IcyneneLimitedFoamed-in-Place InsulationSection 07 21 19

Master SpecificationPage 1

September 2011

ICYNENE GUIDE NOTE: This master specification section includes GUIDE NOTEs identified as “ICYNENE GUIDE NOTE” for information purposes and to assist the specification writer in making appropriate decisions.The ICYNENE GUIDE NOTE always immediately precedes the text to which it is referring.The section serves as a guideline only and should be edited with deletions and additions to meet specific project requirements.

ICYNENE GUIDE NOTE: This specification section follows the recommendations of the Construction Specifications Canada,Manual of Practice including MasterFormat™, SectionFormat™, and PageFormat™.Optional text is indicated by square brackets []; delete the optional text including the brackets in the final copy of the specification.Delete the ICYNENE GUIDE NOTEs in the final copy of the specification.Trade/brand names with appropriate product model numbers, styles and types are used in ICYNENE GUIDE NOTEs and in the specification text Article or Paragraph titled “Acceptable Material”.

1GENERAL

1.01SUMMARY OF WORK

.1This Section specifies foamed-in-place insulation.

1.02RELATED REQUIREMENTS

ICYNENE GUIDE NOTE: Include in this Paragraph only those sections and documents that directly affect the work of this section. If a reader of this section could reasonably expect to find a product or component specified in this section, but it is actually specified elsewhere, then the related section number(s) should be listed in the Paragraph below.Do not include Division 00 Documents or Division 01 Sections since it is assumed that all technical sections are related to all project Division 00 Documents and Division 01 Sections to some degree. Refer to other documents with caution since referencing them may cause them to be considered a legal part of the Contract. Edit the following paragraphs to suit specific project conditions.

.1Section [028101 Hazardous Materials: WHMIS MSDS].

.2Section [079200Joint Sealants].

ICYNENE GUIDE NOTE: In the following Article, include only those reference standards which appear in the finished version of the project specification.

1.03REFERENCE STANDARDS

.1ASTM International (ASTM).

.1ASTM D2842-[2006], Standard Test Method for Water Absorption of Rigid Cellular Plastics.

.2ASTM E96/E96M-[2010], Standard Test Methods for Water Vapor Transmission of Materials.

.3ASTM E2178-[2003], Standard Test Method for Air Permeance of Building Materials.

.2CanadaGreenBuilding Council (CaGBC).

.1LEED® Canada-NC [2009], LEED (Leadership in Energy and Environmental Design): Green Building Rating System Reference Package For New Construction and Major Renovations including Addendum 2007.

.3National Research Council of Canada (NRC).

.1Canadian Construction Materials Centre (CCMC) Reports.

.4Underwriter’s laboratories of Canada (ULC).

.1CAN/ULC S102-[2010], Standard Method of Test for Surface Burning Characteristics of Building Materials and Assemblies.

.2CAN/ULC S127-[2007], Standard Corner Wall Method of Test for Flammability Characteristics of Non-Melting Building Materials.

.3CAN/ULC-S705.1-[2001], Standard for Thermal Insulation – Spray

Applied Rigid Polyurethane Foam, Medium Density – Material – Specification.

.4CAN/ULC-S705.2-[2005], Standard for Thermal Insulation – Spray Applied Rigid Polyurethane Foam, Medium Density – Application.

.5CAN/ULC-S774-[2009], Standard Laboratory Guide for the Determination of Volatile Organic Compound Emissions from Polyurethane Foam

1.04ADMINISTRATIVE REQUIREMENTS

.1Co-ordination: Co-ordinate work of this Section with work of other trades for proper time and sequence to avoid construction delays.

.2Pre-Application Meeting: Convene pre-application meeting after Award of Contract and one week prior to commencing work of this Section to verify project requirements, substrate conditions and coordination with other building sub-trades, and to review manufacturer’s written application recommendations.

.1Comply with Section 013119Project Meetings and co-ordinate with other similar preapplication meetings.

