BIOLOGICAL AGENT DETECTION CHECK SHEET (CONT’D)

UPDATE: Nov 2012

BIOLOGICAL AGENT DETECTION CHECK SHEET

USS ______

Date:______

REF:

a)  PMS as listed

b)  Tech Manual NAVSEA SS220-AC-MMA-010, Navy Dry Filter Unit

c)  AEL 2-770004354 for Biological Response Kit (Rev Date Jan 2012)

d)  AEL 2-770004241 and 2-770004251 (Rev Date Apr 2012) for CBR-D Detection Equipment

e)  AEL 2-770004201 and 2-770004202 (Rev Date Apr 2012) for CBR-D Deployment Consumable items

f)  Tech Manual NAVSEA SS220-AB-MMA-010 Detection System, Biological Agent, Joint Point, Ship M98

BIOLOGICAL WARFARE DETECTORS

Note: Codes can be obtained from secure access at the below listed address. Ref CENTCOM message 190753Z APR 03 SUBJ: BIOLOGICAL WARFARE AGENT DETECTION AND ANALYSIS GUIDANCE (U)

www.centcom.smil.mil/cdi/files/Msgs_of_Interest/txt/2003/20030421_Bio_Detection.text

1. Dry Filter Unit (DFU): / IAW / S/U
a. Are the required number of DFUs with accessories on board per class? / Ref (d)
1.  Inlet Stack Filter Manifold (1) / Ref (b)
2.  Filter cartridges (4)
3.  Power Cord (1)
4.  Attached inlet cover (1)
b. HHA Immuno-assay detectors will be provided by the CBR RAV Team / Ref (c,e)
c. Training HHA Immuno-assay detectors will be provided by the CBR RAV Team / Ref (d)
d. Is dedicated refrigerator onboard, designated and labeled “FOR STOWAGE OF BIO CONSUMABLES ONLY”? / Ref (e)
e. Is refrigerator electrically safety checked?
f. DFU sampling kits will be provided by the CBR RAV Team / Ref (e)
g. Are DFU Power Cords safety checked?
h. Does the DFU vacuum work if plugged in and tested?
i. Contents of BRK as follows: / Ref (c)
1.  Bag, Kit Flyers / 1 ea
2.  Shipper, SAF-T-PAK 100 / 2 ea
3.  Sample container with spoon / 5 ea
4.  Logbook / 1 ea
5.  Scissors, Bandage / 1 ea
6.  Stopwatch / 1 ea
7.  Bag, Sealable, Plastic 10” x 10” / 20 ea
8.  Bag, Sealable, Plastic 2 Gallon / 20 ea
9.  Swab, Dacron Tip, Wood shaft, Sterile / 50 ea (25 packs of 2)
10.  Pipette, Transfer Large / 5 ea (1 PG)
11.  Tape, Transparent Roll / 1 ea
12.  HYPE Wipes (Towelette) / 10 ea (1 PG)
13.  Under pad, Absorbent / 20 ea
14.  Labels, Blank, Specimen / 50 ea
15.  Labels, Danger Aircraft / 2 ea
16.  Labels, Class 6.2 Infectious Substance / 2 ea
17.  Label, Over pack / 2 ea
18.  Dangerous Goods Declaration / 6 ea
19.  Chain of Custody Form OPNAV 5580/22 / 6 ea
20.  HHA Report Form / 6 ea
IAW / S/U
2. JOINT BIOLOGICAL POINT DETECTION SYSTEM (JBPDS) / 6641/054
a. JBPDS External Components:
Note: When system is not operational intake caps shall be installed in lieu of intake stacks / 2M-1
1. Verify intake stacks are clean, dry and can be easily removed (not frozen in place). Note: This may require an aloft chit
NOTE: This requires an aloft chit on DDG platforms. / 2M-1
2 Verify impact cup for the Collector intake is clean and in place.
Note: This requires an aloft chit on DDG platforms. / 2M-1
3. Verify Intake stack caps are clean, dry and can be easily removed (not frozen in place). Note: This may require an aloft chit.
b. JBPDS Reference Card and Filters:
1. Verify Reference Card is clean and installed. / A-1
2. Verify dates that the following components were replaced:
.A. Coalescing Filter / A-1
B. Carbon Filter / A-1
C. Particle Filter / A-1

c. JBPDS Carrier Box Assemblies (CBA) & Refrigerator Verification

1. Verify training CBAs (AEL requirements 2ea.).

NOTE: Expired CBAs can be used for maintenance actions only.

2. Verify refrigerator is operational/used is only for Carrier Cards and HHAs

d. BBSU Setup:

1. Visually inspect BBSU exterior for damage. / 2M-1
2. Visually inspect LCS for damage / smudges. / 2M-1
3. Open BBSU doors and visually inspect all components and connections. / 2M-1
4. Visually inspect internal components for:
Fluid leaks
Air leaks
Tight Connections / Ref (f)
5. Inspect FTS shrouds for broken needles. / Ref (f)
e. Test Operate JBPDS:
1. Test operate JBPDS in accordance with PMS.
Verify all components are operational.
Verify Time/Location/Weather feed.
Verify BAWS Elastic PHD ______(should be less than 1200) / 2M-1
2. Verify Reference Card threshold values (gain values) for all 10 strips on the reference carrier are between 45 and 105. / 2M-1
3. Test operate local BBSU alarm. / 2M-1
4. Test operate ship’s chemical alarm. / 2M-1
5. Verify communication with External Controller Subsystem (ECS) (CIC and DCC). / 2M-1
6. Verify Dry Collection Filter Adapter is operational / Ref (f)
f. Visually Inspect External Controller Subsystem (ECS). NOTE: JBPDS installations after OCT 2008 have one ECS located in CCS/DCC. Earlier installations may contain an additional ECS located in CIC.
1. Inspect for damage and operability. / 2M-1
REMARKS: /

Assessor(s):

Page 2 of 2