Department of Finance and Deregulation 2011 Calendar Year Listing of Department Contracts

Department of Finance and Deregulation 2011 Calendar Year Listing of Department Contracts

CALENDAR YEAR 2011 SENATE ORDER ON DEPARTMENTAL AND AGENCY CONTRACTS LISTING RELATING TO THE PERIOD
1 JANUARY 2011 TO 31 DECEMBER 2011

Pursuant to the Senate Order on departmental and agency contracts the following table sets out contracts entered into by the DepartmentofFinanceandDeregulationwhich provide for a consideration to the value of $100 000or more and which:

(a)have not been fully performed as at 31December 2011; or

(b)have been entered into during the 12months prior to 31 December 2011.

Most of the contracts listed contain confidentiality provisions of a general nature that are designed to protect the confidential information of the parties that may be obtained or generated in carrying out the contract.

The reasons for including such clauses include:

  • ordinary commercial prudence that requires protection of trade secrets, proprietary information and the like; and/or
  • protection of other Commonwealth material and personal information.

CONTRACTOR / SUBJECT MATTER / AMOUNT OF CONSIDERATION ($) / COMMENCEMENT DATE / ANTICIPATED END DATE / WHETHER CONTRACT CONTAINS PROVISIONS REQUIRING THE PARTIES TO MAINTAIN CONFIDENTIALITY OF ANY OF ITS PROVISIONS
(Y/N) / WHETHER CONTRACT CONTAINS 'OTHER REQUIREMENTS OF CONFIDENTIALITY' (Y/N) / REASONS FOR CONFIDENTIALITY
AAPT / INTERNET BASED NETWORK CONNECTION DEPARTMENT OF DEFENCE / 1,648,020 / 1/10/2011 / 30/10/2013 / Y / N / COSTING/ PROFIT INFORMATION
AAPT / TELEPHONE COMMUNICATION SERVICES / 1,163,285 / 27/07/2006 / 2/07/2012 / N / N / N/A
ACT JEWISH COMMUNITY INC. / CAR PARK COSTS / 219,628 / 1/12/2010 / 30/11/2012 / N / N / N/A
ACUMEN CONTRACTING & RECRUITMENT / ENGAGEMENT OF CONTRACTOR / 106,920 / 11/07/2011 / 13/01/2012 / N / N / N/A
ACUMEN CONTRACTING & RECRUITMENT / TEST ANALYST IN ORDER TO SUPPORT PROJECT ACTIVITIES / 300,160 / 6/12/2010 / 30/06/2012 / N / N / N/A
ACUMEN CONTRACTING & RECRUITMENT / TESTER FOR IT APPLICATIONS / 198,000 / 29/06/2011 / 30/06/2012 / N / N / N/A
ACUMEN CONTRACTING & RECRUITMENT / CONTRACTOR SERVICES / 187,000 / 14/02/2011 / 30/06/2012 / N / N / N/A
ACUMEN CONTRACTING & RECRUITMENT / MANAGER FOR PROJECT MANAGEMENT FRAMEWORK PROJECT / 156,816 / 6/06/2011 / 23/12/2011 / N / N / N/A
ACUMEN CONTRACTING & RECRUITMENT / SERVICES OF AN INFRASTRUCTURE SPECIALIST / 183,172 / 5/12/2011 / 29/06/2012 / N / N / N/A
ACUMEN CONTRACTING & RECRUITMENT / SERVICES OF AN IT ARCHITECT / 146,432 / 19/12/2011 / 29/06/2012 / N / N / N/A
ADCORP AUSTRALIA LTD / NON-CAMPAIGN RECRUITMENT ADVERTISING / 825,000 / 1/06/2009 / 30/05/2012 / N / N / N/A
AECOM AUSTRALIA PTY LTD / ENVIRONMENTAL AUDITOR SERVICES FOR THE MOOREBANK PROJECT / 108,343 / 11/01/2011 / 31/07/2012 / N / N / N/A
ALLAN HAWKE / CONSULTANCY SERVICES FOR THE INDEPENDENT COMMUNICATIONS COMMITTEE / 350,000 / 24/05/2010 / 24/05/2012 / N / N / N/A
APIS CONSULTING GROUP PTY LTD / PROJECT MANAGEMENT OFFICE SUPPORT SERVICES FOR THE CENTRAL BUDGET MANAGEMENT SYSTEM REDEVELOPMENT PROJECT / 1,582,000 / 1/07/2010 / 30/11/2012 / N / N / N/A
APP CORPORATION PTY LTD / PROJECT MANAGEMENT SERVICES FOR NATIONAL PORTRAIT GALLERY / 2,337,543 / 14/12/2005 / 30/06/2012 / N / N / N/A
APP CORPORATION PTY LTD / PROJECT MANAGER AND SUPERINTENDENCY FOR THE FIT OUT OF ANZAC PARK WEST / 3,518,144 / 30/09/2004 / 31/12/2012 / N / N / N/A
AQUITAINE CONSULTING PTY LTD / INDEPENDENT STEERING COMMITTEE MEMBER / 225,320 / 19/07/2010 / 30/11/2012 / N / N / N/A
ARK CLIMATE / GREENPOWER FOR ELECTORATE OFFICES / 224,975 / 1/07/2010 / 30/06/2013 / N / N / N/A
ARKADIUSZ GREBOWSKI / HANDYMAN SERVICES / 133,300 / 13/07/2009 / 12/07/2012 / N / N / N/A
AURECON AUSTRALIA PTY LTD / PROJECT MANAGER AND SUPERINTENDENCY FOR THE REDEVELOPMENT OF THE ROYAL AUSTRALIAN MINT / 2,188,591 / 26/07/2006 / 31/12/2012 / N / N / N/A
AURION CORPORATION PTY LTD / PROJECT MANAGER AND SUPERINTENDENCY FOR THE REDEVELOPMENT OF THE ROYAL AUSTRALIAN MINT / 126,500 / 28/06/2011 / 30/06/2012 / N / N / N/A
AUSTRALIA POST / MAIL DISTRIBUTION AND COURIER SERVICES / 341,000 / 1/12/2011 / 30/11/2012 / N / N / N/A
AUSTRALIAN ASSOCIATED PRESS / MEDIA MONITORING SERVICES / 319,440 / 1/12/2010 / 30/04/2012 / N / N / N/A
