01.(b)EMPLOYMENT IN AGRICULTURE - SOIL CONSERVATION
Notification No. KAE 16 LMW 99 dated 14-01-04
Published in Gazette dated 09-02-04
Minimum Wages with effect from 09-02-04
Cost of Living Allowance to be paid over and above 2491 points
Cost of Living Index: 3528-2491=1037 points
Minimum wages and VDA from 01-04-2009 to 31-03-2010.
S C H E D U L E
(Variable Dearness Allowance at Rs. 35.89/- per day shall be paid along with the following rates of wages to each category of workmen)
Sl. No. / Description / Measurement / B’lore Division / Mysore Division / Belgaum Division / Gulbarga Division1 / 2 / 3 / 4 / 5 / 6 / 7
1 / EARTH WORK EXCAVATIONS / (Rates in Rupees)
1.1 / Earth work borrow pits and formation of contour or graded bund
A] Black soil 0 to 30 cm depth / 1 cmt / 28.55 / 28.55 / 28.55 / 28.55
B] Black soil 30 to 60 cm depth / 1 cmt / 31.55 / 31.55 / 31.55 / 31.55
C] Black soil 60 to 90 cm depth / 1 cmt / 32.15 / 32.15 / 32.15 / 32.15
D] in Red sandy loamy soil / 1 cmt / 31.55 / 31.55 / 31.55 / 31.55
E] in gravel mixed red soil / 1 cmt / 32.15 / 32.15 / 32.15 / 32.15
F] in literate soil / 1 cmt / 38.50 / 38.50 / 38.50 / 38.50
1.2 / Formation of small section bunds at 10 mtrs intervals based on key line 0.09 mtr section / 100 mtrs / 18.05 / 18.05 / 18.05 / 18.05
1.3 / Formation of small section bunds at 10 mtrs intervals based on key line 0.18 mtr section / 100 mtrs / 183.00 / 183.00 / 183.00 / 183.00
1.4 / Digging and formation of water ways / canals / 1 cmt / 28.55 / 28.55 / 28.55 / 28.55
1.5 / Digging and formation of divertion channel including formation of soil bank on down stream
A] ordinary soil
B] hard soil / 1 cmt
1 cmt / 33.00
39.55 / 33.00
39.55 / 33.00
39.55 / 33.00
39.55
2. / LAND LEVELING
2.1 / Digging and leveling in red soil land / 1 cmt / 25.35 / 25.35 / 25.35 / 25.35
2.2 / Digging and leveling in black soil land / 1 cmt / 24.10 / 24.10 / 24.10 / 24.10
2.3 / Digging and formation of bench terrasing in hilly and costal area [ zone 9 and 10 and western ghat area (approved regions) / 1 cmt / 34.00 / 34.00 / 34.00 / 34.00
2.4 / Zinc terracing works / 1 cmt / 22.90 / 22.90 / 22.90 / 22.90
3 / FOUNDATION WORK AS PER SPECIFICATION
NOTE: In case of formation of contour and marginal boulder bunds
3.1 / A] If soil depth is less than 15cms formation of bunds by using the available boulders in deviation points foundation upto 0.3 cms. / 1 cmt / 28.55 / 28.55 / 28.55 / 28.55
B] Boulder outlet, clean over fall outlet [0. 30 mtrs depth] / 1 cmt / 28.55 / 28.55 / 28.55 / 28.55
C] sod strip, shrub check, soded earthern check of specified foundation / 1 cmt / 30.90 / 20.90 / 30.90 / 30.90
D] vegetation nala training 0.30 mtr width 0.30 mtr depth trench
[one row of vegetative filler strip on down stream side of the nala bund] / 1cmt / 28.55 / 28.55 / 28.55 / 28.55
E] Gully Rivinement
1] Foundation 0.30 mtr depth
2] If the side slope is more than 1.3 :1, 1.5:1, in such situation to bring the slide slope to 1.3:1, 1.5:1. / 1 cmt / 28.55 / 28.55 / 28.55 / 28.55
F] 1] foundation for pitching / 1 cmt / 30.90 / 30.90 / 30.90 / 30.90
2] In the red soil if the bank slope in more than 1.3:2 than to bring the required shape. / 1 cmt / 28.55 / 28.55 / 28.55 / 28.55
3] In black soil if the bank slope is more than 1.5:1 than to bring the required shape.
