Curriculum Vitae
RASHID ALI ABDUL HAUE MEMON
Email:
Skype: mrrishee
Cell :+971 55 1970882
Visa:Employment Visa
Position Desired:Senior Mechanical Engineer
Driving Licence:Holding Valid UAE Driving License
………………………………………………………………………………………………………………………
Highlights / A dedicated and enthusiastic professional with a broad working knowledge in the field of Mechanical Engineering and Project Management especially in oil & gas, Onshore, offshore, High rise Building EPC projects. Solid background in management and coordination skills, possess leadership qualities and good communication skills and ability to manage, motivate and work individually as well as part of a team. Well aware and successful in cross cultural working environmentObjective:
Experienced Mechanical Engineer seeking to obtain a position within an established company that will enable me to use my analytical thinking skills to make successful decisions, solve problems, assess risk, and handle emergencies
Educational Qualification:
Bachelor of Engineering Mechanical (Four Year Degree)
Quaid E Awam University of Engineering and Science Technology Nawabshah Pakistan in October 2004.
Code and standard
Familiar with the international Industry Codes and Standards such as ARAMCO Standard, SABIC Standard, ADNOC Standard, ASHREE 2007, SMACNA, ISO 2000, NEBB, NFPA 90A, NFPA-91, NFPA-45, NFPA-72, NFPA-325, NFPA-13, NFPA-30, NFPA-5000, UMC, NEC 2002, UL-181,181A & 181B, UL-555,555C,555S, UL-900, UL-1995, NEMA-66, NEMA ICS 6, NEMA 250, ASME B31.5, ASME B31.9, ANSI MC96.1 and UL 94.
Computer Skill
- Auto cad 2004
- Micro station
- Microsoft Windows 98 / 2000 /2006 / NT / XP
- MS Office(MS-Word, MS-Excel, MS-PowerPoint)
- PC Maintenance(HardWare).
Licenses & Certification
Appreciation letter awarded on finishing of QSWP from ARAMCO & Main Contractor
Appreciation letter awarded on finishing of QOSP from ARAMCO & Main Contractor
Certify as QC Mechanical in ARAMCO Project ( SAP Number: 70008171)
H2S and Safety Service training @ Qurayyah, Manifa & Ruwais Refinery Project.
Confined Space training @ Ruwais Refinery Project
Work at Height @ Qurayyah, Manifa & Ruwais Refinery Project
Training for technical program at Pakistan Ship Yard Corporation Karachi Pakistan
Training for Management Program at Pakistan steel Mill Karachi Pakistan
Summary of work experience:
Over 11 yearsdiversified international career in the Oil, Gas,refinery, Petrochemical and high rise building at UAE & KSA. Broad based engineering, designing, Construction & Commissioning expertise, primarily in Plumbing; Fire fighting, HVAC and Instrumentation. Supports a solid capability in technical management.
Employment History:
Period:From December 2014– Till date
Company: THE BIRDS ELECTRO-MECHANICAL CONTRACTING COMPANY ABU
DHBAI UAE
Position:Commissioning Manager / Senior Project Engineer
Projects Handle : 1:SARB FIELD DEVELOPMENT PROJECT PACKAGE 4 EPC WORK-BLAST
RESISTANT LOCAL EQUIPMENT ROOM (LER) ADMA OPCO.
2:FABRICATION AND INSTALLATION A NEW RECREATION ROOM- AL HYLEH BARGE ADMA OPCO.
3:Upper Zakum (UZ) 750-Modular Building Fabrication Works–Island Surface Facilities (EPC-2)
4:18 Process Modules of ZADCO
.
Responsibilities:
Develop the effective commissioning and procurement strategies based on personalisation and self-directed support, including ensuring the use of tools and methodologies for forecasting demand, supporting development of the market and procuring services on a value for money basis
Develop a strategic framework for commissioning that fits with personalisation and self-directed support, including where appropriate joint commissioning and commissioning of integrated services.
Develop a joint commissioning approach in partnership with the client in line with Putting People First and Care Quality Commission expectations
Develop a strategic allocation of financial resources in accordance with need and demand, modernising services and identifying efficiency savings.
Provide support to developing and implementing tools and business models to ensure that the commissioning, procurement and contracting cycle works effectively and is focused on delivering appropriate, high quality services
Develop the strategic commissioning of learning and development activities, including opportunities for external providers
Lead the procurement of services through formal contracts and other appropriate arrangements.