.2Notify attendees 2 weeks prior to meeting and ensure meeting attendees include as minimum:

.1Owner;

.2Consultant;

.3Spray polyurethane foam insulation applicator;

.4Manufacturer’s Technical Representative;

.5Manufacturer’s third-party quality assurance provider.

.3Ensure meeting agenda includes review of methods and procedures related to medium density closed-cell spray polyurethane foam insulation application including co-ordination with related work.

.4Record meeting proceedings including corrective measures and other actions required to ensure successful completion of work and distribute to each attendee within 1 week of meeting.

ICYNENE GUIDE NOTE: Article below includes submittal of relevant data to be furnished by Contractor.

1.05ACTION AND INFORMATIONAL SUBMITTALS

.1Make submittals in accordance with Contract Conditions and Section 013300Submittal Procedures.

.2Product Data: Submit product data including manufacturer’s literature for medium density closed-cell spray polyurethane foam insulation components and accessories, indicating compliance with specified requirements and material characteristics.

.1Submit list on spray polyurethane foam insulation manufacturer’s letterhead of materials, components and accessories to be incorporated into Work.

ICYNENE GUIDE NOTE: In many projects, joint sealant, transition membrane, and one-component sealant foam are used to ensure no major gaps in the substrate need to be overcome by the spray foam insulation. It is important to see details of how this will be applied and how the spray polyurethane foam insulation is joined to the joint sealant.

.2Include details of insulation joints with sealants.

.3Include product names, types and series numbers.

.4Include contact information for Icynene and their representative for this Project.

.3Test Reports:

.1 Submit test reports showing compliance with specified performance characteristics and physical properties including thermal performance.

.4Field Reports: Submit third party inspection agency’s field reports within [10] days of agency representative’s site visit and inspection.

.5Sustainable Design (LEED).

.1LEED Submittals: In accordance with Section [013521– LEED Requirements]

.6Applicator Qualifications:

.1Submit letter on spray polyurethane foam insulation manufacturer’s letterhead verifying applicators’s license for work similar to work of this Section.

1.06CLOSEOUT SUBMITTALS

.1Operation and Maintenance Data: Supply maintenance data for [foamed-in-place insulation]for incorporation into manual specified in Section 017800Closeout Submittals.

ICYNENE GUIDE NOTE: If LEED is not a part of the project delete the following Paragraph in its entirety.

.2Sustainable Design Closeout Documentation (LEED).

.1Provide calculations on end-of-project recycling rates, salvage rates, and landfill rates for work of this Section demonstrating percentage of construction wastes which were recycled.

.2Submit verification from recycling facility showing receipt of materials.

.3Record Documentation: In accordance with Section 017800Closeout Submittals.

.1List materials used in foamed-in-place insulationwork.

.2Warranty: Submit warranty documents specified.

1.07QUALITY ASSURANCE

.1Sustainability Standards Certification (LEED).

.1LEED Canada-NC submittals: in accordance with Section 013521LEED Requirements.

ICYNENE GUIDE NOTE: Retain the following paragraph only when the area covered by the insulation exceeds 2,300 square metres.

.2Mock-up: Construct full size [3 x 3 m] mock-up of spray polyurethane foam insulation using proposed procedures, materials and quality of work where directed by Consultant [and in accordance with Section 014300Quality Assurance].

.1Include [window] [and] frame [and sill], insulation, [building corner condition,] [junction with roof system] [and] how materials interface with sealants.

.2Purpose: To judge quality of work and material application.

.3Allow Consultant [24] hours minimum prior to inspection of mock-up.

.4Do not proceed with work prior to receipt of written acceptance of mock-up by Consultant.

.5When accepted, mock-up will demonstrate minimum standard of quality required for work of this Section.

.6Approved mock-up will [not] remain part of finished work.

.3Applicator Qualifications: Verify that applicator of spray polyurethane foam insulation is currently licensed by manufacturer.

ICYNENE GUIDE NOTE: The following Article although not part of Quality Assurance, can be used to enhance the quality of materials by ensuring that they are delivered and handled properly at the work site.

