1

Français

ontario regulation 199/15

made under the

Education Act

Made: June 17, 2015
Filed: July 10, 2015
Published on e-Laws: July 10, 2015
Printed in The Ontario Gazette: July 25, 2015

Amending O. Reg. 76/14

(GRANTS FOR STUDENT NEEDS - LEGISLATIVE GRANTS FOR THE 2014-2015 SCHOOL BOARD FISCAL YEAR)

1.Subsection 3 (10) of Ontario Regulation 76/14 is amended by striking out “revised March 2014” and substituting “revised April 2015”.

2.Paragraphs 1 and 2 of subsection 15 (2) of the Regulation are amended by striking out “under section 257.11”wherever it appears and substituting in each case “under subsection 257.11 (14) or (15)”.

3.The definition of “School Foundation Allocation Table” in subsection 17 (2) of the Regulation is amended by striking out “revised March 2014” and substituting “revised April 2015”.

4.Paragraph 3 of section 18 of the Regulation is amended by striking out “under section 21” at the end and substituting “under subsection 21 (1)”.

5.Section 21 of the Regulation is revoked and the following substituted:

High needs amount

21.(1)The high needs amount for a board is determined as follows:

1.Multiply the 2014-2015 day school average daily enrolment of pupils of the board by the product of 0.75 and the amount set out in Column 2 of Table 1 oppositethe name of the board.

2.Add the amount determined under paragraph 1 to the projected measures of variability amount set out in Column 3 of Table 1 opposite the name of the board.

3.Add the amount determined under paragraph 2 to the projected special education statistical prediction model amount set out in Column 4 of Table 1 opposite the name of the board.

4.Add the amount determined under paragraph 3 to the high needs base amount for collaboration and integration, $450,000.

(2)For the 2014-2015 fiscal year, the total provincial funding for all 72 boards for the high needs amount is $1,050,000.

6.(1)Paragraph 2 of subsection 36 (3) of the Regulation is amended by striking out “paragraph 22” and substituting “paragraph 25”.

(2)Paragraph 3 of subsection 36 (5) of the Regulation is amended by striking out “paragraph 22” and substituting “paragraph 25”.

7.(1)Paragraph 1 of section 56 of the Regulation is amended by striking out “under paragraph 3” and substituting “under paragraph 3.1”.

(2)Paragraph 3.1 of section 56 of the Regulation is revoked and the following substituted:

3.1Add the amount determined under paragraph 3 to the amount or, if there is more than one amount for a board, the total of the amounts, set out in Column 4 of Table 25.2 opposite the name of the board.

8.(1)Paragraph 1 of section 57 of the Regulation is amended by striking out “under paragraph 3” and substituting “under paragraph 3.1”.

(2)Paragraph 3.1 of section 57 of the Regulationis revoked and the following substituted:

3.1Add the amount determined under paragraph 3 to the amount or, if there is more than one amount for a board, the total of the amounts, set out in Column 4 of Table 25.3 opposite the name of the board.

9.Paragraph 9 of subsection 58 (1) of the Regulation is amended by striking out “under paragraph 16” at the end and substituting “under paragraph 21”.

10.Subsections 64 (4) and (5) of the Regulation are amended by striking out “under section 257.11” wherever it appears and substituting “under subsection 257.11 (14) or (15)” in each case.

11.Tables 25.2 and 25.3 of the Regulation arerevoked and the following substituted:

