ST. LOUIS, MISSOURI
REV
WASTE HEAT RECOVERY UNIT SPECIFICATION SHEET
1 / Customer / Job No.2 / Address / Reference No.
3 / Proposal No.
4 / Service / Item / Rev.
5 / Type / Gas Flow Orientation: Vert., Horiz., 90 Turn
6 / Sq. ft. Surf/Unit / Coils/Unit / ( par. ser. ), Sq. ft. Surf/Coils
7 / No. of Units Required
8 / PERFORMANCE OF UNIT
9 / Fluid Allocation / Shell Side / Tube Side
10 / Fluid Name
11 / Fluid Quantity, Total Lb/Hr
12 / Vapor (In/Out)
13 / Liquid
14 / Steam
15 / Water
16 / Noncondensable
17 / Temperature (In/Out) F
18 / Specific Gravity
19 / Viscosity, Liquid Cp
20 / Molecular Weight, Vapor
21 / Molecular Weight, Noncondensable
22 / Specific Heat Btu/Lb F
23 / Thermal Conductivity Btu Ft/Hr Sq Ft F
24 / Latent Heat Btu/Lb @ F
25 / Inlet Pressure Psig
26 / Velocity Ft/S
27 / Pressure Drop, Allow./Calc. Psi / "H2O / "H2O / PSI / PSI
28 / Fouling Resistance (Min.)
29 / Heat Exchanged / Btu/Hr. MTD (Corrected) / F
30 / Transfer Rate, Service / Clean / Btu/Hr Sq Ft F
31 / CONSTRUCTION OF ONE SHELL / Sketch (Bundle/Nozzle Orientation)
32 / Shell Side / Tube Side
33 / Design/Test Pressure Psig / ATM / NONE
34 / Design Temperature F
35 / Flow Arrangement
36 / Corrosion Allowance In.
37 / Connections / In
38 / Size & / Out
39 / Rating / Manhole
40 / Tube / No. / O.D. / I.D. / Sch. / Fin, Length / Pitch /
41 / Fin. / no/in. / height / thickness / Seg.
42 / No. tubes/row / No. of Rows
43 / Tubesheet / No. / Thickness
44 / Shell Casing: / Inner / BWG / Outer / BWG
45 / Insulation: / Thickness
46 / Structure Support:
47 / Steam Drum/Tube Header / Top/In / Bot/Out / Sch.
48 / Method attaching nozzle to header · coupling · welding
49 / Code: / Tube side: / ASME / Sect.
50 / Remarks:
51
52
53
54
55
56
57