SAN FRANCISCO BAY AREA RAPID TRANSIT DISTRICT
BART DOWNTOWN BERKELEY PLAZA IMPROVEMENT PROJECT
CONTRACT NO. 05EA-110
ADDENDUM NO. 1
DATE: February 8, 2016
The following additions, deletions and modifications are hereby made a part of the Contract Documents for Contract No. 05EA-110, BART DOWNTOWN BERKELEY PLAZA IMPROVEMENT PROJECT. The Bidder shall acknowledge receipt of this Addendum, under the respective Article in the Bid Form. This Addendum No. 1 consists of the following items.
I. Contract Book (Volume 1 of 2)
Item / Page / Section / Changes1 / Page 1 of 1 / Table of Contents / Delete the “Table of Contents”, page 1 of 1,
and replace with “Table of Contents “, Page 1 of 1, Addendum No.1.
2 / Page 1 of 5 / Invitation to Bid / The date for receipt of Bids is hereby amended as follows:
SAN FRANCISCO BAY AREA RAPID TRANSIT DISTRICT
CONTRACT NO. 05EA-110
EXTENSION OF TIME FOR RECEIPT OF BIDS
NOTICE IS HEREBY GIVEN that the General Manager of theSan Francisco Bay Area Rapid Transit District has extended the time
for receipt of Bids until the hour of 2:00 p.m., Tuesday, March 8, 2015
at the District Secretary’s Office, 23rd Floor, 300 Lakeside Drive, Oakland, California 94612 or to the mailing address: P.O. Box 12688, Oakland,
California, 94604-2688 for, BART DOWNTOWN BERKELY PLAZA IMPROVEMENT PROJECT, CONTRACT NO. 05EA-110.
Dated at Oakland, California, this ______day of February 2016.
__
Kenneth A. Duron, District Secretary
San Francisco Bay Area Rapid Transit District
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32 / Page 21 of 48
Page 22 of 48
Page 45 of 48
Page 2 of 21
Pages 7 of 21
Pages 1-5
Pages 1-14
Pages 1-6
Page 1 of 1
Page 1 of 3
Pages 1-10
Page 1 of 1
Pages 1- 6
Pages 1and 5 of 6
Page 1 of 1
Page 4 of 7
Page 1 of 12
Pages 1- 3
Page 1 of 1
Page 1 of 1
Pages 1 - 11
Page 1 of 1
Pages 4 and 8 of 18
Page 1 of 1
Page 10 of 11
Page 1 of 1
Pages 1-38
Page 4 of 6
Pages 2, 6 and 7 of 14
Pages 1-2 / SC7.1.13
SC7.3.2
SC10.27
Bid Form
Bid Form
Table of Contents
01 11 00
01 20 00
01 52 00
01 57 00
01 57 05
02 41 00
05 50 00
05 52 00
06 10 00
07 42 13
07 42 14
08 31 00
08 80 00
09 24 11
09 96 00
09 96 33
12 93 00
31 00 00
32 14 00
32 16 21
32 17 25
32 84 00
32 90 00
33 46 00 / Delete Supplementary Conditions Article SC7.1.13 and replace with a new Supplementary Conditions Article SC 7.1.13 as follows:
“SC7.1.13 Electronic Submittal of Payroll Records. Delete General Conditions Article GC7.1.3.5(b) and replace with the following:
“(b) A certified copy of payroll records provided for in State of California Labor Code Section 1776 shall be furnished to the Engineer each week, and shall be provided within seven (7) Days after the regular payment date of the payroll period. Failure to comply with these requirements may cause suspension of progress payments during the period of noncompliance or may delay final payment.
(c) Within seven (7) Days following NTP, the Contractor shall register at BART’s designated website for electronic submittal of Certified Payroll Records. BART’s Office of Civil Rights will notify the Contractor and provide all necessary information related to BART’s designated website for electronic submittal of Certified Payroll Records. Each week, the Contractor and its Subcontractors shall submit their respective Certified Payroll Records electronically to BART’s designated website in accordance with the requirements of the website. These records shall be provided within seven (7) Days after the regular payment date of the payroll period. Failure to comply with these requirements may cause a suspension of progress payments during the period of noncompliance or may delay final payment. Contractor shall include in its Subcontracts, and require its Subcontractors of every tier to include in their respective Subcontracts, provisions incorporating the requirements of this Supplementary Conditions Article SC7.1.13 for electronic submittal of Certified Payroll Records.”
Delete Supplementary Conditions Article SC7.3.2 and replace with a new Supplementary Conditions Article SC7.3.2 as follows:
“SC7.3.2 Certified Payroll Records Submittal to the California Department of Industrial Relations (DIR). Within thirty (30) Days following Award of the Contract, the Contractor and its Subcontractors shall register with the State DIR at https://efiling.dir.ca.gov/PWCR/ in order to enroll in the electronic system for monthly submittal of Certified Payroll Records. Thereafter, each month the Contractor and its Subcontractors shall submit electronically a copy of their respective Certified Payroll Records to the DIR. Contractor shall include in its Subcontracts, and require its Subcontractors of every tier to include in their respective Subcontracts, provisions incorporating the requirements of this Supplementary Conditions Article SC7.3.2 for Certified Payroll Records submittal to the DIR. Failure to comply with these requirements may cause a suspension of progress payments during the period of noncompliance or may delay final payment.”