Ensure the required standards and outcomes, including value for money, legal, regulatory and quality, are delivered within these contracts.
Ensure Performance management systems are in place to deliver continual improvement, including the development of a performance improvement plan
Develop and oversee the implementation of a data quality strategy.
Develop and oversee the implementation of a data quality strategy
Provide advice and guidance in the investigation and resolving of complaints of a serious and sensitive nature within services.
Represent the department at external or internal meetings as required
Supervision of the installation, testing and commissioning of MEP and coordination
Estimate and scope MEP trades during pre-construction.
Review Contract Documents, making suggestions/modifications as they relate to the MEP trades
Manage and lead MEP subcontractors throughout duration of the project (from Groundbreaking through Commissioning and Turnover to Owner
Review and approve material and equipment for MEP systems prior to installation
Monitor the installation and start-up of MEP systems and commissioning of project with Engineer & Owner
Coordinate activities, materials procurement and other related activities with Project Manager and Field Staff
Communicate progress and prepare appropriate reports as needed
Supervise, develop and mentor project staff, if applicable.
Lead and direct the 3-D coordination process to resolve all conflicts prior to start of installations
Take overall responsibility for the performance of all MEP trades
Supervise review and coordination of submittals and shop drawings
Period:From April, 2011– November 2014
Company: Bureau VERITAS Abu Dhabi UAE
Position:Team Leader (Third Party Inspection)
Projects : 1:RUWAIS HOUSING COMPLEX EXPANSION PHASE III
HandleCONSTRUCTION OF NEW HOSPITAL (ADNOC hospital) at Al Ruwais.
2:Shams Tower-1, Tower-2 & Podium at Al Reem Island Abu Dhabi(SOROUH Tower).
3:RUWAIS REFINARY EXPANSION (RRE-03) At RUWAIS (TAKREER Project).
4:RUWAIS REFINARY EXPANSION (RRE-06) At RUWAIS(TAKREER Project).
5:Khalidiya Residential & Commercial Tower @ Khalidiya Abu Dhabi UAE.
6:New Management & Auditorium Building @ Bu Hasa UAE(GASCO Project).
7:Gate Tower (3 to 8) at Reem Island Abu Dhabi UAE (SOROUH Tower)
8:Presidential Palace Project- Auxiliary building ( package - 04)
9:SARB-Artificial Island (North & South) Drillers Camp & Associated Utilities Package-06 ADMA OPCO.
10:RIG REFURBISHMENT CONTRACT FOR RIG NABORS 867 TO REALM-1 ACCOMODATION JACK UP BARGE (ZAKHER Marine Project).
Responsibilities:
Review the Mechanical drawings reports and specifications submitted by the Design Consultant(s) at each stage of the Design to ensure completeness, correctness, compliance with the scope of work and agreement requirements.
Carry out visualinspection, testing, commissioning and witnessing of HVAC (district Cooling system),Chiller, BMS system, Pumping station, Fire Fighting, Plumbing & sewage installation with comply with project drawings, specification and international standard.
Carry out Installation, testing and commissioning of critical equipment’s related to Fire & Gas detection system, control system, district cooling system, pump station, irrigation network, Plumbing, drainage system, Fixed fire extinguishing Sprinkler system and put the findings for any deviation.
Carry out visual inspection of swimming pool including Jacuzzi Pump, Ozone system, storage tank, filtration unit , RO Plant & irrigation network.
Witnesses all testing, pre-commissioning, commissioning, and start-up activities to assure contractors compliance with the approved plans and procedures
Witness pressure and vacuum test of AHU, FAHU, Chillers & Pumps according to project specification and international standard.
Inspection & witness of all temporary equipment from Vendor / Suppliers prior to shipment.
Witnessed the visual inspection of materials in compliance with the approved PMC Material Approval Request (MAR) & delivery notes.
Witnessed the visual inspection of roof rain water downspout pipes, condensate drainage, drainage/sewer pipe lines and vent pipe line installation.
Witnessed the visual inspection of supports, alignments, slopes, elevations, surveys & coordinate points.
