SUB: - Application for the Post of Sr Mechanical Project/Site Engineer

SUB: - Application for the Post of Sr Mechanical Project/Site Engineer

MAHESHP

Kannamparambil (H), Kalladikode, Palakkad, Kerala,India,Pin: 678596, Phone: +91-9746717719, mail:

Objective

Attitude and Dedication is what required in carrying out any task given to you at any point of time. I believe in this principle and try to walk around keeping this in mind always. I have been in construction industry for the last 8.5 years and would want to establish myself with it and hence seeking a suitable position where I could be a part in the organization’s growth along with mine.

Employment Profile

Summary:I worked with M/sBilfinger Neo Structo Pvt.Ltd formerly known as Neo Structo Construction Limited (From March 2009 to July 2016) as a Project Planning Engineer ( I worked with M/s BEE AAR Enterprises (From February 2008 to January 2009) as a Site Engineer.

Total Work Experience: 8 Years and 6 Months

Key Skills:Project Planning, Scheduling, Progress Monitoring, Requirements Analysis, Project coordinationImplementation, Quantity Estimation, Scope detailing of Projects, Budgeting, Invoicing of client as well as sub contractor, Materials Management, Cost Management, Construction Documentation.

Area of Experience: Refineries (Piping, Equipments, Tanks, Heaters), Power Plants (CHP and BOP).

Education

MBA in Project Management - Sikkim Manipal University (June 2012 to April 2014)

B.Tech in Mechanical Engineering - Calicut University (June 2003 to June 2007).

Professional Experience

Bilfinger Neo Structo Private Limited, Surat, Gujrat,From March 2009 to July 2016.

Bilfinger Neo Structo Private Limited formerly known as Neo Structo Construction Limited is an ISO 9001:2008 Accredited Mechanical Engineering Company, specialized in the field of Construction of Refineries, Petrochemicals, Fertilizers, Steel & Metallurgical, Chemical, Oil & Gas, Power, Cryogenic and other core industries for the last 30 years. Iworked as a Planning Engineer for Bilfinger Neo Structo Private Limited in their various projects detailed as under:

Project : Integrated Refinery Expansion Project (IREP), Kochi.(From June.2014 to July.2016)

Owner : Bharat Petroleum Corporation Limited.

Client : Heurtey Petrochem SA

Job : Erection works of DCU Heaters

Role : Planning Engineer

Responsibilities:

1. Detailing of scope from drawings

2. Project Planning and scheduling

3. Progress Tracking and monitoring

4. Progress review and creating strategic back up plans

5. Analysis of productivity

6.Budgeting for the project

7. Forecasting of the monthly volume

8. Comparison of the generated and forecasted volumes and preventive actions for variances if any

9. Generation of invoices for executed works

10. Verification of sub contractor invoices

11. Materials management including material reconciliation

12. Make proposals for work order amendment for increase/ decrease of scope.

Scope:

Erection works of Delayed Coker Unit (DCU) Heaters includes the installation radiant as well as convection section of heaters, flare stack, Ducts,Steam Super heaters andAPH system including its supporting structures, FD fan and ID fan. Scope includesaround 4000 MT steel structure erection, 450 MT equipment erections and 1500 ID piping installation.

Highlights:

The heaters in DCU heat the heavy liquid material from the bottom of fractionators to about 482 0C to 507 0C. This heating will cause the heavy liquid material to crack or change into a combination of smaller molecule gas and liquid products. Steam is injected to minimize the cracking until it reaches the coke drum.

Project : 6x600 MW Thermal Power Project, Nariyara, Chattisgarh. (From October 2011 to May 2014)

Owner : KSK Mahanadhi Power Company Limited.

Client : SEPCO Electric Power Construction Corporation.

Job : Erection works of CHP and BOP.

Role : Planning Engineer

Responsibilities:

1. Detailing of scope

2. Project Planning and scheduling

3. Progress Tracking and monitoring

4. Progress review and creating strategic back up plans

5. Analysis of productivity

6. Budgeting

7. Forecasting of the monthly volume

8. Preparation of invoices for executed works

9. Materials management including material reconciliation

10. Verification of sub contractor invoices

11. Estimation, Bidding and contract negotiations

Scope:

Erection works of Coal Handling System including the conveyor supporting structures and conveyors up to Main Power house and all rear of boiler structures like repair racks of ID fans, repair racks of FD fans, rack of gas ducts, piping and equipment installation of Turbine Island and Ash Handling plant. It includes more than 25000 MT steel structure erections, 2000 MT piping erection and 1000 MT equipment erection.

