UNC Charlotte Senior DesignPage 1 of 1

Project: XxxxxxRev. AStatus Report

Author: YyyyyyDate: 2008-xx-xx

XxxxxxProject –Status Report #1 – 1/25/08

Date / Revision / Author / Comments
2008-xx-xx / A / Yyyyyy / Original Document

Table of Contents

1Overview of this Document and of the Xxxxxx Project......

2Work Completed Since the Last Report......

3Issues that Need Immediate Assistance......

4Plans for the Next 2-3 Weeks......

5Faculty Mentor Signature......

1Overview of this Documentand of the Xxxxxx Project

This document describes Status Report #1of the Xxxxxx project. The team member who is identified as the Principal Engineer is responsibleto maintain thisdocument. Include in here a brief description of the project and end-product. This can be lifted from the Capability and Requirements document.

2Work Completed Since the Last Report

In this section you will describe the progress towards implementing the design you have conceived during the first semester. Status reports outline your accomplishments related to the Requirements and Capabilities documents, updates to the timeline, shortcomings and requirements change requests if needed.

3Issues that Need Immediate Assistance

If you have encountered any problems that require the assistance of the faculty mentor, sponsor, or course instructor, include them here. This is basically your cry for help!!! Also include any changes in requirements.

4Plans for the Next 2-3 Weeks

Tell us what you intend on doing within the next two to three weeks. This should be found in your schedule (GAANT chart), although you may need to make some changes from your plan.

5Faculty Mentor Signature

Have your faculty mentor sign this document verifying that your team has consulted with him/her over the past two weeks and that they agree with the plans outlined in Part 4 of this report:

Faculty Mentor Signature:______Date:______

Print Faculty Mentor Name:______