Collision Procedures:

Rust Proofing Labor:(Body wax) _____ Labor units for each panel and _____ Materials. This allowance should be capped out at a maximum of ____ units of labor per job and _____ per Materials per job.

Corrosion Protection:

Etch Primer prior to Seam Sealer _____Labor Units for EACH AREA being caulked and _____ for materials.

Weld thru Primer: _____Labor units for each panel being welded in and _____ for each _____ units of labor.

Prep to Install Welded Panels: This includes cleaning and removing the old welds, undercoats, seam sealers, body wax, etc. This is going to be a judgment time. However, some suggested times are listed below:

Examples:

Core Support:_____units of labor

Full Front Rail:_____units of labor

Section of Front Rail:_____units of labor

Apron Assembly:_____units of labor

Section of Apron Assembly:_____units of labor

Rocker Panel:_____units of labor

Floor Pan:_____units of labor

Quarter Panel:_____units of labor

Outer Wheel House:_____units of labor

Inner Wheel House:_____units of labor

Rear Body Panel:_____units of labor

Repair of Adjacent Welded Panels after removal of Damaged panel: This is going to be a judgment time.

Example: If you remove a rear body panel on a Honda, you will be required to straighten\repair the flanges of the rear frame rails, straighten\repair the floor and quarter panel areas where the previous rear body panel was welded in, etc. These panels will be damaged during the removal process. Therefore some labor allowance must be made to repair these adjacent panels that are damaged during the removal process.

Prep pinch welds before and after clamps:_____ units Body Labor

Vehicle Set up Time to mount a vehicle on the Drive on bench system: _____ units of

Frame Labor.

Manually\Mechanically Measure and Diagnose Damage prior to the repair process:

_____ Units of Frame Labor.

Computerized Measurement and Diagnosis of Damage prior to the repair process:

_____ Units of Frame Labor

Protect Interior Trim during the repair process: _____ Units of Labor\ _____ Materials

This includes bubble wrapping of any parts such as lights, or door trim panels.

Protect Vehicle during the repair process: _____units of labor and _____ Materials to include Collision Wrap to protect open areas after disassembly, seat covers, steering wheel covers, and floor mats.

Protect Convertible Top during the repair process: _____ Units of Labor \ _____ Mat

Refinish Procedures:

Finish Sand and Buff: _____ of the basecoat labor. Materials calculated at _____ per unit.

Flex Additive: This is required on the refinishing of Plastic Parts.

_____ Units of Refinish Labor and the equivalent Materials.

Refinish Pinch Welds after Clamps:_____ units of paint labor and Materials.

Prep repaired areas for Paint: When there are ______units of repair labor per panel the estimator should calculate _____ unit of Refinish Prep Labor for each panel that has _____ units or less repair labor. If a panel has ______units of Repair labor then there should be _____ units and the equivalent materials, ______units = _____ Refinish Preparation units, etc.

Examples:

a)If a fender has _____ units damage and a door has _____ units of damaged there should be _____ units of Refinish Prep Labor and the equivalent materials because they are separate panels.

b)If a Quarter panel has _____ units of damage and a Door has _____ units of damage then the Refinish Preparation Labor charge should be _____ units of labor.

Prep Welded areas for Paint: When calculating Refinish Prep labor for Welded in panels, this too can be judgmental, however, suggestions are made below:

Examples:

a)Core Support: A Core Support being welded in could require preparation to the welded areas at both the left and right aprons as well as the left and right frame rails. For a core support _____ units of labor per welded area would be a suggested time. Thus, this particular core support would require _____ units of refinish preparation labor.

b)Quarter Panel: A Quarter Panel being welded in could require preparation to the welded areas at the rear body panel (inner\outer), the rocker panel (inner\outer), the outer wheelhouse, the inner wheelhouse, the inner roof area, the exterior roof sail panel area, the floor extension, etc. The suggested Refinish Preparation labor time would be _____ units of labor per welded area. Thus the quarter panel could require approximately _____ units of Refinish Preparation Labor. This amount could vary +\ - depending on the specific vehicle make or model.

c)Lt Front Apron Section: A left front apron section being welded in could require preparation to the welded areas at the rear section of the apron area top and bottom, thus _____ for the top and _____ for the bottom could equate to _____ units of Refinish Preparation Labor.

Mask during the Priming Process:

1rst Time of Covering Vehicle: _____ Units of labor and the equivalent materials.

2nd Time of Covering Vehicle: _____ Units of Labor and the equivalent Materials.

Mask during the Cut in Process (inner panels) Painting of the inner panels:

This is a judgment time. Examples:

  1. The inner trunk area, inner quarter panels, and the inner rear body panel require painting (Blending) from welding the rear body in. A suggested labor time for this operation would be _____ units of labor and the equivalent materials.
  2. A core support has been welded in. The engine compartment area requires masking and protecting in order to paint the aprons, frame rails, and inner core support from the welding process. A suggested time for this would be: _____ units of labor and the equivalent materials.
  3. A quarter panel has been welded in. The inner rocker panel, inner roof area and the inner quarter wheelhouse have to be refinished. The interior area of the vehicle requires masking to protect from overspray. A suggested time for this would be ______units of labor and the equivalent materials.

Mask Jambs and Openings during the Priming and\or Painting Process:

Mask jambs or openings _____ per panel less _____ overlap between each panel for overlap.

Mask beyond 36 inches during the Final Refinish process (Cover Car): _____ Units of Labor

Mechanical Procedures:

Bleed Coolant Systems and Purge:_____ Units of Mechanical labor

Disconnect and Reconnect Battery: _____ Units of Mechanical Labor

A\C Evacuate and Recharge:_____ Units of Mechanical Labor

Reset Electrical Components_____ Units of Mechanical Labor

**This doesn’t include SRS Lights requiring reset by the dealership.

Mount and Balance of a new wheel: _____ Units of Mechanical Labor

_____ for Wheel Weights and _____ for a valve stem.

Protect Open AC Line:_____ Units of Mechanical Labor/_____ for materials

Alignments:All Alignments should be done at the specific information provider’s Alignment times at the Posted Mechanical Labor Rate.

General Procedures\Charges:

Solid Waste Disposal: _____ per Repair Order

** This is a minimum charge per job. This includes waste disposal of tape, paper, etc from the refinishing of the vehicle, cardboard boxes, etc from the new parts, and disposal of damaged metal, plastic parts, etc. If the repair is a larger repair, then that should be taken into consideration.

Hazardous Materials Removal: _____ per Repair Order

This should be written on any estimate requiring any Refinish work or involving Mechanical Hazardous removal (i.e. oil, antifreeze, etc.):

Tire Disposal Fee: _____ per Tire requiring Disposal

Clean vehicle back to Pre Accident Condition:_____Units of Labor at the Body Labor Rate.

If a vehicle is a fast track shop or mechanical work only, this fee is not to be charged.

Stock Materials Charges:

Bumper Repair Materials:_____ per Bumper Repaired with Plastic Filler. This is not applicable to bumpers that are being just sanded or heated.

Rust Proofing (Body Wax):______

Seam Sealer Tips:______

Seam Sealer Fusor 123/123 EZ:______

Seam Sealer Wurth Sprayable:______

Seam Sealer Wurth Brushable:______

Weld Thru Primer:______

AC O Rings:______

Washer Fluid______

Power Steering Fluid:______

Mobil 1 Synthetic Oil:______

Freon\Oil\Dye R 134:______

Freon\Oil\Dye R 12:______