California Forest Improvement Program

Mini Management Plan

Version 01-10-2018

State Contract Number:

CFIP Project Number:

MINI MANAGEMENT PLAN CERTIFICATION PAGE
Registered Professional Forester (RPF) Certification:
I certify that I, or my supervised designee, personally inspected this California Forest Improvement Program (CFIP) plan area, and that the plan fully complies with the CFIP and Professional Foresters Law, and meets Federal Forest Stewardship (FS) Management Plan Standards. I further certify that this plan is based upon the best available site and landowner information, and if followed, will not be detrimental to the productivity of the natural resources associated with this property.
Printed Name: / RPF:
Signature: / Date:
Organization/Company:
Mailing Address:
Phone:
E-mail:
CAL FIRE Unit Certification:
I certify that I, or my supervised designee, personally inspected this CFIP plan area, and that the plan fully complies with the CFIP and Professional Foresters Law, and meets Federal Forest Stewardship (FS) Management Plan Standards. I further certify that I have discussed this plan with the landowner and they have read and agree with the plan’s contents
Landowner initial here:
Printed Name: / RPF:
Signature: / Date:
CAL FIRE
Unit:
Mailing Address:
CAL FIRE State or Region CFIP Coordinator:
I certify that the plan fully complies with the California Forest Improvement Program and Professional Foresters Law, and meets Federal FS Management Plan Standards.
Printed Name: / RPF:
Signature: / Date:
I. / LANDOWNER
OWNER NAME:
MAILING ADDRESS:
PROPERTY LOCATION ADDRESS:
PHONE (HOME):
PHONE (BUSINESS):
E-MAIL:
II. / LOCATION
A. / COUNTY:
B. / ASSESSOR’S PARCEL #:
C. / LEGAL DESCRIPTION:
D. / GENERAL AREA LOCATION:
(Including driving instructions)
E. / QUAD MAPS ON WHICH PROPERTY IS LOCATED:
III. / FORESTLAND CONDITIONS
OWNERSHIP SIZE:
ACRES OF FORESTLAND:
A. / LAND USE HISTORY
(Pre-historic and historic use, logging history, prior CFIP projects)
B. / PRESENT LAND USE
C. / VEGETATION TYPE DESCRIPTION
E. / TIMBER STAND DESCRIPTION
(Basal area, vigor, site/age class, growth potential rehabilitation possibilities, current sylvicultural practice)
F. / SOILS
(Soil series type with brief description, slope, aspect, elevation)
G. / DESCRIBE PROPERTY BOUNDARIES AND CORNERS
(Flagging colors, corner location, availability of survey notes)
H. / TRANSPORTATION SYSTEM
(Including location to drainages, condition, drainage structures, maintenance requirements, etc.)
IV. / LANDOWNERS PERSONAL MANAGEMENT OBJECTIVES
As well as Land Use Alternatives
V. / FUTURE HARVEST PLANS, MARKET CONDITIONS/LOCATIONS, AND BRIEF ECONOMIC ASSESSMENT
VI. / FIRE PROTECTION PLANS
VII. / INSECT AND DISEASE PROBLEMS
VIII. / SECURITY CONCERNS
IX. / RECREATION POTENTIAL, PROJECTS
X. / AESTHETIC CONSIDERATIONS, IMPACTS
XI. / ARCHAEOLOGICAL, HISTORICAL, CULTURAL CONSIDERATIONS
XII. / COMMUNITY/AGENCY COOPETATION MECHANISMS
XIII. / FORESTRY ASSISTANCE MANAGEMENT RECOMMENDATIONS
XIV. / WETLANDS
XV. / CARBON CYCLE & CLIMATE CHANGE
XVI / FOREST RESOURCE IMPROVEMENT NEEDS / POTENTIAL PROJECT DESCRIPTIONS
A. / SITE PREPARATION
B. / TREE PLANTING
C. / TREE SHELTERS
D. / PRE-COMMERCIAL THINNING
E. / PRUNING
F. / FOLLOW-UP
G. / RELEASE
H. / LAND CONSERVATION MEASURES
I. / FISH AND WILDLIFE IMPROVEMENTS

Attach maps that refer to information included in the Management Plan as an Exhibit or Attachment at the back of the plan. Maps will include a USGS quadrangle map at a minimum scale of 4 inches = 1 mile that identifies the ownership as well as the location of proposed project, roads, water courses, and all other pertinent information that will help with property management issues.

Page 1 of 5