NACP Biophysical Budget by Phase – 9/25/01 (by R.Birdsey)
NOTES:
1. Remote sensing activity not developed
2. USA portion of budget only
3. All identified funding is new, added to existing research programs
Proposed
Phase 1. Preliminary Work (2002-2003, from existing agency budgets)Activity
- Network design issuesWorkshop
- Develop alternative hierarchical designs
- Refine criteria to select intensive sites and ID major gaps
- Strategy to enhance flux network and other LTER sites
- Enhancements to extensive inventoriesFS/NRCS
- Review FIA and NRI sampling framesmeeting
- Gaps and overlaps in land coverage
- Prototype historical data base
- Measurement issues and intensives Workshop(s)
- Devise sampling strategy for soil CO2 flux
- Soil CO2 flux equipment development
- Methane inventory methods
- Variables, definitions, measurement standards
- Modeling and analysisEstablish
- Identify analysis needsConsortium
- Define input/output variables
- Model/data comparison exercises
- Remote sensing – sensor development and testing?
Annual
Phase 2. Intensive Field Studies (2004-2005, new funding needed)funding
($1000)
- Network design issues1000
- Analysis of alternate hierarchical designs
- Select network sites (old and new)
- Support initial intensives for atmospheric measurements
- Enhancements to extensive inventories4000
- Field tests – FIA/NRI reconciliation
- Statistical analysis
- Support initial intensives for atmospheric measurements
- Compilation of historical data
- Fill critical gaps with interim data*
- Measurement issues and intensives10000
- Test in situ measurements at various scales, major biomes
- Field test suite of measurements at
medium intensity sites
- Support initial intensives for atmospheric measurements
- Modeling and analysis3000
- Model/data testing and comparison studies
- Prototype reports
- Support initial intensives for atmospheric measurements
- Design data management system
- Remote sensing - prototype tests?
* Wilderness, reserves, rangelands, pinyon-juniper, urban/suburban, Alaska, etc.
Annual
Phase 3. Long-term Implementation (2006+)funding
($1000)
- Network design issues1000
- Monitor performance and recommend modifications
- Enhancements to extensive inventories6000
- Inventory developed lands ($6,000-12,000*)
- Inventory rangelands ($10,000-20,000*)
- Enhanced measurements** – all biomes
- Measurement issues and intensives10000
- Monitor performance and recommend modifications
- Establish new network of intermediate intensive sites
- Enhance/expand intensive networks
- Modeling and analysis3000
- Begin annual reporting
- Test hypotheses about causes
- Inform policy
- New operational remote sensors?
* Funds needed not necessarily sole responsibility of NACP
** Soil C stocks; enhanced mensuration; C transfers, etc.