Review the OTP (Operation and test procedure), TCP (Turn over commissioning package) and dynamic functional test procedureand witness the testingtoverifythe testing methodology
Reviewing MRB (Manufacture record book),manufacture data sheets, certificate of conformity, bill of material and certificates of compliances, material test record sheets and calibration certificates, hazardous equipment compliance certification documents (ATEX certification), EC-type conformity certificate/declaration of critical equipments with reference to hazard area classification for procurement verification
Review the documents for installation & commissioning examination reports and performance, pre commissioning and final commissioning of MEP activities including district cooling system, pump station, irrigation network, as per project drawing, specification and international standard.
Attend regular Verification / Audit meetings with Asset owner department heads to ascertain problem areas.
Conduct a progress reporting and communicate accurately and in a timely fashion the projects progress and performance (time, money, quality ...etc)
Reviews contractor’s invoices for correctness of installed quantities for the mechanical portion of the permanent works.
Leading construction management teams to ensure smooth completion of all inter discipline activities.
Providing technical information and assistance to project and site staff
Advises Projects Manager and MEP Coordinator on any anticipated problems
Monitoring sub-contractors’ work activities and ensuring quality and progress
Supervision, Coordination and monitoring project and site staff regarding external services works like Surface Water Lines, Sewerage and Drainage Lines, Water Supply, Fire Fighting Lines, Electrical Trenches and manholes and Road Works activities on site.
Giving input to QS for any contract changes and variations
Coordinating technical sessions and meetings with Client, Consultant
Monitoring and ensuring implementation of HSE and Quality assurance plan in liaison with project specifications
Attends a bi-weekly meeting between the Construction team and the Contractor.
Period:From Dec. 2004 to Jan. 2011
Company: Al Muhaidib Contracting Company Dammam KSA.
Position:Senior Project Engineer (Mechanical)
Projects : 1:Manifa Hydro Carbon Facility at Manifa Saudi Arabia. (Saudi
HandleARAMCO Onshore Project).
2: Qurrayah Sea Water Injection Plant (Saudi ARAMCO Onshore
Project).
3: Operation Support Building at Qurrayah Sea Water Injection Plant
(Saudi ARAMCO Onshore Project).
4:King Abdul Aziz University (KAAU) Jeddah KSA.
Responsibilities:
Pre commissioning of Air Handling Unit, Air condensing Unit, Split type unit and Package air conditioning unit ( Zaamil, SKM, PETRA Model)
Pre commission of Venture Valve ( Phonics Control) connected to lab control
Pre commissioning of Variable frequency drive ( VFD) connected to Lab Control
Pre commissioning of VAV System
Pre commissioning of Snorkels connected to Lab Control
Pre commissioning of Pressurization units.
Functional test of DDC Panel ( SAUTER / SIEMENS Model )
Functional test of Fire Damper
Functional Test of Fire alarm with DDC Panel
Designing of HVAC work of following
► Substations including GIS, Electrical, Communication, UPS, Battery and mechanical room.
► Non Process building including laboratory, CCR, Grinder building and mosque.
► Car Park Ventilation
► Air & Water cooled central Plants.
► Staircase Pressurization.
► Energy & control strategy.
► Variable air volumes (VAV) & Venturi Valve air units.
Installation of A/C Equipment, Vibration isolators, Power connection to A/C units from disconnect switches, Control and control wiring, Drain connections, Refrigerant piping with fittings, accessories ,Hanger, supports, insulation and metal cladding for exposed areas.
Installation of DDC control system including local control Panel, conduiting, control wiring and field mounted accessories
Installation of Blast Protection Valves.
Installation, commissioning, Operation, Maintenance, repair and General Overhauling of the following HVAC equipments
►320TR capacity absorption chillers each 110 TR by YORK (USA)
►120TR capacity of reciprocating chillers each 60TR By Gold Star.
►15TR Capacity Air Cooled Package Unit.
►Cooling Tower Bottle Type (SPACO).
Installation of all Exhaust Fans, Bleed fans, centrifugal Fans,
Installation of Water & Sewer Pipeline Placement, Fire Fighting (RTR, UPVC and GI)
Installation of transfer pumps, Booster pumps, water tanks etc.
Prepare hydrostatic pressure testing procedure and test plan
Preparation of hydro test diagram and implement Hydro testing procedure
Inspect all joints of piping under Hydro test and complete Hydro test checklist
Maintain log for calibration of pressure gauges / relief Valve.
