falokun ayodele peter

Address:9803 Plowline Road, Randallstown, Baltimore MD 21133, USA. Tel:443-2047590/+2347051918455

 E-Mail:

PERSONAL PROFILE

I am a well motivated,quick to learn candidate with good communication, analytical andIT savvy skills with a

working knowledge of Systems Completions tools such as PathMaker and Zenator Completionsdatabase who likes to

work in an environment that promotes an overall technical and educational atmosphere and also encourages the spirit of

learning and motivation, which will in turn open new areas in which I can pursue achievement and success.

I presently work in the area of Completions & Handover such as Completions Database Operations/Coordination, Punch

list administration, Certification and Handover Dossier administrator.

QUALIFICATIONS

B.Scchemical engineering MAY2007

Obafemi Awolowo University,Ile- Ife,Osun State

HEALTH, SAFETY & ENVIRONMENTAL CERTIFICATE JUNE 2009

(MMC Management consulting, Lagos)

ADVANCED PATHMAKER CERTIFICATE IN SYSTEMSCOMPLETION METHODOLOGY JUNE 2010 (Falcon Global Limited, UK)

ZENATORCERTIFICATE IN SYSTEMS COMPLETION METHODOLOGY MAY 2011 (Global Falcon Limited, USA)

CAREER EXPERIENCES TO DATE

CHEVRON NIGERIA LIMITED Dec 2010 – Till date

ESCRAVOS GAS TO LIQUIDS PROJECT (EGTL PROJECT)

ESCRAVOS TERMINAL,

WARRI-DELTA STATE,

NIGERIA.

(ZENATOR SYSTEMS COMPLETION/PSSR COORDINATOR)

Customization of Chevron’sEscravos Gas toLiquids Project.

Operated and maintained 6 Sub-Projects for Chevron’s EGTL Project in readiness for turnover to Operations which

includes EGTL-Commissioning Project, EGTL-PMS Testing Project, EGTL-Loop Testing Project, EGTL Preservation

Project EGTL COT Project and EGTL-Functional Testing Project.

Coordinated the population and updates of Zenator Completions database.

Supported the Population of Zenator database on Chevron’s Olero Creek Restoration Project in 2011.

Preparedthe Systems Completion Database (SCD), loading templates with information from P&ID's, One Line

Diagrams, Cable Schedules, Piping Line List, Instrument Index, Mechanical Equipment List in a format that

can beuploaded into Zenator database.

Allocating and generating of various Mechanical, Precommissioning and Commissioning Checksheets, Preservation

Checksheets and Cover pages.

Templates creation, circulation process and execution of checksheets during different phases of the Project.

Vast knowledge of Zenator/PathMaker Check database, Report Plus, Launch, Allocator and Walkdown Capture

device.

Configured local parameters in the database which includes Tag type Matrices, Look-up tables, System

Priority, Punch list category, Main tag type and Sub tag type.

Coordinates with Falcon Global Limited remote technical support team in the United Kingdom and USA for support

on day-daysmooth running of the database and also to report bugs, outages or errors.

Data and document management of dossiers into electronic formats.

Reviewing and overseeing work package development and execution.

From detailed review of boundary limits, further develop existing and commissioning plan for commissioning

activities.

Allocated and generated inspection test records and preservations Checksheets.

Set up and maintain user groups on the System Completions database.

Assigned security privileges to User groups in the database.

Organized training for Chevron Operators and Chevron/Sasol Commissioning Superintendents.

Organizing PRSR and PSSR Walkdowns for Project Construction and Operations Team.

Overall management of Commissioning activities and Turnover of Systems Unit Groupsat RFO level to Operations.

Interface with the Engineering team when changes are required on the Completions Management Database.

Coordinated the preparation and execution of Pre Safety Start-Up Reviews and also uploaded the Punch list

generated byPSSR team into the Completions database.

Received Punch list transferred to Project Operation Team (POT) at Ready for Commissioning and uploaded into

Zenator Completions database.

Overseesthe execution of PRSRs and PSSRsPunch items in EGTL Facility

Ensured Commissioning Procedures and Turnover Completion Packages (TCP's) are developed and implemented in

accordance with Systems Completion Specification.

Supported and track Pre-commissioning activities to ensure B-Checksheets are developed, issued, completed,

signed off and properly entered with supporting documents.

Ensured that all original signed off hard copies of A- Checksheets and B-Checksheets and Commissioning

procedures arefiled into the Turnover Completion Package (TCP).

Monitor and track Commissioning activities and report completion progress.

Audit and Verify Ready for Operation (RFO) and Ready for Start-UP (RFSU) support documentation.

Issue RFO and RFSU Certificates for Transfer of Care Custody and Control (TCCC) to Operations.

