Competencies

Full SPE Competencies Surpassed beyond to Leading Edge Competencies (attachment)

Skills & Experience

Engineering

Operations

Operations Supervision

Drilling Site Management

Team Leadership

Consensus Building

Team Building

Teaching/Mentoring

Technical Authority Management

Due Diligence

Due Process

Team Communications

Engineering Software Utility

Engineering Software Development

Drilling Geomechanics

Wellbore Stability

Trajectory Design

Drilling Faults

Drilling Salt

Trouble Formations

Induced Fracturing

Circumferential Strength

Drilling Hydrostatics

Drilling Thermostatics

Drilling Thermodynamics

Drilling Thermoelasticity

Casing Design

Casing Setting Depth Design Based on Geomechanics (wrote paper) and Kick Tolerances linked to rig appropriated kick detection assessments, PI and operational Kick Vulnerabilities

Thermal Drilling Casing Design

Thermal Completion Casing Design

Thermal Production Testing Design

Casing Design

Basic

Advanced

Thermal

Deepwater and Special High Risk HTHP Projects

Special Kick Loads Design

H2S & CO2

Worst Case Discharge

Well Containment Plans

Related Training

Compass Team Work Training

Team Lead –Engineering Leadership

eColors training

engineering presentations

Well Control

Casing Design

Stress Check

WellCat

TDAS

Drill Science

Directional Drilling

ERD – K&M Technology Course

Trajectory Design – Reservoir Geomechanics

Drill String Design

T. H. Hill Courses

Thorough understanding of federal regulations 30CFR250 B, C, D, E & F, API Docs relative to well planning: RP 2SK, 10B3, B4, D2, 53, 65, 90, 96. Spec6A, 10D, 16A, 16D, benchmarking systems, nodal analysis software to calculate WCD's and their use in well design from planning, drilling through completion and production life.

Related Value

Directional Software (developed and owned by Drill Science)

Geomechanics Software (developed and owned by Drill Science)

Hydraulics Software (developed and owned by Drill Science)

Managerial:

Build intelligent teams, implement synergistic team work & productivity enhancing leadership through a growth mindset. Focus on drilling process & personal safety and performance excellence & Drilling Process Improvement within the framework of a just & learning, multidisciplinary team.

Project management of:

Onsite well construction teams.

Well constructon engineering teams.

Contract administration of well construction teams.

Regulatory teams.

Personal:

Petroleum Engineering.

Drilling Engineering in house and onsite supervision.

Diligent, meticulous and thorough risk assessments mitigated in design process.

Human-centric, collaborative, integrated and unified, adaptive linear design philosophy

Drilling geomechanics.

Cost estimation (AFE)

Managing components of consequence that exist before drilling risk is ever born within tolerances during well delivery

Competency assessment and coaching

Reliability assessment and coaching in interactively complex and tightly coupled processes

Annual Budget Development.

Working with GnG teams.

Researching and implementing new technologies.

Contributing to Petroleum Engineering Discussion Groups.

Developing emerging technologies.

Supplementing core competenicies with further study via professional technical papers and conferences.

Technical Editor for the SPE Peer Review Committee.

SME - IADC Drilling Manual 12th Ed

Papers written

Drilling Geomechanics - Pre-Drill Fracture Centroid Perspective Is Key To Spot Casing Setting Depths and Trajectories At High Risk For Ballooning

Click to edit publication or publisher nameDrill Science Corporation

Click to edit publication dateDecember 28, 2011

Click to edit publication descriptionEngages the reader in a discussion on geomechanics as it relates to the drilling aspects of a project. Involves details of the causes and method of predicting ballooning situations from stress states deciphered from seismic strain indicators and geologically developed pressure chambers.

Click to edit publication titleConsiderations for a Successful Wellbore Trajectory Design

Click to edit publication or publisher nameDrill Science Corporation

Click to edit publication dateJanuary 30, 2011

Click to edit publication titleBest Practices for HTHP Gas Well Production Casing Cementing

Click to edit publication or publisher nameDrill Science Corporation

Click to edit publication dateApril 10, 2007

Click to edit publication descriptionTried and true designs, methods and precautions for obtaining excellent cement bonds on production casing in HTHP gas wells.

Click to edit publication titleBest Practices for Avoiding Differential Sticking While Drilling Depleted Sands

Click to edit publication or publisher nameDrill Science Corporation

Click to edit publication dateSeptember 15, 2011

Click to edit publication titleBest Practices in Selecting Casing Setting Depths and Common Design Pitfalls

Click to edit publication or publisher namesubmitted to SPE November 3, 2011 and currently being peer reviewed

Click to edit publication dateNovember 3, 2011

Click to edit publication titleBasis Change Enables Better Fracture Pressure Prediction Via Only Seismic Data

Click to edit publication or publisher namesubmitted to SPE for publication and currently being peer reviewed

Click to edit publication dateNovember 4, 2011

Click to edit publication descriptionTo be submitted once the paper is published.

Click to edit publication titleDrilling Geomechanics - Pre-Drill Fracture Centroid Perspective Is Key To Design Pressure Balanced Open Hole Intervals And Avoid Costly Imbalances

Click to edit publication or publisher nameSubmitted to SPE for publication and currently pending a peer review process

Click to edit publication dateDecember 25, 2011

Click to edit publication titleDrilling Engineering Editorial Review

Click to edit publication or publisher nameIADC Drilling Manual, 12th Edition

Click to edit publication date