King World Missions

PO Box 38106

Lusaka

ZAMBIA

cell: 0977884174

King World School just needs a little extra assistance to reach our goals and book concrete results for our community in this case Mutendere and Kalingalinga.We need Neighbors who can partner with us and help search for organizations that can assist in raising up funds to build on a plot that is right in the heart of our community Kalinga-Linga. We also need ideas for fund raising for our organization, so we can raise money to build the school on our plot that will take in more children.
Our plan for the future of Mutendere and Kalingalinga is to put in place a fully fledged school that will give education to the vulnerable children that have been left out in the main stream education for obvious reasons. Ideas for start up and short term support for the children at King World School, We are inspired by children’s determination to live and go to school against considerable odds. When we see them wake up each day to start their daily struggle for survival amidst heavy obstacles and uncertainty, it gives us the power and drive to intensify our efforts to network and collaborate with others to help make a difference. We would appreciate help by providing input on some alternative strategies for start-up and the ongoing support of the project. Visit our website and physically come to check on us and see the land in Mass media area where we want to put up a school.

Below is the quantifications as done by our contractor and his labor.All the pricing was gotten from well established sources that will offer receipts upon buying.

N0 / MATERIAL / UNIT/ NO / COST IN ZK / TOTAL IN ZK
1 / 150 X 50 5.0 M. ROOFING TIMBER / 80 / 45, 000 / 3,600,000
2 / 100 X 50 X 50 M. / 45 / 35, 000 / 1,575,000
3 / 200 X 50 X 5.0 M / 6 / 40, 000 / 240,000
4 / BUILDING SAND / 7 LOADS / 850,000 / 5,950,000
5 / RIVER SAND / 4 LOADS / 950,000 / 3,800,000
6 / CRASHED CONCRETE STONES / 4 LOADS / 1,000,000 / 4,000,000
7 / DPC / 9 / 65,000 / 585,000
8 / POLYTHNE SHEET / 2 / 200,000 / 400,000
9 / CONFORCE WIRE / 2 / 675,000 / 1,350,000
10 / BRICK FORCE 6” / 9 / 13,500 / 121,500
GRILL DOORS / 8 / 300,000 / 2,400,000
PAD LOCKS / 8 / 30,000 / 240,000
OBSCURE GLASS / 4 / 25,000 / 1,000,000
GLAZING PUTTY / 4 KGS / 6,500 / 26,000
N0 / MATERIAL / UNIT/ NO / COST IN ZK / TOTAL IN ZK
UNDER COAT PAINT / 10 / 95,000 / 950,000
PVA CREAM PAINT / 50 / 105,000 / 5,250,000
GLASS WHITE PAINT / 6 / 110,000 / 660.000
GLASS BLACK PAINT / 3 / 120,000 / 360,000
PINK WOOD PRIMMER PAINT / 2 / 25,000 / 50,000
FASCIA BOARDS / 20 / 50,000 / 1,000,000
AIR VENTS / 14 / 7,500 / 105,000
CONTACT CEMENT ADHESIVE 500ML / 2 / 25,000 / 50,000
½ COPPER CONNECTORS / 6 / 25,000 / 75,000
½ GATE VALUE / 8 / 30,000 / 240,000
SMALL W. H. B. / 2 / 65,000 / 130,000
ANTI POISON / 2 / 40,000 / 80,000
GRAVEL / 3 LOADS / 500,000 / 1,500,000
DOOR STOPPERS / 8 / 10,000 / 80,000
6” BLOCKS / 6000 / 3,500 / 21,000,000
DOOR FRAMES / 8 / 125,000 / 1,000,000
MUKWA DOORS / 8 / 500,000 / 4,000,000
MORTICE LOCKS / 8 / 150,000 / 1,200,000
W. C. FULL SETS / 4 / 295,000 / 1,180,000
4” PVC SEWER PIPES 1+3 / 4 / 95,000 / 380,000
1 ¼ PVC PIPE / 1 / 45,000 / 45,000
4” PVC GULLEYS / 2 / 65,000 / 130,000
4” PLAIN BEND / 4 / 32,500 / 130,000
4” PVC TEE JUNCTION WITH E 1. / 2 / 42,500 / 85,000
4” PVC BEND WITH E 1. / 2 / 37,500 / 75,000
4” PVC CONNECTOR / 25,000 / 25,000
4 PVC AIR VENT VALUESS / 2 / 25,000 / 50,000
¾ G. 1 PIPES / 6 / 110,000 / 660,000
½ G.1. PIPES / 3 / 88,500 / 265,500
¾ G. 1. NIPPLES / 10 / 3,000 / 30,000
¾ G.1. UNIONS / 6 / 4,500 / 27,000
¾ G.1. ELBOWS / 6 / 3,000 / 18,000
½ G. 1. NIPPLES / 6 / 2,500 / 15,000
½ G. 1. UNION / 6 / 2,500 / 15,000
½ G. 1. UNION / 6 / 2,500 / 15,000
½ G. 1. ELBOWS / 6 / 2,500 / 15,000
1 ¼ BOX OF WOOD SCREWS / 1 / 6,500 / 6,500
5 VC WINDOW FRAMES / 4 / 80,000 / 320,000
1 BR ROOFING SHEETS / 50 / 290,000 / 1,450,000
6” ROOFING NAILS / 65,000 / 65,000
4” WIRE NAILS / 50 KG / 9,500 / 475,000
3” WIRE NAILS / 50 KG / 9,500 / 475,000
3” WIRE NAILS / 10 KG / 9, 500 / 95,000
2” WIRE NAILS / 5 KG / 9,500 / 47,500
4” CONCREETE NAILS / 5 BOXES / 6,500 / 32,500
3” CONCRETE NAILS / 5 BOXES / 6,500 / 32,500
N0 / MATERIAL / UNIT/ NO / COST IN ZK / TOTAL IN ZK
2” CONCRETE NAILS / 3 BOXES / 6,500 / 19,500
CEMENT / 100 / 70,000 / 7,000,000
WALL FENCE / 25,000,000 / 25,000,000
SUB TOTAL / 99,891,500
LABOR / 45,000,000
PLOTE WITH OLD HOUSE / 45,000,000
SUB TOTAL / 90,000,000 / 90,000,000
GRAND TOTAL / 189,891,500
WE MAY ADD CONTIGENCY / 5% / 9,495,565 / 10,000,000
GRAND TOTAL / 199891500 / 200,000,000
IF WE ARE TO SELL THE OLD PLOT SO WE CAN BUY THE NEW ONE IN THE COMMUNITY WE CAN SELL / WE BOUGHT @ 25,000,000 / WE CAN SELL @ 60,000,000 / WE STILL HAVE A DEFFICIT OF 140,000,000

It is in the light of endeavoring to bring enlightenment and overcome illiteracy by 2% by the year 2015 that we ask for your indulgence in this project and help us raise the deficit so we can build the school for the vulnerable within our community.

Hoping to hear from you soon.

KING WORLD MISSIONS

DR. RALPH SEBENTE

DIRECTOR