In Supplementary Conditions Article SC10.27, delete the Articles SC10.27A and B that follow Article SC10.27G and replace with new Articles SC10.27H and I to read as follows:
H. U.S. Federal Communications Commission regulations,
"Telecommunications Relay Services and Related Customer
Premises Equipment for Persons with Disabilities," 47 CFR
Part 64, Subpart F;
I. U.S. FTA regulations, "Transportation for Elderly and
Handicapped Persons," 49 CFR Part 609.
Delete Bid Form page 2 of 21 and replace with attached Bid Form page 2 of 21, Addendum No.1.
Delete Bid Form pages 7 of 21 through 12 of 21 and replace with attached Bid Form pages 7 of 21 through 12 of 21, Addendum No.1.
Delete Table of Contents, Contract Specifications, pages 1-5 and replace with the attached, Table of Contents, Contract Specifications, Addendum No. 1
Delete Contract Specifications Section 01 11 00, Summary of Work, pages 1-13 and replace with the attached Contract Specifications Section 01 11 00, Summary of Work, pages 1-14 Addendum No. 1.
Delete Contract Specifications Section 01 20 00, Price and Payment Procedures and replace with the attached Contract Specifications Section 01 20 00, Price and Payment Procedures, Addendum No. 1.
Delete Contract Specifications Section 01 52 00, Construction Facilities, and replace with the attached Contract Specifications Section 01 52 00, Construction Facilities, Addendum No. 1
Delete Contract Specifications Section 01 57 00, Temporary Controls, page 1 of 3, and replace with the attached Contract Specifications Section 01 57 00, Temporary Controls, page 1 of 3, Addendum No. 1
Add new Contract Specifications Section 01 57 05 Traffic Work, Addendum No 1
Delete Contract Specifications Section 02 41 00, Demolition, page 1 of 1, and replace with the attached Contract Specifications Section 02 41 00, Demolition, page 1 of 1, Addendum No. 1
Delete Contract Specifications Section 05 50 00, Metal Fabrications, pages 1- 5 and replace with the attached Contract Specifications Section 05 50 00, Metal Fabrications, pages 1- 6, Addendum No. 1
Delete Contract Specifications Section 05 52 00, Metal Railings, pages 1 and 5 of 6 and replace with the attached Contract Specifications Section 05 52 00, Metal Railings, pages 1 and 5 of 6, Addendum No.1
Add new Contract Specifications Section 06 10 00, Rough Carpentry, Addendum No 1
Delete Contract Specifications Section 07 42 13, Aluminum Plate Panel System, page 4 of 7 and replace with the attached Contract Specifications Section 07 42 13, Aluminum Plate Panel System, page 4 of 7, Addendum No. 1
Delete Contract Specifications Section 07 42 14, Metal Wall Panels, page 1 of 12 and replace with the attached Contract Specifications Section 07 42 14, Metal Wall Panels, page 1 of 12, Addendum no 1
Add new Contract Specifications Section 08 31 00, Access Doors and Panels, Addendum No 1
Delete Contract Specifications Section 08 80 00, Glazing, page 1 of 1, and replace with the attached Contract Specifications Section 08 80 00, Glazing, page 1 of 1, Addendum No 1
Add new Contract Specifications Section, 09 24 11, Portland Cement Plaster, Addendum No 1
Add new Contract Specifications Section, 09 96 00, High Performance Coatings, Addendum No 1
Delete Contract Specifications Section, 09 96 33, Graffiti-Resistant Coating, page 1 of 1, and replace with the attached Contract Specifications Section, 09 96 33, Graffiti-Resistant Coating, page 1 of 1, Addendum No 1
Delete Contract Specifications Section 12 93 00, Site Furnishings, page 4 and 8 of 18, and replace with the attached Contract Specifications Section 12 93 00, Site Furnishings, pages 4 and 8 of 18, Addendum No 1
Delete Contract Specifications Section 31 00 00, Earthwork, page 1 of 1 and replace with the attached Contract Specifications Section 31 00 00, Earthwork, page 1 of 1, Addendum No 1
Delete Contract Specifications Section 32 14 00, Unit Pavers, page 10 of 11, and replace with the attached Contract Specifications Section 32 14 00, Unit Pavers, page 10 of 11, Addendum No 1
Delete Contract Specifications Section 32 16 21, Concrete Curbs Gutters and Walks, page 1 of 1, and replace with the attached Contract Specifications Section 32 16 21, Concrete Curbs Gutters and Walks, page 1 of 1, Addendum No 1
Delete Contract Specifications Section 32 17 25, Traffic Signals, Pages 1-38 and the duplicate Contract Specifications Section 32 17 25, Traffic Signals, in their entirety and replace with the attached Contract Specifications Section 32 17 25, Traffic Signals Pages 1-38, Addendum No 1.
