CURRICULUM VITAE
Family (Last) Name: HamzahGiven (First) Name: Mohd Fazli
Year of Birth: 1979Nationality: Malaysian
Country: MalaysiaCity: Kuala Lumpur
Profession / Designation: Inspection Engineer
Languages: English / Malay
Contact Number:6017-7270005 (hp)
605-7677907 (home)
Educational Background.
- May ’97-Sep 2000Diploma In Science Geomatics
(Universiti Teknologi Mara)
- Jan ’01-March 2003Graduate In Bachelor Of Science Geomatics (Hons)
(Universiti Teknologi Mara)
- May 2006 PCN Training and Certification
(PCN R.I Level II)
- Oct 2006 PCN Training and Certification
(PCN W.I Level II)
Computer Literacy Auto-Cad 14 ,2000 ,2004i
Microsoft Office Window, Quick Basics, TRPS
Working Experience7 Years
CorrespondenceLot 1, Lorong Kenanga, Kg. Baru, Gelok
Address33400 Lenggong, Perak.
Training Course
- Combined sea Survival, Fire Fighting, First Aid and Huet with Emergency Breathing System (EBS)
- Niosh Petronas Safety Passport (NPSP) Safety Training for Petronas Plant [2007]
- Pressure Vessel Inspection (Maintenance Inspection, Rating Repair, and Alteration) API 510,
- Attend Course
-NDETrainingCenter, Kemaman Terengganu
Working Experience
June 2009-On going Project
PositionWelding Inspector for Aker Solution (backup project)
Project HandledAker Drilling Riser Fabrication on Choke&Kill, Booster & Main Pipe
Maersk I,II & III, (101790-9A1,2,3)Maersk Spare (100291-15MY), Transocean (100817-15M), Global Santa Fee (101791-9A)
July 2008-June 2009
PositionVendor Inspector for Velosi Sdn Bhd
(Client Rep For John Zink ) Weld Insp
Project HandledDemountable Derrick Flare System For Qatar Shell GTL. LTD
Ras Laffan.
May 2008-July 2008
PositionThird party Inspector for SGS Sdn Bhd
Welding Insp.
Project HandledPSR2 Revamp Proj. (Vessel Tech Engineering Sdn.Bhd)
Multi-Media Filter Vessel (S1, S2, S3)
Activated Carbon Filter Vessel (V1, V2, V3)
May 2008
PositionThird party Inspector for SGS Sdn Bhd
Weld Insp
Project HandledShell Houdini Ece. (Check Valve Inspection.)
(Emerson Process Management, Nilai Plant,Msia)
Jan 2008-May 2008
PositionThird party Inspector for SGS Sdn Bhd
Weld Insp/ Senior weld Insp
Project HandledDirect Reduce Iron (DRI)
(Megasteel Sdn. Bhd)
Apr 2007-Dec 2007
PositionClient Sarawak Shell Sdn. Bhd
Weld Insp/ Senior weld Insp
Job DetailsThe Provision Of Major Maintenance
Commissioninng And Construction Services.
Visited PlatformSouth Furious Jacket-B (SFJT-B)
F6 Platform (Rejuvenation)
St. Joseph Jacket-A (SJP-A)
Oct 2006-Apr 2007
PositionQc Inspector (Malaysia Marine Heavy engineering)
Project HandledAngle Topsides Project
ClientWoodside Energy LTD
Apr 2005-Sep2006
PositionQc Inspector (Malaysia Marine Heavy engineering)
Project HandledOtway Gas Project-Package 4A. Offshore Facillities
ClientTechnip Geoproduction Sdn.Bhd
Jan 2005-Mac2005
PositionQc Inspector (Malaysia Marine Heavy engineering)
Project HandledFabrication Of E11P-B Topsides
1)MSF North And South
2)Module 1 And 2
ClientSarawak Shell Bhd & Sabah Shell Petroleum Co. Ltd
Feb 2004-24 Dec 2004
PositionDimensional Surveyor (Malaysia Marine Heavy engineering)
Project HandledBunga Raya-E (CO2) Removal Platform Jacket
ClientTalisman Malaysia Ltd.
Jan 2004-13 Nov 2004
PositionDimensional Surveyor (Malaysia Marine Heavy engineering)
Project HandledEAP-EPC-1A-GN-Jacket And Piles
ClientTechnip
Sep 2003-10 Dec 2004
PositionDimensional Surveyor (Malaysia Marine Heavy engineering)
Project HandledErha E&I Building
Fabricate Module (E, P, Q, B, K, M, A, F, G)
ClientSaipem S.A
Sep 2003-23 Jan 2004
PositionDimensional Surveyor (Malaysia Marine Heavy engineering)
Project HandledErha Topsides (Module R3, C, G, F, L, N, X)
ClientSaipem S.A
Feb 2004-15 Nov 2004
PositionDimensional Surveyor (Malaysia Marine Heavy engineering)
Project HandledSouth Angsi-A & Wellhead Platform
ClientTalisman Malaysia Ltd.