1.08DELIVERY STORAGE AND HANDLING

.1Delivery and Acceptance Requirements:

.1Deliver material in accordance with Section 016100Common Product Requirements.

.2Deliver closed-cell spray polyurethane foam insulation materials and components in manufacturer’s original packaging with identification labels intact and in sizes to suit project.

.3Storage and Handling Requirements: Store materials off ground and protected from exposure to harmful weather conditions and at temperature conditions recommended by manufacturer.

.4Packaging Waste Management:

ICYNENE GUIDE NOTE: For smaller projects that do not have a separate Section for waste management and disposal, delete the following paragraph.

.1Separate and recycle waste packaging materials in accordance with Section 017419Construction Waste Management and Disposal.

.2Remove waste packaging materials from site and dispose of packaging materials at appropriate recycling facilities.

ICYNENE GUIDE NOTE: For smaller projects that do not have a Waste Management Plan, delete the option referring to a Waste management Plan.

.3Collect and separate for disposal paper and plastic material in appropriate on-site storage containers for recycling[ in accordance with Waste Management Plan].

1.09WARRANTY

.1Project Warranty: Refer to Contract Conditions for project warranty provisions.

.2Manufacturer’s warranty: Submit, for Owner’s acceptance, Icynene’s standard warranty document executed by authorized company official. Icynene’s warranty is in addition to and not intended to limit other rights Owner may have under Contract Conditions.

ICYNENE GUIDE NOTE: Co-ordinate article below with Icynene’s warranty requirements.

.3Warranty period: [1] years commencing on Date of Substantial Performance of Work.

.1Warranty: includes coverage of applied closed-cell spray polyurethane foam insulation which:

.1Fail to achieve air tight and watertight seal.

.2Exhibit loss of adhesion or cohesion.

.3Do not cure.

2PRODUCTS

2.01Manufacturer

.1Manufacturer: Icynene Inc., 6747 Campobello Road, Mississauga, Ontario,L5N 2L7, Canada, Phone: (800)758-7325, FAX: (905)-363-0102, URL:

2.02DESCRIPTION

.1Spray applied medium density closed-cell spray polyurethane foam insulation.

2.03DESIGN CRITERIA

.1Thermal Resistance: To CAN/ULC-S770, [1.94] minimum RSI at 50 mm thickness.

.2Vapour Permeability: To ASTM E96, 36 ng/Pa.s.m2 at 50 mm thickness.

.3Water Absorption % by Volume: To ASTM D2842, 0.60 %.

.4Flame Spread: To CAN/ULC S102 (S127), 230.

.5VOC’s: To CAN/ULC-S774: Pass.

ICYNENE GUIDE NOTE: In the following paragraph specify CCMC Report # 13561-L for Icynene Medium Density closed-cell spray foam insulation.

.6Canadian Construction Materials Centre (CCMC): Report # [______].

2.04MATERIALS

.1Medium density closed-cell spray polyurethane foam insulation to CAN/ULC-S705.1.

.2Acceptable Material: Icynene Inc., ICYNENE MD-C- 200™.

2.07ACCESSORIES

.1Joint Sealants: In accordance with Section [079200Joint Sealants].

.1Ensure sealants are compatible with spray polyurethane foam insulation.

2.08PRODUCT SUBSTITUTIONS

.1Substitutions: [In accordance with Section 012313-Product Substitution Procedures] [No substitutions permitted].

3EXECUTION

3.01Applicators

.1Use only Icynene licensed applicators for work of this Section.

3.02EXAMINATION

.1Verification of Conditions: Verify that conditions of substrate previously installed under other Sections or Contracts are acceptable for closed-cell spray polyurethane foam insulation application in accordance with manufacturer’s written recommendations.

.1Visually inspect substrate in presence of Consultant.

.1Ensure substrates are clean of oil or excess dust.

.2Ensure that there is no surface spalling.

.3Ensure sealants completely fill gaps in substrate and at joints and are applied in accordance with Section [079200Joint Sealants].