AUSTRALIAN DESTRUCTION SERVICES / WASTE PAPER COLLECTION RECYCLING AND WASTE DESTRUCTION / 114,906 / 9/07/2009 / 8/07/2012 / N / N / N/A
AUSTRALIAN ETHICAL BALANCED TRUST / RENT COSTS / 1,442,460 / 23/11/2006 / 22/01/2016 / N / N / N/A
AUSTRALIAN ETHICAL BALANCED TRUST / RENT COSTS / 3,482,594 / 23/11/2006 / 22/01/2016 / N / N / N/A
AUSTRALIAN ETHICAL INVESTMENT LTD / RENT COSTS / 1,902,144 / 1/01/2011 / 31/12/2015 / N / N / N/A
AUSTRALIAN GOVERNMENT ACTUARY / ADVICE ON ACTUARIAL ISSUES REGARDING THE AUSTRALIAN GOVERNMENT ASSET FUNDS / 195,000 / 8/09/2008 / 31/12/2013 / N / N / N/A
AUSTRALIAN MEDICAL ASSOCIATION / RENT COSTS / 3,072,033 / 1/01/2011 / 21/12/2015 / N / N / N/A
AUSTRALIAN NATIONAL UNIVERSITY / POSTGRADUATE STUDY PROGRAM / 397,904 / 1/08/2010 / 31/07/2012 / N / N / N/A
AUSTRALIAN NATIONAL UNIVERSITY / EDUCATION EXPENSES FOR STAFF / 117,000 / 1/08/2011 / 30/06/2012 / N / N / N/A
AUSTRALIAN NATIONAL UNIVERSITY / PUBLIC FINANCIAL MANAGEMENT DEVELOPMENT PROGRAM FOR PACIFIC ISLANDS / 155,604 / 7/02/2011 / 18/02/2011 / N / N / N/A
AUSTRALIAN TRUCKING ASSOCIATION / RENT COSTS / 4,836,843 / 22/06/2009 / 21/06/2014 / N / N / N/A
BILL ROSS & ASSOCIATES PTY LTD / CONTRACTOR SERVICES FOR THE DEPARTMENT OF AGRICULTURE, FISHERIES AND FORESTRY'S POST ENTRY QUARANTINE PROJECT / 2,575,216 / 4/08/2010 / 30/06/2012 / N / N / N/A
BLAKE DAWSON WALDRON / LEGAL ADVICE FOR THE MOOREBANK PROJECT / 1,325,000 / 21/09/2010 / 30/06/2012 / N / N / N/A
BLAKE DAWSON WALDRON / PROVISION OF PROBITY ADVISER SERVICES TO ASSIST WITH THE PROCUREMENT OF VEHICLE FLEET MANAGEMENT AND LEASING SERVICES FOR THE AUSTRALIAN GOVERNMENT / 123,558 / 23/11/2011 / 31/03/2013 / N / N / N/A
BLAKE DAWSON WALDRON / LEGAL COSTS SHARJADE / 1,365,937 / 24/07/2006 / 30/06/2012 / N / N / N/A
BLAKE DAWSON WALDRON / LEGAL COSTS FOR BLOCK 3 SECTION 22 BARTON / 384,868 / 12/05/2008 / 30/06/2012 / N / N / N/A
BLAKE DAWSON WALDRON / LEGAL CONVEYANCING SERVICES COX PENINSULA NT / 144,619 / 29/10/2009 / 30/06/2012 / N / N / N/A
BLAKE DAWSON WALDRON / LEGAL SERVICES FOR THE DEPARTMENT OF AGRICULTURE, FISHERIES AND FORESTRY'S POST ENTRY QUARANTINE PROJECT / 125,000 / 1/07/2011 / 30/06/2012 / N / N / N/A
BLAKE DAWSON WALDRON / LEGAL SERVICES RELATING TO MALABAR HEADLAND / 105,420 / 1/07/2011 / 30/06/2012 / N / N / N/A
BOSTON CONSULTING GROUP PTY LTD / SERVICES TO PREPARE BUSINESS CASE FOR A RELIANCE FRAMEWORK / 1,780,376 / 23/11/2011 / 30/06/2012 / N / N / N/A
CABCHARGE AUSTRALIA LTD / CAB CHARGE COSTS / 352,000 / 28/08/2011 / 30/06/2012 / N / N / N/A
CANDLE ICT / BUSINESS ANALYST TO UNDERTAKE ANALYSIS WORK FOR A NUMBER OF PROJECTS / 129,360 / 4/07/2011 / 12/12/2011 / N / N / N/A
CANDLE ICT / DATABASE ADMINISTRATOR FOR THE CENTRAL BUDGET MANAGEMENT SYSTEM PROJECT / 593,300 / 1/07/2010 / 30/06/2012 / N / N / N/A
CAPITAL INDOOR PLANT HIRE / INDOOR PLANT HIRE SERVICES / 252,285 / 27/07/2009 / 26/07/2012 / N / N / N/A
CEVA LOGISTICS PTY LTD / TRANSPORT OF VEHICLES / 160,000 / 26/08/2011 / 31/12/2011 / N / N / N/A
CITEC / PAYROLL DISBURSEMENTS FOR PARLIAMENTARY STAFF / 186,944 / 1/08/2009 / 31/07/2012 / N / N / N/A
CLAYTON UTZ / LEGAL SERVICES / 117,052 / 1/03/2011 / 31/12/2011 / N / N / N/A
CLAYTON UTZ / LEGAL SEVICES FOR TRANSITION AND IMPLEMENTATION OF WHOLE OF GOVERNMENT TRAVEL SERVICE / 146,571 / 9/06/2010 / 31/12/2011 / Y / N / COSTING/ PROFIT INFORMATION
CLAYTON UTZ / LEGAL SERVICES / 215,682 / 13/07/2011 / 31/03/2012 / N / N / N/A
CLAYTON UTZ / LEGAL ADVICE ON CONTRACTUAL MATTERS FOR THE VILLAWOOD IMMIGRATION DETENTION FACILITY PROJECT / 139,696 / 9/09/2009 / 31/12/2016 / N / N / N/A
CLAYTON UTZ / LEGAL SERVICES FOR LITIGATION / 100,000 / 1/07/2010 / 30/06/2012 / N / N / N/A
CLAYTON UTZ / LEGAL SERVICES FOR THE COMMONWEALTH NEW BUILDING PROJECT / 417,800 / 7/08/2006 / 30/06/2014 / N / N / N/A
CLICKS RECUIT PTY LTD / PROVIDE PROJECT MANAGEMENT SKILLS / 154,396 / 12/12/2011 / 30/06/2012 / N / N / N/A
CLICKS RECUIT PTY LTD / IT SOLUTIONS ARCHITECT SERVICES / 336,728 / 1/08/2011 / 30/06/2012 / N / N / N/A
COFFEY INTERNATIONAL DEVELOPMENT / ECONOMIC AND PUBLIC SECTOR GOVERNANCE TWINNING INITIATIVE PHASE II / 209,692 / 1/07/2010 / 31/12/2011 / N / N / N/A
COMGROUP AUSTRALIA / IT ACCOUNT MANAGEMENT / 570,000 / 1/07/2010 / 31/07/2012 / N / N / N/A
