A competent professional with around - 03 Years - of experienceinPower Plant Electrical & Instrumentation system on Coal Based Independent Thermal Powerplant Projects on India & Desalination Water treatment plant & BOP Projects on Abudhabi-UAE with expertise in Electrical system Erection /Testing / commissioning of the system on Behalf on EPC Basis expertise.
Graduate from Anand Institue of Higher Technology, .Affiliated to AnnaUniversity, Chennai in B. E.inElectrical & Electronics Engineering with Distinction.
Possess strong leadership qualities, managerial, communication, & interpersonal skills.
EDUCATIONAL QUALIFICATIONS
2011B.E. In Electrical & Electronics Engineering fromAnand Institue of higher Technology, District Affiliated to AnnaUniversity, Chennai. Secured 79%First class with Distinction.
2007HSC from Lakshmi Mills Higher Secondary School, Kovilpatti, TamilNaduState Board, Tamil Nadu. Secured 83%.
2005SSLC from Lakshmi Mills Higher Secondary School, Kovilpatti,TamilNaduState Board ,TamilNadu. Secured 91%.
PROFESSIONAL EXPERTISE
Thermal Powerplant - INDIA(EPC-ELECTRICAL –PROJECT EXECUTION E&C)
Responsible member in a team of Engineer’s at Testing /Inspection/ Commissioning of Entire Plant Electrical system (LV/MV/HV) and DC system as reporting to Manager-Electrical.
Documentation & Follow up for Thermal Power Plant Project License & Approval follow up with CEIG(Chief Electrical Inspector – Generation) Inspecion and Followup with IS Standards.
Erection and Commissioning of Coal Handling system including Dust extraction and Suppression system with Conveyer system.
Erection of Commissioning of all Plant LV MCC’s ,LV Motor’s, Local Panels and system commissioning.
Erection of Commissioning of LT Busduct’s and Erection and Pre-commissioning of HT Busduct’s
Exp in Handling of Installation and Pre-commissioning of Turbine –Alternator system(SIEMENS)
Erection and Ttesting & Commissioning of E&I System of Electrostatic Precipetator (95KV DC)
Erection and Commissioning of Coal Handling system including Dust extraction and Suppression system with Conveyer system.
Responsible for Testing and Inspection of the Electrical & Instrumentation system /Materilas /Performance reliability test’s.
Desalination & Deminaralization Water treatment Plant & BOP Power Plant –UAE
Resposible for E&I System Installation and commissioning as per Project Procedure’s of EPCM & Owner.
Reporting to Consultant –Construction supt& QA/QC Lead(SLII ) and Owner-Const Supt (EMAL).
Responsible for Electrical & Instrumentation Execution Brown field & Green filed & Tie-in Permit system as Per Client(EMAL) & Consultant(SLII) HSE & Project Procedure Policy’s.
Installation and Pre-commissioning of the Desalination Plant (Electrical & Instrumentation system)
Approved Receving authority for Brown filed & Green Field Permit system by (EMAL & SLII)
Submission of ITP and monitoring the stage wise work inspection with the Project specifications.
Documentation & Implementation of QA/QC Procedure’s as per PQP of EPCM.
Responsible to Technical submission for As build Project Documents.
Preparation of ITP and submission of Quality dossier upon completion of project Handover package
EMPLOYMENT PREVIEW
M/s.Gulf Spic Engineering L.L.C.
Project: :-Desalination & Demin Water treatment plant and BOP of Power Plant –Emirates Aluminam Limited(EMAL),Abudhabi.(UAE)
Consultant(EPCM) :-Snc lavalin International Incorprated (SLII)
Owner :-Emirates Aluminaim Limited(EMAL)
EPC :-Tecton Engg & Const LLC / Gulf Spic Engineering LLC
ElectricalEngineer-Projects(Installation&Commissioning) Apr-‘13 –May-14
Planning & Execution of Entire Electrical & Instrumentation system on Desalination & Deminaralization Plant at EMAL-Abudhabi-UAE
Installation and Commissioning (POV) of LV MCC,SMP & I/O Panels and Drive’s and It’s cabling.
Installation & Commissioning(POV) of Plant Instrumentation Control system (DCS – FIELD INSTR –FUNCTIONAL TEST).
Fiber optic & Profibus communication cables Iinstallation and Testing co-ordination.
Planning & monitoring the work for timely completion of the project as per project Primery schedule & Prepare micro & Catch up schedule (If required).
Responsible for Preparation and Approval for Construction MSRA (Method statement & Risk assessment) and Installation and Pre-commissioning of Electrical & Instrumentation System.
Qualified Receving Authority for EMAL & SLII for both Green field and Brownfield Permit Systems.
Execution of E&I System Installation and Tie-in Works at Brownfield with EMAL Operation approval.
Assigned responsibilities of E&I QA/QC Inspections to EPCM(SLII) and EMAL.
Executing and responsible for Tie-in and Modifications work at Brown field –Electrical & Instrumentation system
Installation of Field Instruments and Cold & Hot loop check’s of through DCS.
Prepare the ITP’S and Ensure the Inspection with Consulatant as per Project Procedure Specifications
Assigned as a - Electrical and Instrumentation Engineer/QA/QC to SLII/ EMAL.