Highlights:

This 6X600 MW Power Project at Nariyara, Chattisgarh belongs to KSK group of companies situated at Hyderabad which is being executed by SEPCO, a Chinese Power Construction Company as the main EPC for this Project. Out of the Six Units, Unit #3 and Unit #4 have been commissioned and others are planned for commissioning by the end of the year 2014.

Project : Capacity Expansion cum Modernization Project (CEMP) Phase II, Kochi.(From Sept.2010 to Aug.2011)

Owner : Bharat Petroleum Corporation Limited.

Client : Callidus Technologies

Job : Installationof Incinerator package

Role : Planning Engineer

Responsibilities:

1. Analyzing various Engineering drawings/documents and subsequently evaluating the scope

2. Project Planning and scheduling

3. Progress Tracking and monitoring

4. Preparation of progress reports

5. Attending progress review meetings and creating back up plans if any deviation from schedule occurs

6. Materials management

7. Preparation of invoices for executed works

8. Verification of sub contractor invoices

9. Documentation

Scope:

Erection of Incinerator Package consists of Thermal Oxidizer, Incinerator and Stack with all connection piping, instrumentation and insulation.

Highlights:

The purpose of incinerator package is to burn the tail gas from MCRC section and ensure a maximum H2S concentration of 10 PPM in the emissions to atmosphere. The equipment’s had to be fire protected and a firebrick lining and refractory had to be applied inside the equipment’s.

Project : Capacity Expansion cum Modernization Project (CEMP) Phase II, Kochi. (From March 2009 to Sept 2011)

Client : Bharat Petroleum Corporation Limited.

Consultant : Engineers India Limited

Job : Mechanical works of Sulphur Recovery Unit

Role : Planning Engineer

Responsibilities:

1. Analyzing various Engineering drawings/documents and subsequently evaluating the scope

2. Project Planning and scheduling

3. Progress Tracking and monitoring

4. Preparation of progress reports

5. Attending progress review meetings

6. Materials management

7. Preparation of invoices for executed works

8. Verification of sub contractor invoices

9. Documentation

Scope:

Fabrication and Erection of Piping and Equipment’s Installation (Stripper, Air Coolers, Catalytic Convertor etc) of Sulphur Recovery Unit(SRU) in accordance with the drawing. It consists of more than 100000 inch diameter piping fabrication and 110000 inch meter piping erection.

Highlights:

CEMP Phase II facilities have been set up to supply EURO III/IV equivalent MS& HSD. Sulphur block consists of three units namely Sour Water Stripper (SWS) unit of 17.2 m3/hr capacity, Amine Regeneration Unit (ARU) of 130 MT/hr capacitiesand a Sulphur Recovery Unit of capacity 80 TPD. The piping involved in this unit was jacketed. This is a special type of piping used in Sulphur recovery units where two Pipes are placed co-axially. The inner Pipe is called CORE and has a smaller diameter and the outer pipe is called Jacket

BEE AAR Enterprises,Jamnagar,Gujrat, From February 2008 to January 2009.

BEE AAR Enterprises is a Mechanical Construction Company, specialized in the field of Construction of Refineries, Steel plants, Power plants etc.

Project : Jamnagar Export Refinery Project (JERP)

Owner : Reliance Industries Limited

Consultant : Reliance Engineers Association Limited.

Job : Piping works of HMU (Hydrogen manufacturing Unit)

Role : Site Engineer.

Responsibilities:

1. Study of the fabrication drawings

2. Preparation of MTO

3. Execution of the piping fabrication as per drawings

4. Preparation of progress reports

5. Monitoring of productivity and take productivity improvement measures

6. Materials management

7. Client Billing

8. Documentation

Scope

Piping fabrication and erection of Hydrogen manufacturing unit in accordance with the client provided drawings.

Highlights:

The Piping works include around3000 inch diameter fabrication and 5000 inch meter erection of alloy steel, Stainless Steeland Carbon Steel Piping.

Computer Skills

MS Project,Primavera P6, MS Office and Auto CAD

Languages Known

English : Read, Write & Speak

Hindi : Read, Write & Speak

Malayalam:Read, Write & Speak

Other Details

Current Salary : 900 USD/month

Expected Salary: 2000 USD/month

Personal Details

Date of Birth : 10.06.1985

Gender : Male

Marital Status : Married

Passport no : P4129099

Passport expiry : 01-11-2026