COMMONWEALTH BANK OF AUSTRALIA / BANKING SERVICES / 200,000 / 1/03/2010 / 28/02/2015 / N / N / N/A
COMMS AUST PTY LTD T/A / PABX MAINTENANCE SUPPORT SERVICES / 454,873 / 18/06/2010 / 30/12/2012 / N / N / N/A
COMMUNITIES@WORK / CHILD CARE SERVICES / 3,851,925 / 23/07/2007 / 24/12/2013 / N / N / N/A
COMPAS PTY LTD / PROVISION OF SOFTWARE DEVELOPMENT AND APPLICATION ARCHITECTURAL SERVICES / 425,000 / 5/04/2010 / 13/04/2012 / N / N / N/A
COMPAS PTY LTD / CONTRACTOR SERVICES FOR DATABASE ADMINISTRATION / 430,000 / 6/02/2010 / 3/02/2012 / N / N / N/A
CORDELTA PTY LTD / PROJECT MANAGEMENT SERVICES FOR INTRA GOVERNMENT COMMUNICATIONS NETWORK / 322,000 / 10/01/2011 / 29/02/2012 / N / N / N/A
COWAN HOLDINGS PTY LTD / IT SUPPORT AND MAINTENANCE SERVICES TO COMCAR / 100,000 / 1/10/2010 / 30/06/2012 / N / N / N/A
CSC AUSTRALIA PTY LTD MACQUARIE PAR / PROVISION OF A CENTRAL BUDGET MANAGEMENT SYSTEM SOLUTION AND OTHER RELATED SERVICES / 26,400,000 / 19/09/2011 / 27/12/2013 / N / N / N/A
DATA#3 / ANNUAL PAYMENT OF SOFTWARE TRUE UP COSTS FOR AGENCIES PARTICIPATING IN CORE DESKTOP LICENSE / 18,441,647 / 29/07/2011 / 30/06/2012 / N / N / N/A
DATA#3 / MICROSOFT SOFTWARE LICENSES / 228,030 / 1/09/2011 / 30/06/2013 / N / N / N/A
DATA#3 / MICROSOFT SOFTWARE LICENSES / 736,054 / 20/12/2011 / 30/06/2013 / N / N / N/A
DATA#3 / SOFTWARE ASSURANCE COSTS FOR AGENCIES PARTICIPATING IN THE CORE DESK TOP LICENSE / 50,644,084 / 29/07/2011 / 30/06/2012 / N / N / N/A
DATA#3 / MICROSOFT PRODUCTS FOR CENTRAL BUDGET MANAGEMENT SYSTEM / 112,857 / 1/07/2011 / 30/06/2013 / N / N / N/A
DATA#3 / MICROSOFT LICENSE MAINTENANCE / 1,096,854 / 1/07/2011 / 30/06/2012 / N / N / N/A
DATA#3 / MICROSOFT WINDOWS FOR SHAREPOINT INFRASTRUCTURE UPGRADE INITIATIVE / 100,058 / 18/04/2011 / 30/06/2013 / N / N / N/A
DAVIDSON TRAHAIRE CORPSYCH / MANAGEMENT CONSULTING IN RELATION TO EMPLOYEE ASSISTANCE SERVICES / 248,252 / 1/08/2008 / 30/09/2012 / N / N / N/A
DAVIDSON TRAHAIRE CORPSYCH / EMPLOYEE ASSISTANCE PROGRAM SERVICES / 291,265 / 13/11/2007 / 30/06/2012 / N / N / N/A
DELOITTE TOUCHE TOHMATSU / CONSULTANCY SERVICES / 400,000 / 6/06/2011 / 30/06/2012 / N / N / N/A
DELOITTE TOUCHE TOHMATSU / TRAINING AND EDUCATION SERVICES FOR COMCOVER FUND / 1,576,650 / 26/03/2008 / 25/03/2012 / N / N / N/A
DELOITTE TOUCHE TOHMATSU / PROVISION OF RISK MANAGEMENT BENCHMARKING SERVICES FOR THE COMCOVER FUND / 895,000 / 16/11/2009 / 15/11/2012 / N / N / N/A
DELOITTE TOUCHE TOHMATSU / BUSINESS ADVISORY SERVICES / 479,777 / 29/06/2011 / 31/03/2012 / N / N / N/A
DELOITTE TOUCHE TOHMATSU / MARKET ANALYSIS OF E-INVOICING / 105,000 / 25/10/2011 / 9/01/2012 / N / N / N/A
DELOITTE TOUCHE TOHMATSU / PROVISION OF BUSINESS ADVISER SERVICES TO ASSIST WITH THE PROCUREMENT OF VEHICLE FLEET MANAGEMENT AND LEASING SERVICES FOR THE AUSTRALIAN GOVERNMENT / 281,694 / 17/11/2011 / 31/03/2013 / N / N / N/A
DEPARTMENT OF SERVICES, TECHNOLOGY / IMPLEMENTATION OF HARDWARE / 350,888 / 26/10/2011 / 9/04/2012 / N / N / N/A
DEPARTMENT OF SERVICES, TECHNOLOGY / SUPPORT, MAINTENANCE AND DEVELOPMENT SERVICES / 1,779,800 / 17/12/2009 / 13/12/2012 / N / Y / OTHER/ IT SECURITY
DIMENSION DATA AUSTRALIA PTY LTD / SUPPORT AND MAINTENANCE SERVICES COMMUNICATIONS NETWORK EQUIPMENT / 580,000 / 15/12/2010 / 5/05/2012 / N / N / N/A
DIMENSION DATA AUSTRALIA PTY LTD / VMWARE PROFESSIONAL SERVICES CREDITS FOR TRANSITION AND SOURCING STRATEGY PROJECT / 130,639 / 1/02/2011 / 30/04/2011 / N / N / N/A
DIMENSION DATA AUSTRALIA PTY LTD / IT HARDWARE / 500,000 / 21/06/2011 / 30/06/2011 / N / N / N/A
DLA PIPER / LEGAL ADVICE TO ASSIST WITH THE TENDER AND OUTSOURCING OF THE ADMINISTRATION OF PUBLIC SECTOR SUPERANNUATION ACCUMULATION PLAN / 505,000 / 9/04/2010 / 31/03/2012 / N / N / N/A
DOWSE PROJECTS / LEASE STRATEGY SERVICES / 148,500 / 16/05/2011 / 30/06/2012 / N / N / N/A
DOWSE PROJECTS / PROJECT MANAGEMENT SERVICE - FINANCE TENANCY / 614,100 / 5/12/2011 / 15/04/2012 / N / N / N/A
ECOWISE SERVICES AUSTRALIA PTY LTD / INTRA GOVERNMENT COMMUNICATIONS NETWORK CIVIL WORK / 119,845 / 28/04/2011 / 30/06/2011 / N / N / N/A
ECOWISE SERVICES AUSTRALIA PTY LTD / INTRA GOVERNMENT COMMUNICATIONS NETWORK CIVIL WORK / 187,479 / 23/05/2011 / 30/06/2011 / N / N / N/A
ERM POWER RETAIL PTY LTD / ELECTRICITY SERVICES / 1,046,170 / 1/07/2011 / 30/06/2015 / N / N / N/A
