STATE OF NEW HAMPSHIRE
DEPARTMENT OF ADMINISTRATIVE SERVICES
BIDS WERE OPENED ON THE 25TH DAY OF OCTOBER, 2012 FOR TOBEY BUILDING RENOVATIONS AND PARKING DECK, NEW HAMPSHIRE HOSPITAL CAMPUS, CONCORD, NH PROJECT NO.: 80609R CONTRACT D COMPLETION DATE: DECEMBER 29, 2013
A. B. C.
ITEM NO. ITEM QUANTITIES UNIT TOTAL UNIT TOTAL UNIT TOTAL
1 / COMPLETE RENOVATION OF TOBEY BLDG. & CONSTRUCTION OF PARKING DECK / 1 UNIT / $16,255, 000.00 / $16,255,000.00 / $16,833,297.00 / $16,833,297.00 / $16,839,620.00 / $16,839,620.002 / OPEN ROCK EXCAVATION AS PER NH ROAD & BRIDGE SPECS. IF NONE FOUND, A CREDIT WILL BE GIVEN TO PROJECT / 50 CUBIC YARDS / $22.00 / $1,100.00 / $20.00 / $1,000.00 / $82.00 / $4,100.00
3 / ROCK STRUCTURE EXCAVATION AS PER NH ROAD & BRIDGE SPECS. IF NONE FOUND, CREDIT WILL BE GIVEN TO PROJECT / 50 CUBIC YARDS / $42.00 / $2,100.00 / $40.00 / $2,000.00 / $165.00 / $8,250.00
4 / UNSUITABLE SOIL EXCAVATION AS PER NH ROAD & BRIDGE SPECS. IF NONE FOUND, A CREDIT WILL BE GIVEN TO PROJECT / 75 CUBIC YARDS / $104.00 / $7,800.00 / $20.00 / $1,500.00 / $33.00 / $2,475.00
5 / ALLOWANCE #1 FOR MATERIALS TESTING AS REQUIRED FOR CONCRETE, SOILS, PAVEMENT & OTHER MISC. SITE RELATED WORK / 1 ALLOW-
ANCE / $60,000.00 / $60,000.00 / $60,000.00 / $60,000.00 / $60,000.00 / $60,000.00
6 / ALLOWANCE #2 FOR VIDEO & SECURITY SURVEILLANCE EQUIPMENT & INSTALLATION / 1 ALLOW-
ANCE / $50,000.00 / $50,000.00 / $50,000.00 / $50,000.00 / $50,000.00 / $50,000.00
7 / ALLOWANCE #3 FOR SECURITY ACCESS SYSTEM PURCHASE & INSTALL / 1 ALLOW-
ANCE / $58,000.00 / $58,000.00 / $58,000.00 / $58,000.00 / $58,000.00 / $58,000.00
8 / ALLOWANCE #4 FOR STORAGE RETRIEVAL SYSTEM PURCHASE & INSTALL / 1 ALLOW-
ANCE / $55,000.00 / $55,000.00 / $55,000.00 / $55,000.00 / $55,000.00 / $55,000.00
9 / ALLOWANCE #5 OWNER INITIATED CHANGES AND UNANTICIPATED HAZARDOUS MATERIAL ABATEMENT / 1 ALLOW-
ANCE / $275,000.00 / $275,000.00 / $275,000.00 / $275,000.00 / $275,000.00 / $275,000.00
10 / ALLOWANCE #6 FOR UTILITY SERVICE CHARGES / 1 ALLOW-ANCE / $35,000.00 / $35,000.00 / $35,000.00 / $35,000.00 / $35,000.00 / $35,000.00
BASE BID LUMP SUM FOR ITEMS 1 THROUGH 10 / $16,799,000.00 / $17,370,797.00 / $17,387,445.00
ALTERNATE NO. 1 DEDUCT: ($606,800.00) ($660,000.00) ($610,000.00)
ALTERNATE NO. 2 DEDUCT: ($7,200.00) ($7,200.00) ($6,800.00)
ALTERNATE NO. 3 DEDUCT: ($55,500.00) ($46,000.00) ($40,000.00)
A. HARVEY CONSTRUCTION, 10 HARVEY ROAD, BEDFORD, NH 03110
B. THE MACMILLIN COMPANY, LLC, 17 ELM STREET, KEENE, NH 03431
C. TRUMBULL-NELSON CONSTRUCTION COMPANY, INC., 200 LEBANON STREET, HANOVER, NH 03755
D. NORTH BRANCH CONSTRUCTION, INC., 76 OLD TURNPIKE ROAD, CONCORD, NH 03301 $17,470,000.00
E. MERIDIAN CONSTRUCTION CORPORATION, 32 ARTISAN COURT, UNIT #4, GILFORD, NH 03249 $17,900,750.00
F. HUTTER CONSTRUCTION CORPORATION, PO BOX 257, 810 TURNPIKE ROAD, NEW IPSWICH, NH 03071 $19,270,000.00