ADDENDUM # 1

  1. Contact Information for Mobile Supplier to APS:

Satellite Shelters Inc., is providing both 7-Classroom Modulars for the Mrachek MS Site.

Randy Rebers, v.p. sales, is our contact person at cell 1-612-860-5583-Provided floor plans are shown on Sheet A1

  1. Reference revised Sheet S1 (04/22/14) :

Both Mobiles utilize the same foundation plan however there are differences:

·  West Modular is doug-into the hillside and uses footing detail 3 on the south, east and west. Entire footprint to be excavated and backfilled with 4 to 6 inches of Breeze Mix over a vapor barrier. Entire modular is to be surrounded by paving except for the west side which is a backfilled and repaired playfield.

·  East Modular is intended to be surrounded with and its footprint on paving surfaces. (utilities and footings to be potholed through asphalt only where needed) This will require some paving to the north to create a continuous asphalt surface. Additionally a new 2’ topping lift is required where missing under the entire new east modular footprint.

·  Please note that a continuous 6” by 18” concrete curb is required around the entire perimeters at or about grade for both Modulars.

These curbs are to be placed on fully compacted fill and should incorporate positive slope away from perimeter skirting.

  1. Please verify all private utilities with new locates prior to excavations for tie-ins to existing and or when installing new. Overburden for access ramp on the west side of the West Modular is to be temporarily stored on APS property such that it will not hinder individual modules for the assembly process. All irrigation systems will be repaired and operative when Modulars are placed.

END OF ADDENDUM # 1

Please return this e-mail indicating you received this addendum and please note so on your bid form.