.2Inform Consultant of unacceptable conditions immediately upon discovery.

.3Proceed with application only after unacceptable conditions have been remedied and after receipt of written approval to proceed from Consultant.

3.03preparation

.1Remove loose or foreign matter, which might impair adhesion of materials.

.2Fill open joints and voids in concrete greater than 25 mm.

.3Ensure substrates are free of surface moisture prior to application of closed-cell spray polyurethane foam insulation .

3.04Application

.1Apply medium density, closed-cell spray polyurethane foam insulation to CAN/ULC-S705.2.

.2Site mix liquid components in accordance with manufacturer’s written recommendations.

.3Spray apply medium density closed-cell polyurethane foam insulation evenly in 15 mm to 50 mm thick increments as indicated.

.1Thickness: [15] mm minimum, [50] mm maximum.

.4Perform Work in accordance with with manufacturer’s written recommendations.

3.05FIELD QUALITY CONTROL

.1Field Inspection: Coordinate field inspection in accordance with Section [014500Quality Control].

ICYNENE GUIDE NOTE: Modify site visit requirements for smaller projects.

.2Third Party Inspection Agency: Co-ordinate third party inspection agency services with Section [01 45 00 - Quality Control].

.1Schedule site visits to review work at stages listed:

.1Twice during progress of work at 25% and 60% complete.

.2Upon completion of Work, after cleaning is carried out.

.3Report deficiencies immediately to Consultant.

.4Obtain reports within [10] days of review and submit immediately to Consultant.

.2Site Application Tolerances:

.1Thickness: ± 6 mm of thickness indicated.

ICYNENE GUIDE NOTE: Specify requirements if manufacturer’s technical representative is to provide field quality control with onsite personnel for instruction or supervision of product installation, application, erection or construction. Manufacturer’s field reports are included under PART 1, Action and Informational Submittals.

.3Manufacturer’s Services:

ICYNENE GUIDE NOTE: Use the following Paragraphs only when Icynene’s field services are provided and are required to verify the quality of the applied components. Establish the number and duration of periodic site visits required by Icynene and specify below. Consult Icynene for services required. Delete if field services are not required.

.1Co-ordinate manufacturer’s services with Section [01 45 00 - Quality Control].

.1Have manufacturer’s technical representative review work involved in handling, application and protection of closed-cell spray polyurethane foam insulation, and submit written reports in acceptable format to verify compliance of Work with Contract conditions.

.2Manufacturer’s Field Services: Provide manufacturer’s field services consisting of product use recommendations and periodic site visits for product application review in accordance with manufacturer’s written recommendations.

.1Report any inconsistencies from manufacturer’s recommendations immediately to Consultant.

.3Schedule site visits to review work at stages listed:

.1After delivery and storage of closed-cell spray polyurethane foam insulation, and when preparatory work on which Work of this Section depends is complete, but before application begins.

.2Upon completion of Work, after cleaning is carried out.

3.06CLEANING

ICYNENE GUIDE NOTE: For smaller projects that do not have a separate Division 01 Section for cleaning, delete the reference to Section 01 74 00 – Cleaning in the following two Paragraphs.

.1Progress Cleaning: Perform cleanup as work progresses [in accordance with Section 017400Cleaning and Waste Management].

.1Leave work area clean at end of each day.

.2Final Cleaning: Upon completion, remove surplus materials, rubbish, tools, and equipment [in accordance with Section 01 74 00 – Cleaning and Waste Management].

.3Waste Management:

.1Co-ordinate recycling of waste materials with 017419Construction Waste Management and Disposal.

.2Collect recyclable waste and dispose of or recycle field generated construction waste created during construction or final cleaning related to work of this Section.

.3Remove recycling containers and bins from site and dispose of materials at appropriate facility.

3.07PROTECTION

.1Protect appliedmaterials from damage during construction.

.2Repair damage to adjacent materials caused by medium density closed-cell spray polyurethane foam Insulation application.

END OF SECTION 072119 -Foamed-in-Place Insulation