Custodians of TCCC support documentation including RFC and RFO.

Issuedchecksheets, Yellow Lining and Hammer Testing to Operators for Commissioning activities.

Coordinates clearing of Punch lists and report the progress.

Provide technical support for Preservation activities to Escravos Gas to liquids Project maintenance team.

Ensure that all certificates are developed, issued in proper sequence for sign off on Completion of work activities

and also Interfacing with ready for Commissioning Coordinator, discipline leads and specialists in various fields to

ensure Compliance.

Make daily updates in regards to Systems and Subsystems changes during System Completion activities.

Generating reports from Zenator Completions database.

Attending weekly management meeting to report Commissioning progress status.

Attended Systems Completion Community of practice meetings with the PRC team in Chevron Office, Houston.

Capable of reading P&ID's and extracting information from them that is required to be inputted to the system

Completion database.

CHEVRON NIGERIA LIMITED Dec 2008 – Dec 2010

ESCRAVOS GAS PROJECT PHASE 3A (EGP3A PROJECT)

CHEVRON ESCRAVOS TERMINAL,

WARRI, DELTA STATE,

NIGERIA.

(SYSTEMS COMPLETION COMMISSIONING ENGINEER)

Interface with Engineering Team when Changes are requested to Completions Management Database (Piping &

Instrumentation Diagrams, Process Flow Diagrams, identification and location of Engineering Tagged Items).

Back-up the Power user/PathMaker Administrator.

Reviewing P&ID’s from Engineering team.

Customization of EGP3 Project.

Set up Project Checksheets (Templates) and customizing the checksheet with bar coded fonts to make it generic

in PathMaker database.

Creating of Tag Type Matrix for EGP3 Project Engineering deliverables including instrument index, cable

Schedule, mechanical equipment list, piping list and electrical equipment list.

Linking of the Project Tag Type Matrix and generic checksheets to create a unique project checksheet.

Configured local parameters in the database.

Allocating and generating of Project Preservation Checksheets.

Set up and tracking of management of change including Field Change Notice (FCN) and Non Conformance Report

(NCR).

Set up and tracking of Project Punch items including construction Punch items, Pre-commissioning Punch

items, SID Punch items, Commissioning Punch items and PSSR Items.

Set up tracking of Project ‘Exception items’ for the Project.

Generating reports and queries and extracting it into excel for onward delivery to end user.

Support Commissioning team by creating additional subsystem for existing system if need for livening-up of some

subsystems.

Coordinates with Falcon Global Limited remote technical support team in the United Kingdom.

Set up and maintain user group.

Ensure proper coordination of PathMaker database users in daily activity usage.

Make daily updates in regards to system and subsystem changes during system completion activities.

Make daily progress report to contractor (HHI) and the client (CNL) Commissioning Managers.

Assign security privileges to user group.

Track and record scanned documents using Allocator and manual attaching.

Support and track mechanical completion activities to ensure A-Checksheets are developed, issued, completed,

signed off and properly entered into the database with supporting documents.

Support and track Pre-commissioning activities to ensure B-Checksheets are developed ,issued, completed, signed

off and properly entered into the database with supporting documents.

Ensure all original signed off Hard copies of A- Checksheets and B-Checksheets and commissioning procedures are

filed into the Turnover completion package (TCP).

Ensure that all certificates are developed, issued in proper sequence for sign off on completion of work activities.

Ensure all certificates are scanned and input into the project database (PathMaker) and also ensure all original

signed certificates are placed in the system TCP.

Interfacing with ready for Commissioning Coordinator ,discipline leads and specialists in various fields to ensure

Compliance.

Updatingand monitoring project daily completions report using the certificate tracker spreadsheets.

Assist in drivingconstruction & Pre-commissioning teams to ensure checksheets are completed, signed off and

all relevant Checks/Testsare carried out.

Track and report safety in design issues.

Data and document management of dossiers into electronic formats

Operate and maintain the project database system.

Assisting in developing the Turnover Completions Package for Chevron Nigeria Limited.

Compiling and maintaining of system acceptance and handover dossiers incorporating ITRs, certificates, vendor

testing records, system punch lists for systematic readiness handover.

Tracking and collating of all System Mark-up PID and As-built drawings.

Allocate and generate inspection test records and preservations.

Monitoring discipline ITR / check sheets progress and Punch list with contractor.

Treating request for Punch list category and discipline change during the project.

Treating request for adding of Tags, Relocating of Tags, and Deleting of Tags during the project.

Updating and Maintaining the Punchlist items on the database.

Make daily updates in regard to Systems and Subsystems changes during system completion activities.