ERM POWER RETAIL PTY LTD / ELECTRICITY SUPPLY / 330,000 / 1/07/2011 / 30/06/2012 / N / N / N/A
ERNST & YOUNG / SERVICES TO UNDERTAKE A SCOPING STUDY / 528,375 / 30/03/2011 / 9/06/2011 / N / N / N/A
ERNST & YOUNG / BUSINESS ADVISER FOR STATIONERY AND OFFICE SUPPLIES IMPLEMENTATION PHASE / 148,500 / 8/04/2011 / 31/12/2011 / N / N / N/A
FINITE RECRUITMENT / CONTRACTOR SERVICES FOR DATA CENTRE STRATEGY IMPLEMENTATION / 188,050 / 27/06/2011 / 30/03/2012 / N / N / N/A
FINITE RECRUITMENT / ENGAGEMENT OF MICROSOFT EXCEL SPECIALIST FOR INTRA GOVERNMENT COMMUNICATIONS NETWORK / 136,520 / 8/02/2011 / 7/03/2012 / N / N / N/A
FINITE RECRUITMENT / PROVISION OF SENIOR SOFTWARE DEVELOPER SERVICES / 459,589 / 19/04/2010 / 13/04/2012 / N / N / N/A
FINITE RECRUITMENT / MICROSOFT WINDOWS FOR SHAREPOINT INFRASTRUCTURE UPGRADE INITIATIVE / 152,856 / 6/07/2011 / 30/03/2012 / N / N / N/A
FINITY CONSULTING PTY LTD / INSURANCE ADVISOR FOR COMCOVER REVIEW / 129,000 / 29/07/2011 / 31/03/2012 / Y / N / COSTING/ PROFIT INFORMATION
FOXTEL CABLE TV PTY LTD / PROVISION OF PAY TELEVISION SERVICES / 108,000 / 17/03/2011 / 16/03/2014 / N / N / N/A
FUJITSU AUSTRALIA LTD / PROVIDE LICENCE AND SUPPORT TO THE NOMAD ARCHIVE FOR MINISTERIAL AND PARLIAMENTARY SERVICES / 112,489 / 1/06/2009 / 31/05/2012 / N / N / N/A
FULTON HOGAN INDUSTRIES PTY LTD / WORKS CONTRACTOR FOR COCOS ISLANDS AIRCRAFT PAVEMENT REFURBISHMENT PROJECT / 18,658,438 / 14/11/2011 / 30/06/2013 / N / N / N/A
FUNNELBACK PTY LTD / GOVERNMENT SEARCH SERVICE / 3,816,172 / 12/10/2011 / 12/10/2014 / N / N / N/A
GALLAGHER BASSETT SERVICES PTY LTD / CLAIMS MANAGEMENT SERVICES FOR THE COMCOVER FUND / 21,200,000 / 1/03/2009 / 28/02/2013 / N / N / N/A
GARTNER AUSTRALASIA PTY LTD / RESEARCH ADVISORY SERVICE / 503,826 / 1/02/2009 / 31/01/2012 / Y / N / COSTING/ PROFIT INFORMATION
GREGORY COMMERCIAL FURNITURE / SUPPLY OF OFFICE CHAIRS TO ACT TENANCIES / 100,000 / 7/04/2009 / 6/04/2012 / N / N / N/A
GREYTHORN PTY LTD / CONTRACTOR TO PERFORM SECURITY ASSESSMENT OF THE AUSTRALIAN GOVERNMENT ONLINE SERVICE POINT SYSTEM / 109,380 / 2/05/2011 / 29/02/2012 / N / N / N/A
GREYTHORN PTY LTD / PROJECT MANAGER FOR NATIONAL COLLOBORATION FRAMEWORK / 105,000 / 2/02/2011 / 1/08/2011 / N / N / N/A
GUTTERIDGE HASKINS & DAVEY PTY LTD / ASSET AND PROJECT MANAGEMENT CAPABILITY ASSESSMENT SERVICES / 376,617 / 28/03/2011 / 28/02/2012 / N / N / N/A
GUTTERIDGE HASKINS & DAVEY PTY LTD / DESIGN AND PROJECT MANAGEMENT FOR COCOS KEELING ISLAND AIRCRAFT PAVEMENT REFURBISHMENT PROJECT / 730,860 / 21/02/2011 / 28/09/2013 / N / N / N/A
GUTTERIDGE HASKINS & DAVEY PTY LTD / PROJECT MANAGEMENT SERVICES FOR THE COMMONWEALTH NEW BUILDING PROJECT / 7,394,489 / 3/01/2007 / 30/06/2014 / N / N / N/A
HANSEN YUNCKEN PTY LTD / MANAGING CONTRACTOR FOR THE VILLAWOOD IMMIGRATION DETENTION FACILITY PROJECT / 47,986,092 / 9/07/2010 / 31/12/2016 / N / N / N/A
HAYS PERSONNEL SERVICES / SERVICES OF AN IT ARCHITECT / 229,284 / 19/12/2011 / 28/09/2012 / N / N / N/A
HAYS PERSONNEL SERVICES / SPECIALISED COMMERCIAL ACCOUNTING SERVICES / 391,385 / 1/12/2009 / 30/11/2012 / N / N / N/A
HELEN RODDA WILLIAMS / CONSULTANCY SERVICES FOR THE INDEPENDENT COMMUNICATIONS COMMITTEE / 316,800 / 24/05/2010 / 24/05/2012 / N / N / N/A
HONEYWELL LTD / ELECTRONIC ACCESS CONTROL / 186,648 / 6/09/2011 / 30/06/2013 / N / N / N/A
HONEYWELL LTD / ELECTRONIC ACCESS CONTROL SYSTEM MAINTENANCE / 569,861 / 1/07/2010 / 30/06/2013 / N / N / N/A
HP FINANCIAL SERVICES PTY LTD / LEASE OF ICT HARDWARE / 10,945,377 / 1/03/2005 / 31/05/2014 / N / N / N/A
HRG AUSTRALIA / TRAVEL MANAGEMENT SERVICES / 3,764,467 / 1/01/2010 / 30/06/2012 / N / N / N/A
ICON RECRUITMENT PTY LTD / SOLUTIONS ARCHITECT FOR ONLINE TRANSACTIONS CAPABILITY AND RELATED WORK / 124,740 / 23/05/2011 / 23/09/2011 / N / N / N/A
ICON RECRUITMENT PTY LTD / CONTRACTOR SERVICES FOR PROJECT MANAGER / 141,900 / 11/04/2011 / 14/10/2011 / N / N / N/A
ICON RECRUITMENT PTY LTD / ENGAGEMENT OF TEST SERVICES MANAGER / 173,944 / 11/04/2011 / 28/10/2011 / N / N / N/A
ICON RECRUITMENT PTY LTD / PROCUREMENT SPECIALIST SERVICES / 158,928 / 11/04/2011 / 9/03/2012 / N / N / N/A
ICON RECRUITMENT PTY LTD / SERVICES OF A PROJECT MANAGER / 190,300 / 17/10/2011 / 29/06/2012 / N / N / N/A
ICON RECRUITMENT PTY LTD / SERVICES OF AN IT PROJECT MANAGER / 242,880 / 1/07/2011 / 30/06/2012 / N / N / N/A
