Curriculum Vitae MADDI Toufik
Curriculum Vitae
Name : Maddi Toufik
Birth date: Nov. 15, 1967
Married, 2 Children
Nationality: Algerian
Languages: Fluent Arabic, French, and Very Good English.
Graduated: June 1993 as Petroleum Production Engineer
(Ingénieur d’Etat en productiond’hydrocarbures). INHC Boumerdès,Algeria
(Former “Hydrocarbon and Chemistery National Institute” now part of Boumerdes University, Algeria)
(5 years University diploma).
Phone: +213 – 21-497405
Mobile : + 213-771-304770
Address: 72 Rue Mohamed Belkacem, Belle Vue, El Harrach, Algiers, Algeria.
E-mail:
Job objective: Broaden experience of drilling and production.
Key points:
- Extensive experience in field production operations
- Good sense of analysis.
- Proven capability of team leading and interpersonal skills.
- Good communication skills.
- Real time decision making
Profile:
Well roundedpetroleum engineering professional. Area of experienceincluding production operations for oil/gas wells in HT/HP environment.Wide experience in well operations for exploration and development fields, drilling, stimulations, testing and work over withdifferent types of reservoirs in Algeria.
Good experience with bid tenders documents relatedto drilling operations and well tangibles procurements.
Wide experience on Coiled tubing operations including acidizing, solvents, foams, killing jobs, fishing, milling, velocity strings. Significant Hydraulic Fracturing design, and operations experience as well as acidizing and other stimulation work.
Brief Job history:
- Account Leader: Halliburton Algiers- 2009 - to date
- Operations Engineer: Petroceltic International 2006 – 2009
- Petroleum EngineerSonatrach / PED Algiers-2003-2006.
- Production engineer Sonatrach /Hassi-Messaoud field 1994-2003
Reservoir Simulation: Sonatrach in Algiers 1992-1993 using SSI Simbest.
Formal training:
- 1995 Blowout control Naftogaz. Hassi- Messaoud, Algeria. (6 days).
- 1995 Coil tubing operations Naftogaz, Hassi- Messaoud, Algeria. (5 days).
- 1996 Schlumberger StimCADE in Milan, Italy (4 days).
- 1997 Schlumberger FracCADE in Tulsa, USA (5 days).
- 1998 Matrix stimulation workshop in Hassi Messaoud, Algeria. (5 days).
- 1999 OFM (Oil Field Manager) software in Hassi-Messaoud, Algeria. (5 days).
- 2002 Well control license IWCF.(7days)
- 2003 HSE training with Halliburton in Hassi-Messaoud. (5 days)
- 2003 FormationDamageSchool with PetroSkills/OGCI in Hassi-Messaoud (5 days).
- 2003 Log applications for Stimulation Design with PetroSkills (6 days).
- 2004 Matrix acidizing school with Schlumberger / UTC in England (6 days).
- 2005 (Dec.) IWCF certificate for well intervention option CTU level 2.(7days)
- 2007 Basic Drilling Engineering with OGCI in Dubai.(10 days)
- 2007 Well test analysis with NEXT Schlumberger in Algiers.(10 days)
SOFTWARE:
- FRACPRO PT
- FracCADE, StimCADE
OFM: Oil Field Manager
- PipeSim
- Perform
- FEKETE F.A.S.T WellTest analysis; and ValiDATA
- Ms Office: Excel Word, Power Point
- NEUROSHELL: Neural network software
Paper publications:
Case History of Fracturing in Algeria: Technique Puits in Hassi-Messaoud InternationalSeminar 1997
Fracturing in Algeria performance and future: JST4:International Seminar in Algiers in 2001.
Formation Stability During Production / Sand production: WEC (Sonatrach/ Schlumberger Well Evaluation Conference) in 2007.
References:
P.A Scott: (Former Country Manager Petroceltic- Algeria)
Eloi Dolivo.: (Consultant Geologist)
John Craven: (Petroceltic CEO)
Dermot Corcoran: (Senior geophysicist)
Detailed work history
Present job: Account leader- Halliburton Algeria
In charge of Sonatrach (NOC) and some IOCs accounts.
Responsible of technical solution proposals in covering production operations and enhancement
Operations Engineer in Petroceltic International PLC in Algeria 2006 to present.
Operations Engineer for Petroceltic International in exploration phase. My main achievements and duties:
- Field Witnessing of the drilling operations of Petroceltic (two discoveries).
- DST supervision and interpretation.
- First and second Discovery report testing results (2007).
- Elaborate Bid tenders documents for 2009 drilling operations (Rig, tubulars, logging, testing, etc...)
- Elaborate the Bid Tenders documents for Petroceltic Turn Key and project management for drilling program
- Tenders evaluations and recommendations
- Elaborate Bid tender document for hydraulic fracturing
- Tenders evaluations and recommendations.
- Consultant for Medex for their Fracturing campaign 2007 on purpose to establish the block commerciality after the exploration phase (Block 226/228).
- Preparing and coordinating reports and correspondence with PCI partner Sonatrach (Algerian National Oil/gas Company).
Sonatrach/PED Algiers Main project: 2004 to 2006
Performance evaluation of horizontal wells in Hassi-Messaoud field including gas lift wells.
Production monitoring and optimization for the Hassi-Messaoud horizontal wells using OFM software
Candidateselection for horizontal wells fracturing.
Determination of causes for solids production and wellbore stability issues of the horizontal producing wells in Hassi-Messaoud. Results were published at the Algiers International Well Evaluation Conference (WEC 2007).
Production evaluation and recommendations for Hassi-Guettara Field (80,000 bbls/day).
Fracturing wells for Sonatrach Exploration Department.
Well inspection using international standard procedures with Boots & Coots for Sonatrach fields.
Participated within the team Sonatrach/Boots&Coots for production operations hand book.
Abandonment programs for oil and gas wells for TFT and Gassi-Touil fields.
Horizontal wells completion recommendations for Hassi-Messaoud field (Over 400 MSTB/Day).
Mentored new graduate engineers
Sonatrach Hassi-Messaoud 1994 To 2003 (December)
Field supervision of:
- Oil and gas field hydraulic fracturing (more than 300 fracturing jobs) e.g. Hassi-Messaoud, Ohanet, TFT, GTFT, Berkaoui, Rhoughd Nouss, El Gassi, El Agreb, HGA field, In Amenas ( Tiguentourine), Brides HT/ HP gas field,)
- Design and supervise the first three frac jobs in Algeria through 23/8”coiled tubing.
- Matrix acidizing design and execution and evaluation.
- CTU operations, including velocity strings, temporary surface lines for gas lift
- Fishing through tubing.
- Well interventions, including, foams, solvents
- Killing well jobs.
- DSTs.
- Well suspension and abandonment.
- Established fracturing best practices and procedures guide lines for Sonatrach production operation department.
- Mentored new engineers for field engineering and operations.
.
Page | 1