Risk Assessment Tool
Hazard/Event / Frequency(0-5) / Physical Safety Impact
(0-5) / Emotional Impact
(0-5) / Economic Impact
(0-5) / Reputation Impact
(0-5) / Recovery Difficulty Impact
(0-5) / Impacts + Frequency
Subtotal / Likelihood
(1-3) / Total
Risk Score
(Impacts + Freq) x Likelihood / Comments
Tornado
Winter Storm
Drought
Flood
Temperature Extreme–Cold
Temperature Extreme–Heat
Summer Storm
Urban Fire
Rural Fire
Communicable Disease/Epidemic
HAZMATIncident-Major
HAZMAT Incident-Local
Mass Casualty Incident
Terrorism(CBRNE)
Civil Disorder and Unrest
Shooter/Violence
Vandalism
Critical Materials Shortage
Telephone Systems Failure
Electrical Systems Failure
IT Systems Failure
IT System Security Breach
Security & Alarming System Failure
Water Failure
Sanitary Sewer Systems Failure
Storm SewerSystem Failure
Building Collapse
Frequency Definition:
(0) = No record of occurrence.
(1) = Occurred once every century.
(2) = Occurred once every 50 to 99 years.
(3) = Occurred multiple times within 50+ years.
(4) = Occurred every ten years.
(5) = Occurred multiple times every ten years.
Potential Impact Definitions:
(0) NONE = No impact to facility, staff, resources, or operations.
(1) LOW (NEGLIGIBLE) = Lowest impact to facility, staff, resources, or operations; unlikely to have an adverse affect upon site normal operations (or in the area - region).
(2) MINOR = Low impact; potential to alter some operations and resource usage, possible outsource work to other sites; small affect upon site normal operations (or in the area - region).
(3) MAJOR = Noticeable impact; key operations and resource usage altered, delays to studies and reporting results; outsource work to other sites; current studies delayed, rescheduled, transferred or cancelled; visible affect upon site normal operations (or in the area - region).
(4) CRITICAL = Sizable impact; broad operational and resource alteration; outsource work to other sites; current and future studies delayed, rescheduled, transferred or cancelled; big effect upon site normal operations (or in the area – region).
(5) CATASTROPHIC = Huge impact; extensive operational and resource alteration; outsource work to other sites; current and future studies transferred or cancelled; staff telecommute, teleconference or moved to new site location; cascading affect upon site operations (or in the area - region).
Likelihood Definitions:
(1) Unlikely to occur.
(2) Somewhat likely to occur.
(3) Likely to occur.
Risk Assessment1 of 2