ICON RECRUITMENT PTY LTD / SERVICES OF AN IT PROJECT MANAGER / 319,616 / 1/07/2011 / 30/06/2012 / N / N / N/A
INCOLL MANAGEMENT PTY LTD / PROJECT MANAGER AND CONTRACT ADMINISTRATOR SERVICES FOR THE VILLAWOOD IMMIGRATION DETENTION FACILITY PROJECT / 4,984,208 / 6/08/2010 / 31/12/2016 / N / N / N/A
INFRONT SYSTEMS PTY LTD / EMC ADVANCED AND SOFTWARE SUPPORT / 135,809 / 3/02/2011 / 16/03/2011 / N / N / N/A
INFRONT SYSTEMS PTY LTD / RACK MOUNT SERVERS / 128,079 / 7/06/2011 / 1/08/2011 / N / N / N/A
INFRONT SYSTEMS PTY LTD / STORAGE SWITCH NETWORK ATTACHED STORAGE UPGRADE / 400,229 / 16/09/2009 / 15/09/2012 / N / N / N/A
INFRONT SYSTEMS PTY LTD / STORAGE TO SUPPORT BACKUP CONSOLIDATION PROJECT / 142,225 / 16/09/2009 / 15/09/2012 / N / N / N/A
INTEGRATED SPACE PTY LTD / RENT COSTS / 1,902,144 / 1/01/2011 / 31/12/2015 / N / N / N/A
INTERNATIONAL SOS PTY LTD / OVERSEAS MEDICAL AND TRAVEL ASSISTANCE FOR COMCOVER FUND / 2,100,000 / 1/07/2009 / 30/06/2012 / N / N / N/A
IRON MOUNTAIN AUSTRALIA PTY LTD / PROVISION OF OFFSITE RECORDS STORAGE / 1,067,540 / 24/12/2008 / 1/01/2013 / N / N / N/A
IRON MOUNTAIN AUSTRALIA PTY LTD / STORAGE LICENSE AGREEMENT / 211,200 / 1/07/2009 / 31/12/2012 / N / N / N/A
ISS FACILITY SERVICES AUSTRALIA PTY / PROVISION OF CLEANING SERVICES / 734,500 / 1/02/2011 / 30/06/2012 / N / N / N/A
JOHN HOLLAND GROUP / CONSTRUCTION CONTRACTOR FOR NATIONAL PORTRAIT GALLERY / 89,295,756 / 5/06/2006 / 30/06/2012 / N / N / N/A
JONES LANG LASALLE PTY LTD / SALES SERVICES FOR BARTON PROPERTY / 150,000 / 23/09/2011 / 30/06/2012 / N / N / N/A
KONEKT AUSTRALIA PTY LTD / OCCUPATIONAL HEALTH AND SAFETY AND MEDICAL COSTS / 7,381,120 / 27/10/2008 / 30/06/2012 / N / N / N/A
KPMG ACTUARIAL PTY LTD / ACTUARIAL SERVICES IN RELATION TO THE COMCOVER FUND / 610,000 / 28/04/2008 / 27/04/2012 / N / N / N/A
KPMG ACTUARIAL PTY LTD / SERVICES TO ASSIST IN THE STRATEGIC REVIEW OF SMALL REGULATORY FUNCTIONS WITHIN COMMONWEALTH PORTFOLIOS / 284,951 / 27/09/2011 / 20/12/2011 / N / N / N/A
KPMG AUSTRALIA / LEAD ADVISORY SERVICES FOR THE MOOREBANK PROJECT / 16,987,369 / 30/09/2010 / 31/07/2012 / N / N / N/A
KPMG AUSTRALIA / BUSINESS ADVISORY SERVICES FOR THE CENTRAL BUDGET MANAGEMENT SYSTEM REDEVELOPMENT PROJECT / 680,000 / 6/07/2010 / 30/06/2012 / N / N / N/A
KPMG AUSTRALIA / FINANCIAL REPORTING ALLIANCE SERVICES FOR WHOLE-OF-GOVERNMENT ACCOUNTS / 5,000,000 / 1/04/2011 / 30/03/2014 / Y / N / COSTING/PROFIT INFORMATION
KPMG AUSTRALIA / INDEPENDENT VERIFICATION OF THE COLLECTION DATA / 234,089 / 1/03/2011 / 20/12/2011 / N / N / N/A
KREAB GAVIN ANDERSON LTD / COMMUNICATIONS RESEARCH ADVISORY SERVICES IN RELATION TO THE MOOREBANK PROJECT / 394,130 / 29/09/2010 / 30/06/2012 / N / N / N/A
KREAB GAVIN ANDERSON LTD / COMMUNICATION ADVICE FOR THE MOOREBANK PROJECT / 1,722,000 / 22/09/2010 / 30/06/2012 / N / N / N/A
LEASEPLAN AUSTRALIA / LEASE CHARGES FOR THE EXECUTIVE VEHICLE SCHEME / 4,435,640 / 5/11/2008 / 31/01/2013 / N / N / N/A
LEASEPLAN AUSTRALIA / VEHICLE HIRE EXPENSES / 4,840,000 / 1/12/2010 / 30/06/2012 / N / N / N/A
LEND LEASE CORPORATION LTD / MANAGING CONTRACTOR FOR THE FIT OUT OF ANZAC PARK WEST / 38,074,901 / 4/02/2009 / 31/12/2012 / N / N / N/A
LEND LEASE CORPORATION LTD / MANAGING CONTRACTOR SERVICES FOR THE COMMONWEALTH NEW BUILDING PROJECT / 596,635,995 / 5/09/2007 / 30/06/2014 / Y / Y / SECRECY PROVISIONS,COSTING/PROFIT INFORMATION
LEXMARK INTERNATIONAL PTY LTD / COMPUTER PRINTER MAINTENANCE / 1,500,000 / 15/07/2011 / 15/07/2014 / N / N / N/A
LINCHPIN MAINTENANCE PTY LTD / HANDYMAN SERVICES / 110,000 / 24/07/2009 / 23/07/2012 / N / N / N/A
LOLITA NO 1 PTY LTD / RENT COSTS / 1,510,000 / 1/10/2010 / 1/10/2015 / N / N / N/A
LYNDCOTE PTY LTD / ADVICE FOR IMPLEMENTATION OF JOINT UNDERSTANDING BETWEEN PAPUA NEW GUINEA AND AUSTRALIA / 240,000 / 18/08/2010 / 31/12/2012 / N / N / N/A
LYNDCOTE PTY LTD / CONSULTANCY SERVICES FOR PAPUA NEW GUINEA ON THE LIQUEFIED NATURAL GAS PROJECT / 240,000 / 6/01/2011 / 5/05/2011 / N / N / N/A
MALLESONS STEPHEN JACQUES / PROVISION OF LEGAL ADVISER SERVICES TO ASSIST WITH THE PROCUREMENT OF VEHICLE FLEET MANAGEMENT AND LEASING SERVICES FOR THE AUSTRALIAN GOVERNMENT / 213,580 / 22/11/2011 / 30/06/2012 / N / N / N/A
