Literature Survey – Preliminary information obtained from various sources e. a. Industry, website, book, newspaper, magzine etc

6)Aim / objectives of the Project work

7)Applications of project

8)Construction and working of project

9)Material Selection of components

a) Property of material – Materials, composition, tensile strength, shear strength, hardness, Stiffness, elastic limit, machinability, weldabilityetc

b) Specification of standard part – HP, RPM, Current, Voltage, Temperature, Size, Bearing No., Screw size e. a. M10, Gear (PCD and module) etc

10)Make and buy decision

Sr. No. / Component / Make / Buy
1 / Motor / Buy
2 / Shaft / Make

11)Data collection / Design consideration/ Basic Framework

12)Design

Design of shaft, power transmission elements, lever, bearing, structure, frame, welded joints, screw joints etc.

13)Drawing (Details, Assembly and Isometric Drawing )

(All drawings should be denoted by all dimensions, tolerances, fit, surface finish symbol, part list)

14)Maintenance Procedure / remedies

15)Performance / Calculations etc (If relevant)

16)Manufacturing Process / Coating / Heat treatment

Name of machine, photo of machine, machine specification,

Various parameters like speed, feed, voltage, current, power, temperature etc

17)Tools used for inspection (Mention Range and Least count) – Photo of inspection tools

18)Fabrication

Fabrication process – Welding (gas –arc – spot etc), brazing, soldering - details of process and photo of machine

Welding machine specification like current, temperature, voltage, power etc,

Type of welding rod, composition of welding rod, filler material used.

19)Process sheet

Process Sheet is a formal document that includes a series of performance instructions and guidelines regarding a specific process or its part, and that describes the operating parameters and settings for the process to produce an associated product, service or other outcome. Process sheet identifies what to produce/implement, what process to use, and what resources to involve.

Sample Process sheet

Date:

Sr. No / Operation / Process parameter (Speed, Feed, Current, Voltage etc) / Approximate Time to Complete / Drawing Name / Drawing No. / Tolerance/ Fits /Allowance / Surface Finish / Name of Machine, Tools / Material & Size / Inspection Tools
1
2

20)Assembly

Sequence of assembly

21)Costing

Raw material cost, Purchased component cost, machine cost, labour cost, transport cost etc. (Keep bills of raw materials / purchased component)

22)Trial, testing, Results, Graph and Discussion

23)Conclusion

24)Future Scope / Modification in project

25)Bibliography/ References.

Preferably actual photographs / video clips showing progress of project work at different stages be added to project report.

Following activities related to project are required to be dealt with, during this semester

1. The Selection and preliminary work regarding Project to be done as per directives given in

PROFESSIONAL PRACTICES – V Curriculum.

2. The identified projects be executed during the semester as per the Guidance from the project

Guide by the group of students (Group size max. 4 students).

3. Maintain the project diary individually for the activities performed in the format specified

below.

Project Diary format:

Sr.No. / Date / Activity Carried out / Remarks / Signature of Guide

Note:

Project should provide viable and feasible solution to the problem identified.

Report should be of 40 to 50 pages.

Font size of project report contents be as follows:

1. Main title: 16 bold Times new roman

2. Sub titles: 14 bold Times new roman

3. Running matter: 12 Times new roman, paragraph 1.5 line spacing,

4. Margin spacing 1.5 inch from left and 1 inch from other sides.

Note: Use both side pages for printing and save paper.

1)MSBTE Project Competition Points:

  1. Choice of Technology
  2. Social Impact (Impact of project on society in terms of cost, time, energy saving, health)
  3. How the project is echo friendly
  4. Use of available local resources and materials.
  5. Working Model / Prototype/ Study type etc
  6. Aesthetics
  7. Completeness of project / Further development
  8. Ingenuity
  9. Innovativeness
  10. User friendly
  11. Functionality / working