Delete Contract Specifications Section 32 84 00, Planting Irrigation, page 4 of 6, and replace with the attached Contract Specifications Section 32 84 00, Planting Irrigation, page 4 of 6, Addendum No 1
Delete Contract Specifications Section 32 90 00, Planting, pages 2,6 and 7 of 14, and replace with the attached Contract Specifications Section 32 90 00, Planting, pages 2,6 and 7 of 14, Addendum No 1
Delete Contract Specifications Section 33 46 00, Subdrainage, pages 1-2, and replace with the attached Contract Specifications Section 33 46 00, Subdrainage, pages 1-2, Addendum No 1
II. Reference Drawings as contained in the Contract Book Reference Document DVD
(Volume 1 of 2)
34 The following Reference Drawings, attached as part of this Addendum, are hereby added to the
Contract Documents.
Page No.
404
405 / Dwg. No.
R162
R163 / Revision No.
-
- / Drawing Title
Berkeley- Richmond Line Berkeley Station miscellaneous Details IV
Berkeley- Richmond Line Berkeley Station miscellaneous Details V
III. Contract Drawings (Volume 2 of 2)
35 / The following Contract Drawings with a Revision No. of “P” are deleted and are hereby replaced by
the following Contract Drawings with a Revision No. of “Q” and a revision date of “01/28/2016,”
which drawings are attached as a part of this Addendum.
Page No. / Dwg. No. / Revision No. / Drawing Title
002
003
004
005
006
007
008
009
010
011
012
042
044
045
046
047
048
051
052
060
063
065
068
071
074
075
076
077
078
079
080
091
092
093
095
096
083
086
087
089
098
154
158
160
162
163
164
165
167
169
170
172
173
174
175
182
185
199
200
209 / X002
X003
X004
X005
G000
G001
G002
G003
G004
G005
G006
S101
S201
S202
S203
S204
S301
S401
S402
S410
S413
S415
A002
A111
A131
A140
A141
A142
A143
A144
A145
A440
A441
A442
A444
A445
A162
A410
A411
A420
A461
L001
L113
L114
L116
L117
L118
L119
L121
L131
L210
L212
L213
L213A
L214
L222A
L231
E110
E120
E302 / Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q / Index of Drawings
Index of Drawings
Index of Drawings
Index of Drawings
Street Level Plan, Bid Options 1, 2, 3, 4, 5, 6 and 7
Work Phases, Schedule, General Notes and Legend
Phase 1, Street Level Construction Phasing Plan
Phase 2, Street Level Construction Phasing Plan
Phase 3, Street Level Construction Phasing Plan
Concourse Level Partial Plan, Phase 1
Partial Cross Section, Protective Cover Work Platform, Phase 1
General Notes Sheet 1 of 2
Entrance 3 Headhouse Foundation Plan
Entrance 3 Headhouse Roof Plan
Entrance 1, 2, 5 6 Typical Plan
Entrance 4 Roof and Floor Plan
Entrance 3 Headhouse Typical Elevations
Entrance 3 Headhouse Details Sheet 1 of 5
Entrance 3 Headhouse Details Sheet 2 of 5
Entrance 1, 2, 4, 5, 6 Sections and Details
Bus Shelter Footing Details
Entrance 3 Details for Floor Access Door
General Notes and Master Key Notes
Entrance 1 Section and Elevations
Entrance 3 Stair/Escalator Section
Entrance 3 Headhouse Demolition Plan and Section
Entrance 3 Headhouse Floor Plan
Entrance 3 Headhouse Roof Plan and Reflected Ceiling Plan
Entrance 3 Headhouse Elevations
Entrance 3 Headhouse Transverse Section
Entrance 3 Headhouse Longitudinal Section
Entrance 3 Headhouse Details Sheet 1 of 5
Entrance 3 Headhouse Details Sheet 2 of 5
Entrance 3 Headhouse Details Sheet 3 of 5
Entrance 3 Headhouse Details Sheet 5 of 5
Plaza Details
Entrance 4/ Elevator Headhouse Section and Door Schedule
Entrance 1 Details
Entrance 1,2,4,5,6 Details Sheet 1 of 2
Details
Entrance 4 Details Sheet 2 of 2
Landscape Notes, Abbreviations and Symbols
Enlarged Plaza Layout and Hardscape Plan, Sheet 1 of 7
Enlarged Plaza Layout and Hardscape Plan, Sheet 3 of 7
Enlarged Plaza Layout and Hardscape Plan, Sheet 5 of 7
Enlarged Plaza Layout and Hardscape Plan, Sheet 6 of 7
Plaza Hardscape Plan, Sheet 7 of 7
Plaza Planting Plan
Entrance Areas 2 and 4- Hardscape Plan
Entrance Areas 5 and 6- Hardscape Plan
Site Furnishing Details, Sheet 1 of 9
Site Furnishing Details, Sheet 3 of 9
Site Furnishing Details, Sheet 4 of 9
Site Furnishing Details, Sheet 5 of 9
Site Furnishing Details, Sheet 6 of 9
Hardscape Details, Sheet 4 of 4
Landscape Details, Sheet 2 of 3
Electrical Site Plan- New Work
Entrance 1 Electrical Demolition and New Work
Electrical Plaza Area Details
Contract No. 05EA-110