ITB #NS17-061 - Honors College Food Service Equipment

/ ITB Section / ITB Page / Question / Response /
1 / Bid Schedule #2A / What size shelving? / See Appendix A, https://www.dropbox.com/sh/klbbzx1uq9pladn/AAAeOHp5nPb24Mey0zHQtvhqa?dl=0
2 / Bid Schedule #3A / What size shelving? / See Appendix A, https://www.dropbox.com/sh/klbbzx1uq9pladn/AAAeOHp5nPb24Mey0zHQtvhqa?dl=0
3 / Bid Schedule #18B / Verification needed on number provided, 831925FI. We show 980207FI. / 831925-FI is correct per True Accessories document found on https://www.truemfg.com/USA-Foodservice/Accessories, page 8 of 18.
4 / Bid Schedule #27A / Bin requested but size not specified, could you provide # or size preferred? Will you want leg package as well? / These machines are mounted on top of coke fountain machines, no bin is needed.
5 / Bid Schedule
#28 / Are you just specifically requesting an alternate? / This item is being requested as an optional add item at the discretion of the University upon bid award.
6 / Bid Schedule
#29 / Are you just specifically requesting an alternate? / This item is being requested as an optional add item at the discretion of the University upon bid award.
7 / Bid Schedule
#30B / Verification needed on number provided, 831925FI. We show 980207FI. / 831925-FI is correct per True Accessories document found on https://www.truemfg.com/USA-Foodservice/Accessories, page 8 of 18.
8 / Bid Schedule #40B / Verification needed on number provided, 831925FI. We show 980207FI. / 831925-FI is correct per True Accessories document found on https://www.truemfg.com/USA-Foodservice/Accessories, page 8 of 18.
9 / Bid Schedule #42B / Verification needed on number provided, 831925FI. We show 980207FI. / 831925-FI is correct per True Accessories document found on https://www.truemfg.com/USA-Foodservice/Accessories, page 8 of 18.
10 / Bid Schedule #11 / Verification needed on whether 2 double stack units are being requested, as in 4 ovens? / These are double stack ovens, each stack will contain 2 ovens, so a total of 4 ovens.
11 / Bid Schedule #19 / Verification needed on whether 1 double stack unit is being requested, as in 2 ovens? / These are double stack ovens, each stack will contain 2 ovens, so a total of 2 ovens.
12 / 7 & 9.1.4 & 9.1.5 / 11, 12 / Don’t see questions that need answered on Attachment 5, Bid Schedule? Clarification on Submission requirement? / Questions are on Attachment 4, “Vendor Questions to Answer and Return With Bid.”
13 / General / Are we only bidding and responsible for what’s on Attach 5, bid schedule? Food service plans shows more equipment than what’s listed on schedule. i.e. walk-ins, sinks, stainless, furniture, etc. / Yes, only bid on what’s listed in Attachment 5, Bid Schedule. Items such as walk-ins, sinks, fabricated items, furniture are not included in this bid.
14 / Bid Schedule #8 / Need plans for shelf measurement / See Appendix A, https://www.dropbox.com/sh/klbbzx1uq9pladn/AAAeOHp5nPb24Mey0zHQtvhqa?dl=0
15 / Bid Schedule #11A / Spec’s are different from original spec’s. On one of the units it calls out left door hinge in original spec that is not on this spec. / Bid per specification Cut Sheets, Appendix B provided for each piece of equipment.
16 / Bid Schedule #15A / Has accessories that are not included in excel spec’s. / Bid per specification Cut Sheets, Appendix B provided for each piece of equipment.
17 / Bid Schedule #19A / Spec’s are different from original plans. / Bid per specification Cut Sheets, Appendix B provided for each piece of equipment; appears that Hat Shield was added and is not called for on specification sheet.
18 / General / I am concerned about the spec’s. Is there a more detailed spec? As you can see I don’t have a set of plans and need measurements to shelves, dunnage racks, etc. / See Appendix A, https://www.dropbox.com/sh/klbbzx1uq9pladn/AAAeOHp5nPb24Mey0zHQtvhqa?dl=0