3.2 / In case of formation of checks using boulder and rubble / 1 cmt / 28.55 / 28.55 / 28.55 / 28.55
3.3 / Foundation work in construction of RRS check dam, vented down, perculation tank, nala bunds, digging of outlets for nala bunds with a lead of 50 mtrs and lift upto 1.5 mtrs
A] ordinary soil / 1 cmt / 44.50 / 45.75 / 42.65 / 41.40
B] hard soil / 1 cmt / 70.50 / 73.00 / 66.80 / 64.30
C] very hard soil / soft rock / 1 cmt / 124.90 / 124.90 / 111.90 / 110.90
D] blasting in rocky soil / 1cmt / 204.65 / 215.80 / 178.10 / 196.00
3.4 / Lift charges with an initial lift of 1.5 mtrs and above “ all types of soils”
A] 0 to 1.5 mtrs / 1 cmt / 0.00 / 0.00 / 0.00 / 0.00
B] 1.5 to 3 mtrs / 1 cmt / 1.25 / 1.25 / 1.25 / 1.25
C] 3.0 to 4.5 mtrs / 1cmt / 2.45 / 2.45 / 2.45 / 2.45
D] 4.5 to 6.0 mtrs / 1 cmt / 3.70 / 3.70 / 3.70 / 3.70
3.5 / If seapage water comes additional rate of 10% for the above rates has to be included / 1 cmt / 10% / 10% / 10% / 10%
3.6 / Core wall [gorge ] foundation
A] Gorge / 1 cmt / 35.35 / 35.25 / 35.25 / 35.25
B] core trench / 1 cmt / 70.50 / 72.95 / 66.80 / 64.30
[c] digging of of impervious:- soil for core wall foundation / 1 cmt / 49.45 / 50.10 / 47.60 / 46.40
[d] formation of core wall from excavated impervious soil / 1 cmt / 6.80 / 6.80 / 6.80 / 6.80
3.7 / Formation of nala bund at o.15 mtrs layers by using soil excavated at outlet point / 1 cmt / 5.55 / 5.55 / 5.55 / 5.55
3.8 / Digging soil from borrow pit and formation of bund at 0.15 mtrs layer
A] upto 1.5 mtrs height from the nala bed / 1 cmt / 33.00 / 33.00 / 33.00 / 33.00
B] more than 1.5 mtrs height from the nala bed / 1 cmt / 48.35 / 48.35 / 48.35 / 48.35
3.9 / Watering to the soil formed at 0.15 mtr layer
A] bringing water from 1 kmtr distance / 1 cmt / 11.00 / 11.00 / 11.00 / 11.00
B] bringing water more than 1 kmtr distance / 1 cmt / 13.15. / 13.15 / 13.15 / 13.15
3.10 / Compacting bund at every 0.15 mtrs layers after watering / 1 cmt / 11.45 / 11.45 / 11.45 / 11.45
3.11 / Excavation of tanks silt and transporting to the designated place initial lead of 50 mtr and lift of 1.5mtr is included
A] dry silt / 1 cmt / 26.60 / 33.00 / 33.00 / 33.00
B] wet silt / 1 cmt / 50.60 / 59.35 / 59.35 / 59.35
C] Firming side bund by using the excavated silt / 1 cmt / 5.55 / 6.80 / 7.10 / 7.40
3.12 / Farm pond, sunken pond formation
A] All types of soils, excavating the soil, formation of pond around the pond in the required shape and digging and leveling around the pond in the required shape, etc.
1] 0 - 0.6 mtr / 48;25 / 48.25 / 63.70 / 63.70
2] o.6- 1.2 mtr / 50.10 / 50.10 / 64.30 / 64.30
3] 1.2 to 1.8 mtr / 52.00 / 52.00 / 69.50 / 69.50
4] 1.8 to 2.4 mtr / 52.00 / 52.00 / 69.50 / 69.50
5] 2.4 to 3.0 mtr / 52.80 / 52.80 / 69.50 / 69.50
6] 3.0 to 3.6 mtr. / 61.60 / 61.60 / 74.80 / 74.80
B] Leveling the nearby land by using the excavated soil from 0.0 to 1.02 mtr depth / 1 cmt / 9.90 / 9.90 / 9.90 / 9.90
C] formation of silt trap for farm pond / 1 cmt / 48.25 / 48.25 / 63.70 / 63.70
3.13 / Land reclamation work
A] Main drain [ length X 0.45 X 1.05 mtr] / 1 cmt / 37.40 / 37.40 / 37.40 / 37.40
B] Lateral drain [ length X 0.45 X 0.09 mtr] / 1 cmt / 37.40 / 37.40 / 37.40 / 37.40
4.1 / 1] Use of agave in case of shrub check, soded earthern check, filter strip on down stream side of the nala bund, nala and gully management
A] collection of suckers / Per 1000 / 660.00 / 660.00 / 660.00 / 550.00
B] transportation of suckers / cuttings
0-10 km / Per 1000 / 49.00 / 49.00 / 49.00 / 49.00
10-20 km / Per 1000 / 68.25 / 68.25 / 68.25 / 68.25
20-30 km / Per 1000 / 82.50 / 82.50 / 82.50 / 82.50
C] digging of trench of 0.30 mtrs width into 0.3 depth / 1 cmt / 30.90 / 30.90 / 30.90 / 30.90
2] planting of suckers / Per 1000 / 114.40 / 114.40 / 114.40 / 114.40
D] watering [ maximum 2 times ] based on the climate, soil type, moisture etc, watering at 2 to 3 week’s interval / Per 1000 / 211.50 / 211.50 / 211.50 / 211.50
4.2 / Use of ipomia / lakki plant or locally available shrub:- formation shrub check, soded earthern check, boulder check, rubble check , nala bund, filter strips, nala and revine management.
