PROPOSAL REVIEW CHECKLIST

(For Federal [US Department of Education] Submissions)

Principal Investigator: Department: Budget Max:

Sponsor:

Due Date:Submittal System:

Internal Requirements

Advance Notice Proposal Information Form:____Yes____No

Electronic Internal Processing Form (eIPF):______

____Submitted____Yes____No

____Project dates: ______

____Enter budget information

____Enter all personnel, includingconsultants

____Upload Attachments:

____Internal Budget

____Budget Narrative

____Proposal Guidelines

____Is tuition waiver needed? ____Yes____No

____Send email for tuition waiver

____Signatures Obtained? ______

____PI Certified: ______

____Move eIPF from COED to Research Services

Formatting Requirements

____Double Space____Single Space

____Font Size: ______Font Type: ______

(ED only allows: Times New Roman, Courier, Courier

Newor Arial in 12 point or larger.)

____Margins: ______Page Limitation:______

____Single or Collaborative Submission:______

Document Requirements

____Cover Page/Face Page

____Project Summary/Abstract(Page/Word Limitation):______

____ED Abstract Form (if applicable)

____Table of Contents (if applicable)

____Itemized Budget

____Budget Narrative

____Project Narrative/Description(Page Limitation): ______

____Curriculum Vitae/Resumes:

____References Cited: ____

____Letters of Collaboration/Support/Commitmenmt: ____

____Consultant

____Other Partners

____Other Documents or Appendices (List Below):

______

______

______

____Subaward: ____

____Subrecipient Commitment Form submitted: To: ______

____Statement of Work____Rate Agreement

____Budget & Narrative

____Facilities and Administration (F&A)/Indirect Costs (IDC):

____Allowed Rate: ______Basis: ______

____Restricted Rate: ______Basis: ______

____Supporting Documentation

Cover Sheet Review

Federal Tax ID Number:56-0791228

DUNS #:066300096

U.S. Congressional

Legislative District:NC-012

Subject to E.O. 12372:When a competition is subject to Executive Order 12372,

select “Program is subject to E.O. 12372 but has not

been selected by the State for review” on the cover sheet.

Budget Review

Budget (Itemized):____Complete a detailed budget for each budget period. Check against the budget narrative and the University’s internal budget form. (Agency specific form)

Budget (Narrative):____ Check against the itemized budget.Proofread the budget narrative for any misspelled words.

Internal Budget Form:____Complete a University internal budget form even if using an agency specific form. Check against the agency specific budget form.

Cost Share/Matching:____Not Required____Required

___In-Kind

___Third-Party

__ Letter from College

Tuition:____All proposals that include salary for a graduate student(either full-time or part-time) must also include tuition for the student. If tuition is not included, a waiver from the Dean or designee is required. The waiver can be indicated in the eIPF. (Factor in annual increases at 5.5% above the previous year's rate. This escalation rate is projected based on historical data and trend in tuition increases across the state of North Carolina.) Is the salary inclusive of tuition? Tuition is excluded from the F&A calculation.

Personnel:____All personnel, including consultants, graduate students, and administrative support should be listed on the eIPF. If personnel is “to be determined” (TBD) then it is not necessary to include on the eIPF. A letter of collaboration from the consultant should be included in the proposal. The recommended format for letters of collaboration is:

If the proposal submitted entitled, [insert the proposal title] is selected for funding by [insert agency], it is my intent to collaborate and/or commit resources as detailed in the proposal [For NSF projects, use Project Description or the Facilities, Equipment or Other Resources section of the proposal].

The letter should be addressed to the PI.

Consultants:____Consultantsare not UNC Charlotte employees

____Letter of Collaboration

Travel:____Domestic

____Foreign

Participant Costs:____Participant costs or stipends are paid to individuals who are part of a conference, training, seminar, symposium, or other short-term instructional activity. They are not employed by UNC Charlotte. Include the number of participants in the itemized budget, and the amount each participant will receive. These costs are excluded from the F&A Calculation

Subject Incentive and

Human Subject Fees:____For individuals who are compensated for being part of a study. Usually personal information is being obtained from the individual, or there is an invasive activity performed on the individual.

Center for Educational

Measurement &

Evaluation (CEME):____Proposals that include the services of the CEME must also include a breakdown of how the amount was determined.

Facilities and

Administration:____Check rate and calculation. Exclusions will include the portion of the subcontract in excess of $25,000; tuition; equipment >$5,000; and participant costs (stipends, subsistence, travel).

Fringe Benefits Rate:____Check rates and calculations. If budget period crosses fiscal years, then use the higher rate.

FINAL PROPOSAL REVIEW (Prior to Upload)

____Check to make sure the title includes any program specific information

____Check to make sure the title on the eIPF is the same as on the proposal documents

____Check the estimated project dates. This information is required to be entered on the budget forms.

____Check to make sure the project dates on the eIPF match the proposal

____Check to make sure project dates, amount requested, and other information is correct on the cover sheet.

____Check to make sure the ED Abstract Form is not a fillable .pdf

____Check that all personnel, including consultants, graduate students, and administrative support is included on the eIPF

____Check to make sure all documents are included (i.e., resumes, letters of support, etc.)

____Check to make sure there is a letter of collaboration from the consultant

____Check that the itemized budget figures match figures on the eIPF

____Check to make sure the correct itemized budget has been uploaded in NORM

____Make sure to check the final budget narrative for typos, and upload in NORM

____Check to make sure the cost share obligation has been met.

____Check to make sure there is written confirmation from the college regarding covering

the third-party cost share requirement.

____Check file name format prior to uploading into the proposal system (ASSIST, FastLane, Grants.gov). File names that include “spaces,” “periods,” or other special characters (e.g. #, !, etc.) may not be acceptable. In some proposal systems, these files may be allowed when uploading, but will result in an error message during the submission process.

____Check subrecipient/subaward documents

____Subrecipient Commitment Form

____Statement of Work/Scope of Work

____Itemized Budget for each year

____Budget Narrative

____F&A Rate Agreement

____Execute a proposal check for federal proposal submission systems.

____Move the eIPF to the ORSO inbox

Page 1 of 5