Requirements to the client of the Large Scale CO2 plant in Bldg. 158
To connect a client test system (later on called the “experiment”) the CO2 Large Scale Plant delivers CO2 in sub-cooled liquid conditions with:
- Mass flow rate of 0.5 g/s up to 15 g/s,
- Saturation temperature Tsat between -27°C and 25 °C,
- Saturation pressures corresponding to Tsat mentioned before,
- Vapor qualities can be varied by the experiment from 0.05 to 1.
Demands on the client/experiment:
- Consideration of the building dimensions, mainly the maximum height,
- Connection to the system via the Swagelok connectors imperial size ¼” (d=6.35 mm) or
VCR ½” connections (flexible connection have to be provided by the client),
- The experiment must be tested to a max. pressure of 120 bar, because the safety valves in the system are adjusted to 96 bar. (safety factor of 1.25)
- In case of lower withstand pressure => contact the CO2 cooling team to check possible modifications sufficiently in advance,
- The experiment should be insulated, preferred: insulation vacuum with p<1*10-3 mbar,
- In case of vacuum insulation the vessel must have a relief valve at p=100 mbar over pressure,
- Any other vessel etc. enclosing CO2 installation must have a safety relief valve at p=100 mbar,
- this safety valve should be dimensioned such that a rupture of a CO2 line in the experiment and the following blow out of CO2 can pass the safety valve avoiding a pressure built up in the vacuum enclosure,
- The experiment should be leak tested to the environment with a leak rate <10-4 mbar*l/s,
- The experiment should be equipped with:
Ø a J-T valve or capillary at the entrance Δp=5 bar to 50bar,
Ø a temperature sensor and a pressure sensor at the entrance,
Ø remote control of the heat input at the test section => PLC controled via plant
Ø a compensation heater after the test section that keeps the overall heat input constant.
- The experiment must be purged 3 times by applying vacuum / pressure p>6 bar of CO2 when connected to the Large Scale Plant, after that the experiment can be connected hydraulically,
- Specifications for the cool down procedure have to be discussed,
- The client has to bring its own data acquisition and analyzing tools,
- Official request to the CO2 cooling team describing the experimental needs.
Contact persons:
- Jan Godlewski,
- Hans Postema,
- Johan Bremer.