MEDIABRANDS AUSTRALIA PTY LTD / PLANNING AND PLACEMENT OF CAMPAIGN ADVERTISING / 13,200,000 / 1/07/2009 / 30/06/2012 / N / Y / OTHER: MEDIA BRIEFS, MEDIA BOOKING AUTHORITIES, NEGOTIATED MEDIA RATES
MEDIBANK HEALTH SOLUTIONS / MEDICAL ASSESSMENTS FOR COMCAR DRIVERS / 100,000 / 1/08/2011 / 30/06/2012 / N / N / N/A
MERCER PTY LTD / CONSULTANCY ADVICE ON INVESTMENTS FOR GOVERNMENTS FINANCIAL ASSET / 250,000 / 11/03/2011 / 10/03/2014 / N / N / N/A
MERCER PTY LTD / ACTUARIAL SERVICES FOR PARLIMENTARY AND CIVILIAN SUPERANNUATION SCHEMES / 3,820,000 / 11/09/2008 / 31/12/2013 / N / N / N/A
MICROSOFT PTY LTD / MICROSOFT PREMIER SUPPORT SERVICE RENEWAL / 104,134 / 1/06/2011 / 31/05/2012 / N / N / N/A
MOSAIC RECRUITMENT / IT PROJECT MANAGER SERVICES / 305,738 / 11/03/2011 / 30/06/2012 / N / N / N/A
MRB COMMUNICATIONS PTY LTD / INTRA GOVERNMENT COMMUNICATIONS NETWORK CABLE CONSTRUCTION SERVICES / 686,180 / 21/04/2011 / 30/09/2011 / N / N / N/A
MRB COMMUNICATIONS PTY LTD / INTRA GOVERNMENT COMMUNICATIONS NETWORK CIVIL WORK / 211,200 / 24/08/2011 / 31/10/2011 / N / N / N/A
MRB COMMUNICATIONS PTY LTD / INTRA GOVERNMENT COMMUNICATIONS NETWORK CIVIL WORK / 116,050 / 2/05/2011 / 30/06/2011 / N / N / N/A
MSS SECURITY PTY LTD / SECURITY SERVICES / 260,000 / 21/09/2010 / 30/06/2011 / N / N / N/A
MURCOTTS DRIVING EXCELLENCE PTY LTD / MOTOR VEHICLE TRAINING FOR DRIVING STAFF / 247,760 / 27/04/2011 / 30/09/2012 / N / N / N/A
MURRAYS AUSTRALIA / PROVISION OF TRANSPORT SERVICES / 1,500,000 / 1/09/2011 / 30/11/2011 / N / N / N/A
NATIONAL CAPITAL AUTHORITY / RENT COSTS / 3,069,685 / 1/07/2009 / 4/11/2016 / N / N / N/A
NGA.NET PTY LTD / E-RECRUITMENT SERVICES / 432,481 / 7/07/2010 / 17/05/2012 / N / N / N/A
NSW RIFLE ASSOCIATION / LEASE ON LAND ANZAC RIFLE RANGE / 352,434 / 1/06/1999 / 30/06/2012 / N / N / N/A
OAKTON / EVALUATION COORDINATOR SERVICES FOR THE CENTRAL BUDGET MANAGEMENT SYSTEM REDEVELOPMENT PROJECT / 219,912 / 20/01/2011 / 31/08/2011 / N / N / N/A
OAKTON SERVICES PTY LTD / REVIEW OF GOVERNEMENT PROGRAMS / 121,000 / 5/09/2011 / 15/12/2011 / N / N / N/A
OAKTON SERVICES PTY LTD / SNARE LICENSING AND MAINTENANCE / 113,809 / 28/05/2011 / 27/05/2012 / N / N / N/A
O'DONNELL GRIFFIN / INTRA GOVERNMENT COMMUNICATIONS NETWORK FOR DIAL BEFORE YOU DIG INFRASTRUCTURE PROTECTION / 249,000 / 10/08/2011 / 30/06/2012 / N / N / N/A
O'DONNELL GRIFFIN / INTRA GOVERNMENT COMMUNICATIONS NETWORK CIVIL WORK / 109,043 / 14/11/2011 / 31/01/2012 / N / N / N/A
O'DONNELL GRIFFIN / INTRA GOVERNMENT COMMUNICATIONS NETWORK CIVIL WORK / 156,288 / 13/12/2011 / 26/04/2012 / N / N / N/A
O'DONNELL GRIFFIN / INTRA GOVERNMENT COMMUNICATIONS NETWORK CIVIL WORK / 276,727 / 7/12/2011 / 31/08/2012 / N / N / N/A
O'DONNELL GRIFFIN / INTRA GOVERNMENT COMMUNICATIONS NETWORK CONSTRUCTIONS WORKS / 1,900,000 / 14/04/2011 / 30/09/2011 / N / N / N/A
OFFICE MAX AUSTRALIA LTD / STATIONERY AND OFFICE SUPPLIES / 4,891,400 / 5/11/2008 / 30/06/2012 / N / N / N/A
OLDFIELD REMOVALS AND STORAGE / REMOVALS AND STORAGE / 345,000 / 10/07/2009 / 9/07/2012 / N / N / N/A
OPC IT PTY LTD / PROVISION OF WEB MASTER SERVICES / 170,000 / 1/05/2011 / 30/04/2012 / N / N / N/A
OPTUS NETWORKS PTY LTD / INTERNET BASED CONNECT SERVICES FOR DEPARTMENT OF HEALTH AND AGEING / 536,532 / 31/10/2011 / 30/10/2012 / Y / N / COSTING/ PROFIT INFORMATION
ORACLE AUSTRALIA PTY LTD / IT AND FACILITIES COMMUNICATIONS SOFTWARE UPDATE LICENSE AND SUPPORT / 118,401 / 1/06/2010 / 30/06/2012 / N / N / N/A
ORIMA RESEARCH PTY LTD / CUSTOMER SATISFACTION SURVEY FOR COMCOVER FUND / 130,000 / 22/10/2009 / 21/10/2012 / N / N / N/A
ORIMA RESEARCH PTY LTD / PROVISION OF THE FINANCE STAFF SURVEY / 120,000 / 29/07/2011 / 30/06/2012 / N / N / N/A
ORIMA RESEARCH PTY LTD / CUSTOMER SATISFACTION SURVEY SERVICES / 193,527 / 1/04/2010 / 31/03/2013 / N / N / N/A
PATELLA HOLDINGS / LEASE ON SITE - WOODRIDGE OFFICES, QLD / 19,456,980 / 30/05/2003 / 29/05/2102 / N / N / N/A
PAXUS AUSTRALIA PTY LTD / ENGAGEMENT OF CONTRACTOR / 242,000 / 25/07/2011 / 18/05/2012 / N / N / N/A
PAXUS AUSTRALIA PTY LTD / CONTRACTOR SERVICES TO PROVIDE SAP ENHANCEMENTS / 290,400 / 9/11/2011 / 30/06/2012 / N / N / N/A
PAXUS AUSTRALIA PTY LTD / ENGAGEMENT OF CONTRACTOR / 210,078 / 1/10/2011 / 30/06/2012 / N / N / N/A
PEOPLEBANK AUSTRALIA PTY LTD / CONTRACT SERVICES FOR BRANCH MANAGER POSITION / 368,305 / 16/10/2010 / 28/02/2012 / N / N / N/A
