Risk Assessment
Part A – Generic Hazards
Activity: / Working at Heights –Trestles and StagingClient: Click here to enter text. / Site: Click here to enter text. / Date of Assessment: Click here to enter text.
Hazards / Harm / Risk prior to Control
Measures / Persons at Risk / Required Control Measures / Records/Actions / Risk - Control Measures
Applied
Incorrect selection of work method
Equipment Failure/ incorrect assembly
Manual Handling
When carrying and erecting
Defective Equipment
Fall of tools/ equipment
Fall from heights / Serious Injury from fall
Serious Injury from fall/collapse, items falling
MSD, back injury
Serious Injury from fall/collapse,
Injuries to persons under
Serious Injury from fall / S=4
L=3
R= High
S=4
L=3
R= High
S=4
L=2
R=Medium
S=4
L=3
R= High
S=4
L=3
R= High
S=4
L=3
R= High / Operatives/ Persons adjacent
Operatives/ Persons adjacent
Operatives
Operatives
Persons adjacent
Operative / Trestles, staging, ladders and stepladder will only be used if there is no safer alternative available. Trestles and staging will be used for short duration work only
Only authorised personnel will erect, modify or dismantle staging and trestles
Manual Handling and regular refresher training to be provided
Pre-use inspection, regular inspections
Adequate edge protection together with hand and intermediate rails must be incorporated into the staging/trestle
Both feet will be kept on the working platform at all times.
Harnesses will be used if the required (assessment to be carried out on the ground conditions prior to work commencing). / Planning, Method Statement, training, supervision
Training, supervision
Inspection, training and supervision
Inspection, training and supervision
Training, supervision
Training, supervision / S=3
L=1
R=Low
S=3
L=1
R=Low
S=3
L=1
R=Low
S=3
L=1
R=Low
S=1
L=2
R= Low
S=1
L=2
R= Low
Risk Assessments
Part B – Site Specific Hazards
Activity: / Working at Heights – Trestles and StagingConsider:
Location (space available, environment, ground conditions)
Others affected (other work in vicinity, staff, public)
Hazards / Harm / Risk prior to Control
Measures / Persons at Risk / Required Control Measures / Records/Actions / Risk - Control Measures
Applied
Click here to enter text. / Click here to enter text. / Click here to enter text. / Click here to enter text. / Click here to enter text. / Click here to enter text. / Click here to enter text. /
Site Specific Assessment compiled by Click here to enter text. Date: Click here to enter text.
RISK ASSESSMENT DECLARATION.
I confirm that I have been briefed on the associated risks involved, I am aware of the restrictions and safety related issues involved in this task. I am aware that if for any reason I cannot carry out the work as instructed I must stop work and inform my supervisor.
Date. / Name. / Company. / Signature.NOTE: This declaration may be replaced with single project declaration if referenced therewith