A] collection of cutting of 30 cms length 20mm thickness / Per 1000 / 176.00 / 176.00 / 176.00 / 176.00
B] transportation of cuttings / suckers
0-10 km / Per 1000 / 19.50 / 19.50 / 19.50 / 19.50
10-20 km / Per 1000 / 33.00 / 33.00 / 33.00 / 33.00
20-30 km [ for northern district of the state ] / Per 1000 / 48.75 / 48.75 / 48.75 / 48.75
C] 1] digging of trench of 0.3 mtrs width and 0.3 mtr. depth / 1 cmt / 30.90 / 30.90 / 30.90 / 30.90
2] planting of cuttings / Per 1000 / 110.00 / 110.00 / 110.00 / 110.00
D] watering [upto full establishments ] / Per 1000 / 197.90 / 197.90 / 197.00 / 197.00
4.3 / A] sowing of hemata, scabra etc, fodder seeds on bunds / 100 mtrs / 7.10 / 7.10 / 7.10 / 7.10
B] sowing of kemata, scabra etc, fodder seeds on strips / 1sqmt / 0.85 / 0.85 / 0.85 / 0.85
II. LOADING AND UNLOADING WORKS: (Rates in Rupees)
Sl. No. / Description / Measurement / LOADING / UNLOADINGB’lore, Gulbarga, Belgaum / Mysore / B’lore, Gulbarga, Belgaum / Mysore
1 / 2 / 3 / 4 / 5 / 6 / 7
1 / Cement, stone and other materials
A] rubble stones, boulder stones, size stones, jelly etc / 1 cub mtr / 22.50 / 19.30 / 12.05 / 10.15
B] sand / 1 cub mtr / 18.55 / * 16.10
** 17.30
***14.45 / 9.15 / * 8.05
** 8.65
*** 7.40
C] Cement / steel / 1 ton / 25.10 / 36.15 / 25.10 / 36.20
D] clay / impervious soil / 1 cub mtr / 18.55 / 16.10 / 9.15 / 8.05
E] Khus grass / 360 clumps / 23.00 / 23.00 / 23.00 / 23.00
Note: * Mysore, Chamrajnagar, Mandya,
** Hassan and Chickmaglur
*** Dhakshin Kannada, Udupi and Kodagu (Districts)
III. TRANSPORTATION OF MATERIAL BY MANUAL LABOUR (HEADLOAD):
Sl. NO. / Distance / Rubble. Boulder, Rough stone, Size stone, and jelly stone, dressed stone (1 cub mtr.) . / Clay & Sand (1 cub mtr.)(Rates in rupees) Applies to all division
1 / Above 50 mtrs upto 100 mtrs / 14.85 / 11.55
2 / Above 10mtrs upto 150 mtrs / 23.10 / 18.55
3 / Above 150 mtrs upto 200 mtrs / 31.85 / 25.50
4 / Above 200 mtrs upto 250 mtrs / 39.10 / 31.30
5 / Above 250 mtrs upto 300 mtrs / 49.20 / 39.55
NOTE: 1. All Categories of employees : 3 paise per point per day over and above 2491 points.
- The daily rates of wages and VDA of different categories of employment are computed by dividing the total monthly wage by ‘26’.
- Districts included in the respective Divisions are given below:
Bangalore Division / Mysore Division / Belgaum Division / Gulbarga Division
Bangalore Urban / Dakshina Kannada /Udupi / Bijapur / Bagalkot / Gulbarga
Banglaore Rural / Chickmagalur / Belgaum / Bidar
Kolar / Hassan / Dharwad / Raichur
Tumkur / Mandya / Gadag / Koppal
Chitradurga / Mysore / chamarajanagar / Haveri / Bellary
Shimoga / Madikeri / Uttarakannada
Davangere
Note: Paise to be rounded off either to nearest 50 paise or to a rupee.