PHILLIPS FOX LAWYERS / LEGAL ADVICE FOR DATA CENTRE COORDINATED PROCUREMENT / 627,500 / 26/07/2010 / 30/06/2012 / N / N / N/A
PHILLIPS FOX LAWYERS / IMPLEMENTATION OF NEW WHOLE OF GOVERNMENT ICT PURCHASING ARRANGEMENTS / 250,000 / 1/07/2011 / 30/06/2012 / N / N / N/A
PHILLIPS FOX LAWYERS / LEGAL COSTS ASSISTING WITH THE RE-DEVELOPMENT OF THE ROYAL AUSTRALIAN MINT / 250,000 / 22/12/2005 / 31/12/2012 / N / N / N/A
PITNEY BOWES / REPAIR AND MAINTENANCE TO POSTAGE METERS / 700,000 / 13/07/2010 / 12/07/2015 / N / N / N/A
POWERDIRECT PTY LTD / SUPPLY OF ELECTRICITY / 2,759,922 / 1/11/2011 / 31/10/2014 / N / N / N/A
PRICEWATERHOUSECOOPERS / ADVICE FOR THE FINANCIAL REVIEW OF THE AUSTRALIAN ELECTRICIAL COMMISSION / 194,600 / 20/09/2011 / 31/01/2012 / N / N / N/A
PRICEWATERHOUSECOOPERS / INTERNAL AUDIT SERVICES TO DELIVER FINANCE AUDIT PROGRAM / 4,734,000 / 23/10/2008 / 30/06/2012 / N / N / N/A
PROFESSIONALS ONLINE / CONTRACTOR SERVICES FOR DATABASE ADMINISTRATION / 741,082 / 7/11/2009 / 30/06/2012 / N / N / N/A
RECALL TOTAL INFORMATION MANAGEMENT / STORAGE OF COMPUTER MEDIA / 350,585 / 1/12/2009 / 21/12/2012 / N / N / N/A
RESERVE BANK OF AUSTRALIA / BANK FEES / 8,667,141 / 1/07/2004 / 30/06/2012 / N / N / N/A
ROY MORGAN RESEARCH PTY LTD / STUDY OF AUSTRALIANS USE OF AND SATISFACTION WITH E-GOVERNMENT SERVICES / 244,000 / 11/05/2011 / 11/05/2012 / N / N / N/A
SAP AUSTRALIA PTY LTD / SAP ANNUAL MAINTENANCE / 121,550 / 1/07/2011 / 30/06/2012 / N / N / N/A
SAP AUSTRALIA PTY LTD / PROVISION OF COMMERCIAL-OFF-THE-SHELF SOFTWARE FOR THE CENTRAL BUDGET MANAGEMENT SYSTEM REDEVELOPMENT PROJECT / 24,716,617 / 24/03/2011 / 18/03/2016 / Y / Y / COSTING/ PROFIT INFORMATION,INTELLECTUAL PROPERTY
SIGTEC PTY LTD / COMCAR VEHICLE RESERVATION AND DISPATCH MANAGEMENT SYSTEM / 5,830,000 / 8/08/2011 / 30/06/2014 / N / N / N/A
SMS CONSULTING GROUP PTY LTD / PROJECT MANAGEMENT SERVICES FOR INTRA GOVERNMENT COMMUNICATIONS NETWORK / 119,486 / 7/02/2011 / 30/06/2011 / N / N / N/A
SMS CONSULTING GROUP PTY LTD / PROGRAM MANAGEMENT FOR CENTRAL BUDGET MANAGEMENT SYSTEM PROJECT / 596,923 / 14/08/2010 / 30/06/2012 / N / N / N/A
SMS CONSULTING GROUP PTY LTD / ENGAGEMENT OF CONTRACTOR / 149,371 / 19/09/2011 / 14/09/2012 / N / N / N/A
SNP SECURITY / GUARDING SERVICES / 302,784 / 29/06/2011 / 18/06/2012 / N / N / N/A
SNP SECURITY / GUARDING SERVICES / 800,000 / 20/06/2011 / 20/06/2014 / N / N / N/A
SNP SECURITY / GAURDING SERVICES / 4,700,000 / 20/06/2011 / 20/06/2014 / N / N / N/A
SOUTHERN CROSS COMPUTING PTY LTD / DEVELOPMENT OF THE IDENTITY AND ACCESS MANAGEMENT FRAMEWORK FOR THE NATIONAL SECURITY COMMUNITY / 160,000 / 13/01/2011 / 30/06/2011 / N / N / N/A
SOUTHERN CROSS COMPUTING PTY LTD / CONTRACTOR FOR SYSTEM ARCHITECTURAL SERVICES / 729,995 / 21/11/2009 / 30/06/2012 / N / N / N/A
SOUTHERN CROSS COMPUTING PTY LTD / SENIOR TEST ANALYST SERVICES / 455,000 / 1/03/2010 / 30/03/2012 / N / N / N/A
SOUTHERN CROSS COMPUTING PTY LTD / APPLICATIONS DEVELOPMENT SERVICES / 192,610 / 1/07/2011 / 30/06/2012 / N / N / N/A
SOUTHERN CROSS COMPUTING PTY LTD / PROVISION OF TEST MANAGEMENT SERVICES / 127,710 / 6/12/2011 / 6/12/2012 / N / N / N/A
SOUTHERN CROSS COMPUTING PTY LTD / CONTRACTOR SERVICES FOR IT DEVELOPMENT OF CENTRAL BUDGET MANAGEMENT SYSTEM / 621,333 / 4/01/2010 / 30/06/2012 / N / N / N/A
SOUTHERN CROSS COMPUTING PTY LTD / CONTRACTOR SERVICES FOR SAP DEVELOPMENT / 129,888 / 8/08/2011 / 30/06/2012 / N / N / N/A
SOUTHERN CROSS COMPUTING PTY LTD / CONTRACTOR SERVICES FOR SAP REMEDIATION PROJECT / 480,128 / 17/12/2009 / 30/06/2012 / N / N / N/A
SOUTHERN CROSS COMPUTING PTY LTD / SAP CONTRACTOR SERVICE FOR BUSINESS WAREHOUSE SUPPORT / 421,344 / 27/09/2010 / 30/06/2012 / N / N / N/A
SOUTHERN CROSS COMPUTING PTY LTD / SERVICES OF AN IT PROJECT MANAGER / 251,520 / 1/07/2011 / 30/06/2012 / N / N / N/A
SOUTHERN CROSS COMPUTING PTY LTD / SERVICES OF AN IT SYSTEM ARCHITECT / 222,992 / 4/10/2011 / 29/06/2012 / N / N / N/A
SOUTHERN CROSS COMPUTING PTY LTD / STRATEGIC ADVICE ON GOVERNANCE ISSUES / 210,000 / 4/12/2010 / 30/06/2012 / N / N / N/A
ST HILLIERS CONTRACTING PTY LTD / MANAGING CONTRACTOR FOR THE ROYAL AUSTRALIAN MINT / 65,999,623 / 25/09/2006 / 31/12/2012 / N / N / N/A
STEPHEN SKEHILL / ENGAGMENT OF CONTRACTOR / 110,000 / 12/08/2011 / 15/12/2011 / N / Y / PUBLIC INTEREST