Ensure flushing / Disinfection of piping and submit test result of samples to the client
Check alignments / level of piping
Inspect installation of fire Hydrants, Irrigation , Main / Branch piping works
Organize Test Records and Certificate and pass it on to theclient
Prepare internal Non Conformance report (NCR) and close out on discrepancies
Evaluate the Mechanical drawings(Plumbing & HVAC) for tendering and execution
Supervise a complete team for plumping & Drainage Project
Interaction with consultant for technical support.
Technical evaluation of indents.
Preparation of document distribution matrix and ensure stakeholders acknowledge their respective requirements in line with project requirements
Preparation all handover/SAT documents for A/C units, DDC Panel, VFD, VAV, Snorkels.
Trouble shooting of A/C Equipments, DDC Panel, VFD, VAV, Snorkels.
Project Planning (Preparation of MEP program of works)
Co ordinate with Client for all matters related to the Project.
Site management.
Manage to interface with service provider’s engineers on daily basis of effective program for the Mechanical devices
Draft RFP for the contractors needed be assigned for the facility and maintenance and any other projects requested by client.
Review various budget reports in concern to facilities management.
Design & Preparation of shop drawings & as built drawing for submittal & approval
Dealing with engineering drawing with CAD Packages
Preparing material submittals for approval.
Plan and forecast daily work and prepare daily schedule
Plan and forecast weekly schedule.
Forecast next week’s activity and follow up material requirement in advance.
Prepares progress reports, scheduling of priorities to achieve target progress
Preparation of hydraulic & thermal design calculation.
Develop the contractual requirements relating to cost control & estimation, invoicing of payment & variations to be stipulated in the Agreements and incorporate them into the tender documents/Agreements.
Evaluate the technical bids to ascertain compliance to the specified requirements and provide clarifications to bidders for the same.
Evaluate Variations Requests / Claims by Contractors and to make in-depth analysis of all cost related submittals from consultants and prepare counter estimates taking into consideration contractual schedule of unit rates for variations and make appropriate recommendations to Management for approval.
Monitor the reported costs and determine the areas of concern impacting the Agreement price and budget of the projects/studies, advise concerned Senior Engineers on the proposed corrective actions to be taken in order to mitigate its impact on the project budget.
Prepare cost estimates and budgets for new projects/studies and develop submittals for management approvals. To meet the corporate reporting requirements as per the stipulated time schedules.
Coordinate cost estimation functions with various Consultants and Contractors for various projects/studies
Prepare Monthly Cost Status Reports and periodic cost information reports to Management.
Assist in the preparation of Annual Capital and Operating budgets and their updates
Prepare cost estimates and budgets for new projects/studies and develop submittals for Management approval.
Coordinates work assignments among: Vendors, Contractors, and specialist third party contractor and reviewing price quotes for the procurement of parts and services.
Required Knowledge and Skills
Participate in commercial negotiations with the Contractors.
Prepare Release Orders (RO) for the payment of the invoices related to all TS Division projects/studies.
Check/verify the all invoices related to Projects/studies and monitors Budget availability, Contract validity and Agreement Terms & Conditions against the invoice. Discrepancies to be highlighted to the concerned Department or Finance Division for their follow up action.
Pre-delivery inspection of materials
Maintaining quality measures of materials and installation.
Conducting M.E.P coordination meetings.
Coordinate the different phases of the project with the civil works
Coordination with Sub/Main contractors
Meeting project deadlines
Monitoring and reporting the progress to the Project Manager.
Co-ordinate/prepare, implement and manage any required project related engineering method statements.
Preparation of project related materials requisitions
Assist in the preparation, submission and monitoring and control of additional work requests and change orders
Prepare, submit, monitor and control project technical queries
Co-ordinate technical issues related to engineering design between customer and the project
Provide technical assistance to subcontractors and solve problems encounter at worksites.
Analyzes problems and determines work to be performed
Be aware of cost/schedule opportunities and to liaise with the project manager on possible potential areas of risk or reward
Estimate the Projects for Bidding
Reviews inventory and initiates purchase requests as appropriate
Drawing demonstration on site to the executers
Planning for the goals and work force on daily, weekly and on monthly basis.
Contributes input to decisions on HVAC and plumbing equipment design and installation
Establishes priorities based on workload and available manpower
Site HVAC and Plumbing activities involving water supply and drainage piping
Material ordering for the works according to the approved drawing.
Monitor materials usage to ensure possible shortages are identified and addressed at the earliest possible opportunity.
Ensures that equipment installation and construction meet contract specifications
Provides input on HVAC and plumbing budgets for operation, contracts and capital equipment