Ensuring that all Project Punchlist item categories are verified and liaise with ready for Commissioning

Coordinators & Commissioning lead to agree categories, traceability of all punchlist items generated and input

intoproject database.

Ensure that all Certificates are developed & Issued in the proper sequence for sign off on completion of work

Activities from Mechanical Completion through to System Turnoveri.e. DMCC - Discipline Mechanical Completion

Certificate, SSMCC – Sub System Mechanical Completion Certificate, SMCC - System Mechanical Completion

Certificate, DPCC - Discipline Pre-Commissioning Completions Certificate, RFCC - Ready for Commissioning

Certificate, PSTN - Partial System Turnover Notice, STN - System Turnover Notice & FTN - Final Turnover Notice.

Liaisewith Walkdown Coordinator, Ready for Commissioning Coordinator, Construction, Pre-Commissioning &

Commissioning discipline Engineers & specialists, continually tracking their progress with the Database.

NATIONAL ENGINEERING & TECHNICAL COMPANY LIMITED May 2005-May 2006 VICTORIA ISLAND,

LAGOS STATE, NIGERIA

(PROCESS ENGINEER)

Produced Schematic drawings of process deliverables (PFD and P&ID) using AutoCAD and Microstation.

Simulation of stages of compression module using hysys software

Documented Process deliverables into transmittal.

Preparation of legend sheets, line designation table & utility flow diagram.

Developing of a Safety Analysis function Evaluation chart.

Developing of hazard analysis table.

Checking deliverables and Ensuring it conforms to client Specification.

Storing of Documents in file Directories and Paper File Cabinets.

Sizing of lines and equipments.

Generation of heat and material balance.

Developing risk analysis table

Preparation of Regular ProjectProgress Reports.

NIGERIA AGIP OIL COMPANY Sep 2004-March 2005 PORT-HARCOURT,

RIVERS STATE, NIGERIA (INTERNSHIP)

Comprehensive report on Site visits to flow stations owned by the company.

Making Observation and taking measurement as well as collecting and interpreting data from technical and

Operating staff.

Ensuring stabilization of oil at the Gas plant.

Injection of chemicals at the Arrival Manifold.

Carry out in-House Project Design Reviews through the application of Relevant Software.

Monitor Field Evaluation Activities through Regular Review of Reports.

Ensuring that all aspects of operation and process meet specified regulations.

KEY ACHEIVEMENTS

Regularly commended for excellent communication, analytical and numerical skills.

Proved to be a fast learner and highly adept at working as part of a team.

Commended for efficiently managing and prioritising personal caseloads to achieve all targets.

Highly adept at collating data and producing key reports and records.

Consistently ensured efficient reporting and data management within deadlines.

Consistently handled and resolved queries and complaints in a quick and efficient manner.

Work Excellence Award (Hyundai Heavy Industries,EGP3 Onshore Project, Chevron Escravos)

Work Excellence Award & Experience Certificate Award by Chevron EGP3A Project Commissioning Manager.

CHEVRON PROJECT MANAGEMENT ACADEMY

Operational Excellence starts with me Awareness.

Introduction to Contractor HES Management Awareness.

Module 1 Chevron Project Development and Execution Process Basics Awareness.

Module 2 Applying Chevron Project Development and Execution Process to Projects Awareness.

Module 3 Applying Chevron Project Development and Execution Process Toolbox Awareness.

Safety in design Awareness.

PRC IIF Protocol Overview Awareness.

PRC Overview & On-boarding Awareness.

SKILLS AND PERSONAL DETAILS

Date ofBirth: 30/September/1981 Health: In Excellent Health Sex: Male

AutoCAD and Microstation.
Microsoft Visio.
Gas Processing/Modelling: ASPENHYSYS.
Microsoft Office Suite:Excel,Word,Power Point.
Team Work and Interpersonal Skills.
Verbal and Written Communication Skills.
Efficient, Organised & Result driven.
Highly adept at quickly learning new skills.
High level of initiative, industry & self-motivation.
Completions tracking tools database (Pathmaker & Zenator)
REFERENCES
Ufuoma Ekpruke () Gary Ladnier ()
Maintenance Superintendent EGTL Commissioning Manager
Chevron Nigeria Limited Chevron Global Technology Services Company
Escravos Terminal, Escravos Gas to Liquids Project.
Warri, Delta State. Escravos,Nigeria
08055003386 281-2161511

Kayode Odukoya () Emmanuel Ogah ()

Operations Superintendent Systems Completion & Support Manager

Chevron Nigeria Limited Chevron Global Technology Services Company

Escravos Terminal, Escravos Terminal.

Warri, Delta State. Warri, Delta State

08057006591 832-4835363

Ayodele Peter FalokunPage 1