STEWART AND HEATON CLOTHING CO / DRIVING OPERATIONS UNIFORM STOCK / 306,145 / 1/09/2008 / 31/08/2012 / N / N / N/A
SUPERRATINGS PTY LTD / BUSINESS ADVICE TO ASSIST WITH THE TENDER AND OUTSOURCING OF THE ADMINISTRATION OF PUBLIC SECTOR SUPERANNUATION ACCUMULATION PLAN / 140,774 / 2/06/2010 / 28/02/2012 / N / N / N/A
SYDNEY HARBOUR FEDERATION TRUST / SITE REMEDIATION WORKS / 152,305 / 1/12/2010 / 31/12/2011 / N / N / N/A
TECHPOINT CONSULTING / IMPLEMENTATION ADVISORY SERVICES FOR THE CENTRAL BUDGET MANAGEMENT SYSTEM REDEVELOPMENT PROJECT / 341,754 / 5/04/2011 / 23/12/2011 / N / N / N/A
TELSTRA AUSTRALIA / MOBILE AND DATA CARRIAGE / 1,069,200 / 13/05/2011 / 12/05/2013 / N / N / N/A
TELSTRA AUSTRALIA / FINANCE MOBILE VOICE / 214,500 / 1/05/2011 / 30/04/2013 / N / N / N/A
TELSTRA AUSTRALIA / MOBILE AND DATA CARDS / 260,500 / 1/05/2011 / 30/04/2013 / N / N / N/A
TELSTRA CORPORATION LIMITED / SUB-LEASE OF LAND AT FOOTSCRAY FOR TELECOMMUNICATIONS PURPOSES / 401,570 / 1/07/1964 / 30/06/2063 / N / N / N/A
THINK PLACE TRUST / CONSULTANCY SERVICES FOR ANALYSIS AND REVIEW OF AUSTRALIAN GOVERNMENT PROCESSES AND PROCEDURES / 166,115 / 30/03/2011 / 8/06/2011 / N / N / N/A
TIBCO SOFTWARE B.V. / CONSULTANCY SERVICES FOR SOFTWARE EVALUATION / 132,000 / 25/10/2011 / 23/12/2011 / N / N / N/A
TINNEY & ASSOCIATES PTY LTD / CONSULTANCY SERVICES FOR THE INDEPENDENT COMMUNICATIONS COMMITTEE / 231,000 / 25/10/2010 / 24/03/2012 / N / N / N/A
TRANSACT CAPITAL COMMUNICATIONS PTY LTD / INTERNET BASED CONNECTION SERVICES FOR ATTORNEY –GENERAL’S DEPARTMENT / 239,040 / 1/12/2011 / 1/12/2012 / Y / N / COSTING/ PROFIT INFORMATION
TRANSPORT INDUSTRIES SKILLS CENTRE / MOTOR VEHICLE TRAINING FOR DRIVING STAFF / 235,080 / 27/04/2011 / 30/09/2012 / N / N / N/A
UCI PROJECTS PTY LTD / FITOUT OF BUILDING FOR INTRA GOVERNMENT COMMUNICATIONS NETWORK / 181,500 / 10/02/2011 / 1/05/2011 / N / N / N/A
UNIFY SOLUTIONS PTY LTD / SUPPORT SERVICES AGREEMENT FOR IDENTITY MANAGEMENT SYSTEM / 317,000 / 1/08/2011 / 30/06/2012 / N / N / N/A
UNITED GROUP SERVICES / PROPERTY OPERATING EXPENSES - RENT NATIONAL OFFICE / 275,000 / 1/07/2010 / 30/06/2012 / N / N / N/A
UNITED GROUP SERVICES / RENT COSTS / 16,960,616 / 30/10/2008 / 30/06/2012 / N / N / N/A
UNITED GROUP SERVICES / PROPERTY MANAGEMENT SERVICES / 3,709,920 / 1/02/2010 / 31/01/2013 / N / N / N/A
UNITED GROUP SERVICES / PROPERTY MANAGEMENT SERVICES / 118,211,510 / 1/05/2006 / 31/12/2012 / N / N / N/A
UNITED GROUP SERVICES / PROPERTY OPERATING EXPENSES - RENTAL COSTS / 2,985,000 / 1/07/2010 / 30/06/2012 / N / N / N/A
UNITED GROUP SERVICES / PROPERTY OPERATING EXPENSES FOR PASS THRUS / 120,000 / 1/07/2010 / 30/06/2012 / N / N / N/A
UNITED GROUP SERVICES / PROPERTY OPERATING EXPENSES FOR PASS THRUS / 405,000 / 1/07/2010 / 30/06/2012 / N / N / N/A
UNITED GROUP SERVICES / PROPERTY OPERATING EXPENSES FOR RECURRING PASS THRUS / 355,000 / 1/07/2010 / 30/06/2012 / N / N / N/A
UNITED GROUP SERVICES / RENT COSTS / 45,683,747 / 30/10/2008 / 4/09/2016 / N / N / N/A
UNITED GROUP SERVICES / RENT COSTS / 573,924 / 1/07/2010 / 30/06/2012 / N / N / N/A
UXC CONNECT PTY LTD / IT DATA NETWORK DESIGN AND UPGRADE SERVICES / 2,200,000 / 5/08/2011 / 4/08/2014 / N / N / N/A
VERIZON / PLANNING AND RESEARCH OF THE NATIONAL SECURITY COMMUNITY PHYSICAL ACCESS CONTROL PILOT PROJECT / 154,000 / 24/01/2011 / 30/09/2011 / N / N / N/A
VERIZON / ICT SERVICES / 171,416 / 11/11/2011 / 1/04/2012 / N / N / N/A
VERIZON / MANAGED IT SERVICES / 498,000 / 30/09/2011 / 29/09/2013 / Y / Y / OTHER /IT SECURITY,COSTING/ PROFIT INFORMATION,INTELLECTUAL PROPERTY
VEROSSITY / CONTRACTOR SERVICES FOR COMPUTER SUPPORT / 775,149 / 14/11/2009 / 30/06/2012 / N / N / N/A
ZALLCOM PTY LTD / ADOBE LIVE CYCLE LICENSING WITH MAINTANANCE AND SUPPORT / 122,760 / 1/07/2011 / 30/06/2012 / N / N / N/A
ZALLCOM PTY LTD / CONSOLIDATED VMWARE LONIX SOFTWARE AND MAINTENANCE / 274,773 / 1/07/2010 / 30/06/2013 / N / N / N/A
ZALLCOM PTY LTD / RENEWAL OF IBM SOFTWARE MAINTENANCE FOR TIVOLI STORAGE MANAGER / 112,854 / 1/07/2011 / 30/06/2012 / N / N / N/A
ZALLCOM PTY LTD / RENEWAL OF LICENCE FOR SYMANTEC PROTECTION SUITE / 237,184 / 1/08/2009 / 31/07/2012 / N / N / N/A
ZALLCOM PTY LTD / VMWARE CAPPED ADD ON TO ELA / 403,561 / 1/07/2011 / 30/06/2013 / N / N / N/A

Estimated cost of complying with this Order: $7410.14