July 2003-Aug 2004
PositionDimensional Surveyor (Malaysia Marine Heavy engineering)
Project HandledKizomba-B (Nigeria Platform)
ClientPride International
Oct 2003-Jun 2004
PositionDimensional Surveyor (Malaysia Marine Heavy engineering)
Project HandledUnocal Thailand SPT Turret
ClientSBM Imodco Inc
June 2003-Oct 2003
PositionDimensional Surveyor (Malaysia Marine Heavy engineering)
Project HandledMad Dog Spar Platform
ClientPride International Services Inc
Mac 2003-July 2003
PositionDimensional Surveyor (Malaysia Marine Heavy engineering)
Project HandledMISC-FPSO Production Facillities
ClientM’sia International Shipping Corp. Bhd (MISC)
Mac 2003-July 2003
PositionDimensional Surveyor (Malaysia Marine Heavy engineering)
Project HandledMISC-FPSO
ClientNKT FLEX
Mac 2003-July 2003
PositionDimensional Surveyor (Malaysia Marine Heavy engineering)
Project HandledMISC-FPSO Conversion
ClientMMHEShipBuilding Division
Mac 2003-July 2003
PositionDimensional Surveyor (Malaysia Marine Heavy engineering)
Project HandledMISC-SPT Turret Project
ClientSBM Imodco
Mac 2003-July 2003
PositionDimensional Surveyor (Malaysia Marine Heavy engineering)
Project HandledPM3 Field-FSO Turret System
ClientSingle Buoy Moorings Inc.
Jan 2003-June 2003
PositionDimensional Surveyor (Malaysia Marine Heavy engineering)
Project HandledMOAB Annexe (Topsides And Jacket)
ClientTalisman Malaysia Ltd.
Mac 2003-July 2003
PositionDimensional Surveyor (Malaysia Marine Heavy engineering)
Project HandledBunga Kertas Ship Conversion
ClientMalaysia International Shipping Corp.
Jan 2003-Apr 2003
PositionDimensional Surveyor (Malaysia Marine Heavy engineering)
Project HandledRose Sea Ship Conversion
ClientMalaysia Shipyard & Eng. Sdn. Bhd
Feb 2003-June 2003
PositionDimensional Surveyor (Malaysia Marine Heavy engineering)
Project HandledPenara And North Lukut Drilling PLatform
ClientPCSB (Petronas Carigali sdn. Bhd)
Jan 2003-June 2003
PositionDimensional Surveyor (Malaysia Marine Heavy engineering)
Project HandledHelang Topsides
ClientNippon Oil Exploration Sdn. Bhd
Jan 2003-May 2003
PositionDimensional Surveyor (Malaysia Marine Heavy engineering)
Project HandledSu Tu Den Turret
ClientSOFEC
Duties Of Dimensional Control Surveyor
-Survey for all jackets and topsides.
-Assembly liaison of drawing and acceptance standard requirements.
-Responsible for all fit-up and post weld control surveys of main structure and sub-structure.
-Preparation of reports and maintaining of records on all inspection done
daily
-Survey for load out Structure And Monitoring for barge levels.
-Witness and Review report for Main Contractor Surveyor.
-Data Captured using data Collector and Converted To Cad Drawing.
-Calculations, Documentations and reporting using AutoCAD Release 2004
Software.
-Able to run all the survey software and AutoCAD release 14 and 2000.
Duties Of QC Inspector
-Monitor, observed and record various and activities for special structure and make sure that the work falls within the WPS.
-Check the welding parameter, preheat temperature electrodes as per WPS approved.
-To check welding before, during and after and also dimensional check for ovality and i.d for the jacket.
-Checked all incoming materials and reviews all certificates as per project requirement.
-Document control and final paperwork’s (documentation).
-Coordinating with foreman,supervisor,project team,NDT team,QA/QC team and client.
-Review R.T film.
Surveying Instrument Familiar
1)Total Station Nikon DTM-420
2)Total Station Nikon NPL-350
3)Sokkia Set 610
Reference
Mr. Noorazlan Bin Pilus,
Mentor, Marketing Executive,
PUSPATRI, Johor.
E-mail –
Phone - +607-2521606
Mohd. Rastam Mokhtar,
Industrial Division Manager,
SGS (Malaysia) Sdn. Bhd.,
Tel: 03-3165 2320,
Fax: 03-3165 1816,
e-mail: