A 1% State Assessment Fee shall be added to all Permits

(1) Contractor Registration / $125
(2) New Construction & Fire Restoration
(a) Base Fee / $200
(b) Plus a fee per 100 sq.ft. or fraction thereof / $6
(c) Attached or detached Garage / $50
(d) AccessoryBuilding / $25
(3) Additions, Alterations, Repairs
(a) Base Fee / $60
(b) Plus a fee per 100 sq.ft. or fraction thereof / $5
(c) When no additional floor area is involved:
(1) Base Fee / $50
(2) Plus a fee per 100 sq.ft. or fraction thereof / $5
(4) Demolition of Single, Two & Three Family Dwellings
(a) Base Fee per unit / $75
(b) AccessoryBuilding / $25
(5) Moving Structures Single, Two & Three Family
(a) Base Fee / $300
(b) AccessoryBuilding / $50
(6) Concrete / Asphalt
(a) New or Replacement
(1) Drive and Apron / $40
(2) Patio, Sidewalk, Apron Only / $20
(7) Miscellaneous Permits
(a) Chimney / $30
(b) Chimney Fireplace / $40
(c) Covered Patio / $30
(d) Deck / $30
(e) Fence / $30
(f) Garage / $50
(g) Gazebo / $30
(h) Miscellaneous Repair / $30
(i) Porch / $30
(j) Re-Roof / $30
(k) Satellite dish / Antennas / $25
(l) Siding / $30
(m) Storage Shed / $25
(n) Swimming Pool / $30
(o) Window / Door / $30
(p) Handicap Ramp / $0
(q) Re-Occupancy Inspection Single Family Dwelling / $50
(r) Re-Occupancy Inspection Condo/Townhouse / $25
(8) Plan Review / $40
(9) Re-Inspection (Building / Mechanical Systems) / $25
When an inspection is requested and made, and this work is incomplete or not in code compliance, a fee shall be charged for re-inspection
(10) Change in plans / 50% of Orig. Permit
Major revisions submitted after building permits have been issued shall result in a fee
(11) Beginning work without a permit / Double Fee

ELECTRICAL PERMITS- RESIDENTIAL:1,2,3 Family Homes & Apartments

A 1% State Assessment Fee shall be added to all Permits

(1) Contractor Registration / $125
(2) New Construction per unit / $150
(3) Fire Restoration / $85
(4) Additions, Alterations, Repairs
(a) Up tp 400 sq.ft. / $50
(b) Over 400 sq.ft. / $75
(5) Garage, Shed, Accessory building / $25
(6) Temporary / Permanent Service or Sub panel
(a) Up to 100 amps / $30
(b) 101-200 amps / $40
(c) Over 200 amps / $50
(7) GFCI outlets, Swimming Pool wiring, Hot Tubs, etc / $25
(8) For the purpose of calculating permit fees, square
footage shall be rounded off to the next highest 100
sq.ft.
(9) Re-Inspection (Building / Mechanical Systems / $25
When an inspection is requested and made, and this work is incomplete or not in code compliance, a fee shall be charged for re-inspection
(10) Beginning work without a permit / Double Fee

PLUMBING PERMITS- RESIDENTIAL:1,2,3 Family Homes & Apartments

A 1% State Assessment Fee shall be added to all Permits

(1) Contractor Registration / $125
(2) New Construction – Sewer permit & Connection
(a) Drain Tile / Pipe (0-200 feet) / $50
(b) Each additional 100 feet or fraction thereof / $20
(3) New Construction / $150
(4) Additions, Alterations, Repairs
(a) Each plumbing fixture (waste, vent) / $15
(b) Water System / $10
(c) Gas System / $10
(9) Re-Inspection / $25
When an inspection is requested and made, and this work is incomplete or not in code compliance, a fee shall be charged for re-inspection
(10) Change in plans / 50% of Orig. Permit
Major revisions submitted after building permits have been issued shall result in a fee
(11) Beginning work without a permit / Double Fee

HVAC & REFRIDGERATION PERMITS - RESIDENTIAL:1,2,3 Family Homes & Apartments

A 1% State Assessment Fee shall be added to all Permits

(1) Contractor Registration / $125
(2) New Construction
(a) Central Heating System, Each / $100
(b) Air Conditioning System, Each / $50
(c) Supplemental System, Each / $40
(3) Additions, Alterations, Repairs
(a) Central Heating System, Each / $60
(b) Air Conditioning System, Each / $25
(c) Supplemental System, Each / $25
(4) Re-Inspection / $25
When an inspection is requested and made, and this work is incomplete or not in code compliance, a fee shall be charged for re-inspection
(5) Change in plans / 50% of Orig. Permit
Major revisions submitted after building permits have been issued shall result in a fee
(6) Beginning work without a permit / Double Fee