Preparation of SEQ(Site Engineering Query) & RFC (Requset for Consession procedures) to SLII & EMAL
Final submission of Quality dossier to SLII/EMAL upon completion of the project.
Planning of regular site look ahead construction activities and co-ordinate with Engineering Dept with Consultant SLII.
Responsible for Construction completion with EPCM& EMAL for construction and Commissioning(POV).
Asst for Procurement with technical specification approval of EPCM Project specifications to Procurement our dept.
M/s.Cethar Limited - Trichy (EPC-Thermal power Projects Equipment Mfg Company)
Project:M/s.Maadurga Thermal Power Company Ltd(2x30 MW),Odisha.(EPC -IPP Thermal Power Plant)
Project:M/s Dhunseri Petro chem.& Tea Ltd (1x10 MW),West Bengal.(EPC-CPP Thermal Power Plant)
Site Engineer – Electrical - Erection & Commissioning Jun’11 - Apr-13
Erection & Testing & Commissioning of LT PCC, MCC, ESP MCC,CWS MCC,ESP,Transformer with rectifier Set panels. LASCPT, NGR panels ect
As a Electrical Engineer in Erection & Commissioning of Electrical Systems in Thermal Power plants (Boiler system,Turbine-Generator system,Aux Cooling Condenser system,Electroststic precipitator system,Water treatment plant system)On behalf of EPC execution Engineer.
Erection & Pre Commissioningof 11 / 6.6 / 415V and associated equipment HT switchgears.
Co-ordination of Testing at RELAYS (numerical – Siemens reyrole ,spirotec)& electro-mechanical-AREVA,ABB), ACB, VCB’s,CT.PT,BUSDUCTS(HT & LT).
Erection & Pre Commissioning of Transformers up to- 10 MVA (Areva,EMCO).
Commissioning of ESP (Electro static preceptor) after conducting all Applicable electrical test.
Testing of 95KV DC( Open circuit & Closed circuit Test) on Electrostatic Precipitator.
Erection and Commission of Rapper mechanism & Cetrap control panel in ESP
Installation, Testing and Commissioning of the Fuel handling System MCC, Control desk, Conveyor safety system which includes Belt Sway switches, pull cord switches, Vibratory feeder, Dust extraction/Suppression system.
Up to Automation of the Fuel Handling system through DCS.
Erection and Commissioning of LT & HT Bus ducts/Attend the FAT Test’s at Busduct mafg shop’s before delivery.
Commissioning of Soft starters drives and Commissioning of HT-PANEL(SIEMENS)
Commissioning of LT & pre-commissioning of HT drives up to 950KW
Erection and commissioning of total plant stationBattery system DC and UPS AC system.
Experience at Electrical Commissioning of TG-alternator protection system while pre-operation.
Involved in creation of single line diagrams, protection schemes for power Plants Plants.
Commissioning of MOV’s (Rotex,Auma)
Coordinating the sub-contractor From Site Mobilization to Site closing and planning the day-to-day work schedule and progress.
commissioning of total plant DCS drive trails, control checks system (YOKOGAWA) system.
Erection and commissioning of EOT –Electric Over head Train (up to 40 TON.)
Erection and commissioning of P&V System,High capacity Air screw Compressors and centrifuge compressors.
Erection and Pre-commissioning of Instrumentation system and it’s Functional Logic checks.
One of team engineer at Commissioning of DCS automation system for Power plant automation.
Commissioning of Turbine electrical-Barring gear ,soft starter.
Installation and pre-operation of of HT Busduct with protection system and Current Transformer and potential Transformer installation.
ACADEMIC PROJECTS UNDERTAKEN
Project Title: Fuel cell based Boost converter – Power electronics based Project Apr’11
An Overview:
To design the suitable boost inverter for low power fuel cell for conversion of power to usable source of AC.by using bi-directional boost converter method’s.Based IEEE paper.
TECHNICAL SKILLS
METHODS
Knowledge and experience in using of International(IEC,ANSI & NEMA)code’s and IS code’s.
Commissioning of Areva Type Numeric type P Series relay’s.
Knowledge and Experience in Installation and Commissioning of Various Electrical & Instrumentation system’s of Thermal Power plant (Boiler,coal handling system,Turbinr – Generator system,BOP,Auxilery Cooling condencer,Water treatment plant’s)
TRAINING & COMPUTER SKILLS
Basics of Primevera P6 & MS Projects
Basic’s of DCS operations
Ms.Office(Excel,Word,Powerpoint)
Undergone One month Induction Training on Planning & Estimation of Turn –Key Basis E&I Projects at -EDAC ENGINEERING LIMITED,Chennai.
Undergone Inplant Training under TNEB –Substation (110KV/11KV) reg Operation and Peroidic Maintanace.
PERSONAL DETAILS
Sex & Martial Status: Male & Single
Date of Birth:01/ 12 /1989
Passport Number:J7695030 Valid upto 2021
Languages: Tamil,English,Hindi,Telungu
Last work Industry :Desalination & Demin plant & BOP of CCPP Power plant at EMAL-UAE
Expected time to join:Immediate
Expected salary : 2500 Doller
Open for relocation :Yes
Current location : Chennai
Reference : Based upon the suggestion.
Above details are True to my Knowledge.
DINESHKUMAR V
CURRENT LOCATION:-CHENNAI