Table 25.2
Amount for Capital Priority Projects

Item / Column 1
Name of board / Column 2
Municipality or locality / Column 3
Project description / Column 4
Amount per project, in dollars
1. / Algoma District School Board / Town of Bruce Mines / Demolition of former Arthur Henderson PS Annex / 209,066
2. / Bluewater District School Board / Hanover / Replacement secondary school / 19,510,310
3. / Conseil des écoles catholiques du Centre-Est / Ottawa / Replacement of école élémentaire catholique Horizon-Jeunesse / 7,206,511
4. / Conseil scolaire catholique de district des Grandes Rivières / Hearst / Demolition of former Point de service de Hearst / 82,000
5. / Conseil scolaire Viamonde / Welland / Consolidation of école élémentaire publique Champlain and école secondaire publique Confédération / 10,289,341
6. / District School Board of Niagara / Fort Erie / Consolidation of three schools to formnew elementary school / 9,275,664
7. / District School Board of Niagara / Niagara-on-the-Lake / Addition to Crossroads Public School to accommodate consolidation of schools / 482,268
8. / District School Board Ontario North East / Smooth Rock Falls / Renovation of Smooth Rock Falls Public School to allow surplus space to be leased to municipality / 368,844
9. / District School Board Ontario North East / Temiskaming Shores / Renovation of Timiskaming District Secondary School to accommodate Grades 7 and 8 students and to renovate surplus space at New Liskeard Public School to be used for child care / 870,565
10. / Hamilton-Wentworth District School Board / Hamilton / Addition to Spencer Valley Public School to accommodate consolidation of schools / 2,026,142
11. / Hamilton-Wentworth District School Board / Hamilton / New elementary school to accommodate consolidation of two schools / 7,047,819
12. / Hamilton-Wentworth District School Board / Hamilton / Addition and renovation project at Franklin Road Public School in response to the Central Mountain Elementary Accommodation Review / 478,025
13. / Hamilton-Wentworth District School Board / Hamilton / Addition and renovation project at Pauline Johnson Public School in response to the Central Mountain Elementary Accommodation Review / 2,422,040
14. / Hamilton-Wentworth District School Board / Hamilton / Addition and renovation project at Ridgemount Public School in response to the Central Mountain Elementary Accommodation Review / 2,384,018
15. / Huron-Superior Catholic District School Board / Sault Ste. Marie / Renovation of St. Basil Catholic Secondary School to accommodate consolidation of four elementary schools / 3,320,030
16. / Near North District School Board / Parry Sound / New elementary and secondary school to accommodate consolidation of three schools / 26,461,567
17. / Near North District School Board / Burk’s Falls / Renovation of Land of Lakes Public School to accommodate consolidation of schools / 1,644,065
18. / Peel District School Board / Brampton / Partial demolition of Hickory Woods Public School / 750,000
19. / Peel District School Board / Caledon / Partial demolition of Caledon Central Public School / 1,000,000
20. / Renfrew County Catholic District School Board / Killaloe-Hagarty-Richards / Renovation of St. Andrew’s Catholic Elementary School to accommodate consolidation of schools / 582,983
21. / Renfrew County District School Board / Madawaska Valley / Renovation of Madawaska Valley District Secondary School to accommodate consolidation of schools / 2,838,493
22. / Renfrew County District School Board / Petawawa / Demolition of General Panet High School / 613,442
23. / Simcoe County District School Board / Barrie / Addition and renovation project at Barrie North Collegiate / 6,069,997
24. / Simcoe County District School Board / Midland / Replacement of Midland Secondary School / 27,331,797
25. / Thames Valley District School Board / London / Addition to Bishop Townshend Public School to accommodate consolidation of schools / 4,029,715
26. / Toronto District School Board / Toronto / Addition to George Webster Public School / 494,284
27. / Toronto District School Board / Toronto / Replacement of Avondale Public School / 462,800
28. / Waterloo Catholic District School Board / Kitchener / Partial demolition of St. Teresa Catholic Elementary School / 369,414
29. / Waterloo Catholic District School Board / Cambridge / Partial demolition of St. Peter Catholic Elementary School / 257,160
30. / Waterloo Catholic District School Board / Waterloo / Partial demolition of Holy Rosary Catholic Elementary School / 238,240

Table 25.3
Amount for Capital Priority Land Purchases

Item / Column 1
Name of board / Column 2
Municipality / Column 3
Project description / Column 4
Amount per project, in dollars
1. / Conseil des écoles catholiques du Centre-Est / Arnprior / Acquisition of land for a new school / 782,156
2. / Conseil scolaire Viamonde / Hamilton / Acquisition of land for a new school / 6,357,555
3. / Conseil scolaire Viamonde / Milton / Acquisition of land for a new school / 6,768,000
4. / Conseil scolaire catholique du Nouvel-Ontario / Blind River / Acquisition of land adjacent to école élémentaire catholique Saint-Joseph for its use / 50,000
5. / Conseil scolaire catholique Providence / Tecumseh / Acquisition of land adjacent to école élémentaire catholique Saint-Antoine for its use / 132,670
6. / Conseil scolaire catholique Providence / Amherstburg / Acquisition of land adjacent to école élémentaire catholique Saint-Jean-Baptiste for its use / 193,779
7. / Conseil scolaire de district catholique Centre-Sud / Milton / Acquisition of land for a new school / 7,855,430
8. / District School Board of Niagara / Fort Erie / Acquisition of land for a new secondary school / 2,100,000
9. / Greater Essex County District School Board / Leamington / Site preparation for Leamington District High School / 1,836,993
10. / London District Catholic School Board / London / Site preparation for St. John Catholic Elementary School / 106,177
11. / Niagara Catholic District School Board / Niagara-on-the-Lake / Acquisition of land adjacent to St. Michael Catholic Elementary School for its use / 15,560
12. / Simcoe County District School Board / Severn / Site preparation for a new elementary school (Ardtrea-Cumberland PS) / 1,544,494
13. / Simcoe County District School Board / Tay / Acquisition of land adjacent to Victoria Harbour Public School for its use / 82,680
14. / Thames Valley District School Board / London / Acquisition of land for a new school / 31,411
15. / Thames Valley District School Board / London / Acquisition of land for a new school / 2,376,475
16. / Upper Canada District School Board / Cornwall / Acquisition of land for a new school / 1,292,596
17. / Waterloo Catholic District School Board / Cambridge / Acquisition of land adjacent to St. Anne Catholic Elementary School for permanent school addition / 1,808,700
18. / Windsor-Essex Catholic District School Board / Windsor / Acquisition of land for a new school / 300,000

Commencement

12.This Regulation comes into force on the day it is filed.

Français

Back to top