State Skills Standards:
1.1 The student will demonstrate adherence to general shop and site
safety rules including but not limited to those listed in the
following performance indicators.
1.1.1 Demonstrate proper use of safety apparel at all times, including but not limited to, eye protection, hearing protection, skin protection, head protection, footwear and protection from airborne particulate matter.
1.1.2 Demonstrate the safe handling, storage and disposal of chemicals, materials and adhesives in accordance with local, state, and federal safety and environmental regulations (OSHA, EPA, HazCom, MSDS, etc.)
1.1.3 Demonstrate continuous awareness of potential hazards to self and others.
1.1.4 Demonstrate appropriate construction-related safety procedures.
1.1.5 Inspect extension cords for the presence of a functional ground connection prior to use.
1.1.6 Place and secure ladders when appropriate.
1.1.7 Demonstrate awareness of personnel and activities near the work area.
1.1.8 Report hazards found on the job site to their supervisor/teacher.
1.1.9 Explain basic first aid procedures for treating cuts, burns, and electrical shock.
1.1.10 Demonstrate proper fall-protection practices and use of safety devices at all times.
DIRECTIONS : FIND YOUR POSTED JOB FOR THE WEEK, DO THE JOB DESCRIBED, AND GET THE APPROPRIATE JOB INITIALED BY THE INSTRUCTOR TO RECEIVE 1 POINT PER LAB DAY FOR EACH INITIAL AT THE END OF THE GRADING PERIOD. **** DO NOT LOSE THIS PACKET ****
YOU WILL NEED TO HAND IT IN AT THE END OF THE GRADING PERIOD FOR POINTS TOWARDS YOUR FINAL GRADE
  1. SWEEP FLOORS

Sweep the floors completely to ensure a dust-free surface.

Fridays- Vacuum behind the radial arm saw and check the shop for built up dust.

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

______

  1. BENCH TOPS AND STOOLS

-All hand tools must go back into cabinet 9

-All lumber must be returned to the long and short racks

-Fasteners must be put back in their proper drawers-cabinet 15

-Make sure all tops are clear of all tools and materials

-Brush table tops completely and flip the stools on the corners of the tables- 4 stools per table

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

______

  1. HAND TOOLS

All hand tools must be returned to cabinet 9 in their proper places

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

______

  1. PORTABLE ELECTRIC AND PNEUMATIC TOOLS

Make sure all portable tools are back in their proper cabinets

Cabinet 7-Routers Cabinet 8–Circular saws Cabinet 10-Belt sanders

Cabinet 11-Finish sanders

Cabinet 12- Saber saws & Drills

Cabinet 13&14 Pneumatic Nailers

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

______

  1. LUMBER RACKS

Any material lying around the shop that is reusable must be place in the short rack or long racks. Any materials on top of the short rack must be sorted accordingly with its proper compartment.

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

______

  1. FINISHING ROOM

All finish materials must be tightly sealed and placed neatly on the shelves in the yellow cabinet. Any rags or towels lying on the counter or floor must be place in the red fire proof containers. All finishing room tools must be placed in the yellow cabinet on the top shelf.

Fridays- Sweep the floor in the finishing room

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

______

  1. LARGE & SMALL BANDSAWS

Brush the machine off completely.

Fridays- Open the doors of the saw and vacuum the inside

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

______

  1. TABLE SAWS

Clear the machine of all material, hand tools, etc. and put everything in its respected spot in the shop. All tools for the table saw go in or on the rolling cart under the table saw. Brush the machine completely.

Fridays- Open the bottom cabinet doors and vacuum out the inside of the saw cabinet.

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

______

  1. WOOD LATHES

Place all tools and plates in proper areas on the lathe board and brush the machine completely

Fridays- Vacuum inside of lathe cabinets

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

______

  1. SURFACER- PLANER

Brush machine completely

Fridays- Open side doors and vacuum machine

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

______

  1. SHAPER TABLES

Brush machines completely

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

______

  1. RADIAL ARM SAW

All scrap wood must be placed in the proper long or short racks. Clear the tables of any tools and brush the machine completely.

Fridays- Vacuum behind the radial arm saw

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

______

  1. JOINTER

Brush the machine completely

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

______

  1. SCROLL SAWS

All scroll saws must be put back in the storage room out of the walking path in the room

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

______

  1. DISK SANDERS

Clean the disk with the eraser and brush the machines completely

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

______

  1. DRILL PRESSES

Take out any bits or drums from the drill presses and chuck keys and place them in their proper areas in cabinet 9

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

______

  1. GLUE TABLE AND CLAMPS

All clamps must be placed back in their proper places. Glue bottles and glue scrapers must be placed in their white trays on the side of the glue table. Brush the table completely.

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

______

  1. OSCILLATING SPINDLE SANDERS

All drum sanders must be put back in the storage room out of the walking path in the room

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

______

  1. MITER BOXES - SAWS

All miter boxes must be put back in the storage room out of the walking path in the room

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

______

  1. BORING MACHINES

Brush machine off completely

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

______

  1. PANEL SAW - ROUTER

Brush machine off completely and vacuum everyday behind the panel saw

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY

______

  1. POWERMAX DRUM SANDER

Brush machine completely and open the top cover to vacuum the inside. Unplug the machine and roll in its respected spots.

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY