1PROJECT BACKGROUND

1.1Preamble:

The Government of Madhya Pradesh has launched the Integrated Urban Sanitation Programme (IUSP) in the state. The programme has been designed in consonance with the National Urban Sanitation Policy 2008 of the Ministry of Urban Development, Government of India. The goal of the programme is to achieve totally sanitized, healthy and livable cities and towns. In order to achieve the goal, the state is supporting the cities to develop city sanitation plans and emphasizing that the cities become open defecation free. In the first phase the programme is being piloted in 30 cities, where construction of about 10000 toilets has been targeted.

Successful pilot initiatives have shown that the low cost individual toilets are not only appropriate for the economically weaker sections of the society, but they also have an advantage in terms of easy and quick installations in addition to providing privacy to the users and protecting dignity of women.

1.2Proposed Project

Individual low cost household toilets/group toilets are proposed to be constructed in the town with the objective to make the town - “Open Defecation Free”.The proposed contract is for Construction of Low Cost individual Toilets at [Name of Town]]. The details* are as follows:

S.No. / Name of locality/ Slum / Number of Toilets to be built / Type
1 / a.Toilet with masonry -----(Nos)
2 / a. Toilet with masonry wall----(Nos.)

1.2.1 Basic Information about the locality/slum

Basic information about the town/ slum
S.No. / Item / Information
Name of settlement
Ward and zone number-
Location
Total number of existing households
Population(present)
Design number of households

2.1Design Requirement and Relevant Data

2.2Civil Works - Specifications

As per PWD works manual/ ULB standard specifications

2.2.1Standard Specifications

The “Standard Specifications (Civil Works)” issued by the Nagar palika parishad Hoshangabadset out the specifications that shall be followed for construction of General Works under the programme. Specifications for additional specialized items of civil works, and/or for mechanical and electrical works, shall be as set out in this Section.

3SCOPE OF WORK

Constructions of low Cost Individual House hold Toilets in the identified slums.

4BOQ as per the annexure “A”(I, II and III) are enclosed for the following type of toilet model for reference by the agency.

4.1 Type (a): brick masonry

4.1.1 Twin leach type

5Designs and Drawings

Reference drawing is attached in Annexure – B.

integrated urban sanitation programme (Draft RFP, Dated 25.03.10) 1 of 6

Section 5 - Employer’s Requirementsproposal Document – IUSP/2010

6 BANK GUARANTEES AND CERTIFICATES

6.1 Form of Performance Security

...... Bank’s Name, and Address of Issuing Branch or Office......

Beneficiary: ...... Name and Address of Employer ......

Date:…………….. Performance Guarantee No.:......

We have been informed that . . . . . name of the Agency. . . . . (hereinafter called "the Agency") has entered into Contract No...... reference number of the Contract. . . . . dated ...... with you, for the execution of ...... name of contract and brief description of Works. . . . . (hereinafter called "the Contract").

Furthermore, we understand that, according to the conditions of the Contract, a performance guarantee is required.

At the request of the Agency, we . . . . . name of the Bank. . . . . hereby irrevocably undertake to pay you any sum or sums not exceeding in total an amount of . . . . . Rs (amount in figures)...... (Rupees amount in words. . . . . ), upon receipt by us of your first demand in writing accompanied by a written statement stating that the Agency is in breach of its obligation(s) under the Contract, without your needing to prove or to show grounds for your demand or the sum specified therein.

This guarantee shall expire no later than the earlier of:

(a)______months after our receipt of:

(i) a copy of the Completion Certificate; or

(ii) a registered letter from the Agency, attaching a copy of the notice to the project manager that the Works are ready for commissioning, and stating that fourteen days have elapsed from receipt of such notice (or seven days have elapsed if the notice was a repeated notice) and the project manager has failed to issue a Completion Certificate or inform the Agency in writing of any defects or deficiencies; or

(iii) a registered letter from the Agency stating that no Completion Certificate has been issued but the Employer is making use of the Works; or

(b) the ____ day of _____, 2010.

Consequently, any demand for payment under this guarantee must be received by us at this office on or before that date.

......
Seal of Bank and Signature(s)

6.2 Form of Completion Certificate

Contract: [. . . . .insert name of contract and contract identification details. . . . . ]

Date: ......

Certificate No.: ......

To: [. . . . .insert name and address of Agency. . . . . ]

Dear Ladies and/or Gentlemen,

Pursuant to GC Clause 24 (Completion of the Works) of the General Conditions of the Contract entered into between yourselves and the Employer dated [. . . . .insert date. . . . . ], relating to the [. . . .brief description of the Works . . . .], we hereby notify you that the following part(s) of the Works was (were) complete on the date specified below, and that, in accordance with the terms of the Contract, the Employer hereby takes over the said part(s) of the Works, together with the responsibility for care and custody and the risk of loss thereof on the date mentioned below.

1.Description of the Works or part thereof: [. . . .description . . . .]

2.Date of Completion: [. . . .date . . . .]

However, you are required to complete the outstanding items listed in the attachment hereto as soon as practicable.

This letter does not relieve you of your obligation to complete the execution of the Works in accordance with the Contract nor of your obligations during the Defect Liability Period.

Very truly yours,

[. . . .Signature . . . .]

cmo

Nagar palika parishad Hoshangabad

6.3 Form of Operational Acceptance Certificate

Contract: [. . . . .insert name of contract and contract identification details. . . . . ]

Date: ......

Certificate No.: ......

To: [. . . . .insert name and address of Agency. . . . . ]

Pursuant to GC Sub-Clause 25.3 (Operational Acceptance) of the General Conditions of the Contract entered into between yourselves and the Employer dated [date], relating to the [brief description of the Works], we hereby notify you that the Functional Guarantees of the following part(s) of the Works were satisfactorily attained on the date specified below.

1.Description of the Works or part thereof: [description]

2.Date of Operational Acceptance: [date]

This letter does not relieve you of your obligation to complete the execution of the Works in accordance with the Contract nor of your obligations during the Defect Liability Period.

Very truly yours,

[. . . .Signature . . . .]

cmo

Nagar palika parishad Hoshangabad

Integrated Urban Sanitation Programme (Draft RFP, Dated 08.02.10) 1 of 6