FRED M IRLANDA

2010 Hebron Circle Rockwall TX 75302

E-mail

214-395-1646

Certified Welding Inspector: 10031171

I am an expert in Pipe Fitting and Welding with over 30 years experience in Supervision and Management.

Enclosed is my resume as a first step in exploring the possibilities of employment with your firm.

Thank you for your consideration and I look forward to speaking with you at your earliest convenience.

Respectfully,

Fred M. Irlanda

FRED IRLANDA

2012 HEBRON CIRCLE ROCKWALL TX, 75032

E-MAIL

SUMMARY OF QUAILFICATION

HIGH ENERGY, SELF STARTER AND ABILITY TO LEAD. STRONG BACKGROUND IN BLUE PRINT READING AND FIELD ROUTING DESIGNED FROM P&ID ALSO HAVE STRONG BACK GROUND IN AUTO CAD. I HAVE OVER 35 YEAR OF EXPERIENCE IN CONSTRUCTION BUSINESS. INCLUDING PIPE FITTER AND WELDER BY TRADE WITH CIVIL EXPERIENCE. I HAVE BEEN A, PIPE FOREMAN,G.F. AND SUPERINTENDENT, AND HAVE MANAGED JOBSITES DEALING WITH OUTSIDE CONTRACTORS.

MY RECENT UPDATE WAS Asst; Chief INSPECTOR OF A COMPRESSOR STATION, AND AUTO CAD.

EDUCATION:

1969 TO 1972

W.W. SAMUELL HIGH

1973 TO 1974

HENDERSON JR. COLLEGE

PROFESSIONAL EXPERIENCE:

EXPERIENCE: TIG,MIG,AND STICK OFFICE SKILL:COMPUTER,EXCEL,CHANGE ORDER,ESTIMATOR,MATERIAL AND AUTO CAD

REFERENCE:

RANDY STALSBY

PROJECT MANAGER

225-247-7090

Walter Wood

I&E

409-781-3799

MIKE DEERE

PROJECT MANAGER

918-839-6169

FRED M IRLANDA

2012 HEBRON CIRCLE Rockwall TX 75302

E-mail

214-395-1646

2010: Worked as a CWI on the Tie-In Crew for a 13 Miles of 20” Pipeline across the West Virginia Mountain’s for Mustang Eng: for ETC Project.

Along with putting Station location for welds and heat number for the redline drawing, Along with making drawings of all fabrications of pipe for my location. And I wrote daily reports for all progress

2010: CWI: Testing welders for the Trans Canada Project in Kansas for 100 Miles of 24”. For the Universal Inspection Company.

2009: {UNIVERSAL ENSCO} COMPRESSOR STATION AT WISE COUNTY Asst: Chief INSPECTOR AT COMPRESSOR STATION

Oversee welding test Fabrication and civil at compressor station. Include Meeting with contractor on work schedule also responsibility for redline drawing, and daily field report.

2008: JRJ ENERGY SERVICES, LLC PLAQUEMINE LA,

UTILITY INSPECTOR – PIPE LINE Work on coating and direct drill site. Was responsibility for checking drill depth and location and write a daily report on the activity

Installation of 25 miles of 1-24’’ and 2-12’’ X70 and also one Compressor Station Natural Gas Storage

2007 JRJ ENERGY SERVICES, LLC [ARLINGTON,TX] [ AUTO CAD DRAFTSMAN] Was the Mechanical Inspector on the compressor site. And also in charge of all the redline drawing which I was doing with Auto Cad. Check all Fabrication and installment of the pipe, and also attendants meeting to discuses’ all changes that I have made from original drawing. And wrote a daily report of all contractor activity, witness all tie end and check all heat number on pipe and fitting.

2007: NPP: CONSTRUCTION [GARLAND TX], SOUR CREAM PLANT ROF TIG WELDER

Install all vat and fabrication on all pump station at plant. Was a Stainless Steel welder on this project? And also assist on fabrication and the isometric drawing.

2006: [UCI CONSTRUCTION [FERNLEY NV].

PIPE FITTER; was in charge of all fabrication for the company in the basement. Involve 36 stainless tanks. For major paint company.

SHERMAN WILLIAM PAINT CO. ROF

2005: TQ CONSTRUCTIONS [ICE CREAM PLANT BALTIMORE MA.]

Tig welder in the mechanical room for installation of freezer on all the ammonia line and fabrication pipe for all tanks and pump station.

2005: PLAIN BOLIER [LAMARS IOWA]

PIPE FITTER FORMAN SHUT DOWN: Was responsibilities for set up for detail design at plant for my company on their behalf. Which consent of change pipe design that was on the drawing so that it would work, 8’’ 500 wall Steam Line, and 1-4’’condensate line.

2005: FAGEN CONSTRUCTION [MINNESOTA] Power House

Pipe Foreman over the pipe rack, which there was pipe size from 2’’ to 24’’ this, was for a gas plant.

Drawing Isometric drawing and overseeing Fabrication at fab shop.

OBJECTIVE:

USE MY EXPERIENCE TO HELP OTHER COMPANY GROW TO THERE FULL POTENTIAL

INTERESTS:

HELP OTHER PEOPLE GROW TO THERE FULL POTENTIAL

HOBBIES:

SNOW SKING, CHESS, AND MOST ALL OUTDOORS ACTIVITIES.