ELECTRICAL MAINTENANCE
/ Page No. : 1 of 8- PURPOSE:
To establish the system for the maintenance of electrical equipments and to ensure that the equipments are available continuously for preventive maintenance.
- SCOPE:
This is applicable to the preventive & breakdown Maintenance of electrical equipment of Foil.
- DEFINITIONS:
Dy.General Manager - Deputy General Manager
Asst.Manager - Assistant Manager
PMI - Preventive Maintenance Incharge
I.D. No. - Identification Number
P.M - Preventive Maintenance
- RESPONSIBILITY:
4.1Head of department is over all responsible for implementing this procedure.
4.2Personal performing breakdown maintenance shall not carry out preventive maintenance.
4.3Individual responsibilities of specific activities are described here after.
- PROCESS INPUT:
5.1Work instruction for carrying out maintenance activities.
5.2Intimation of breakdown by work order
5.3P.M.Slippage Record
5.4P.M.Schedule
5.5PM Checklist
5.6P.M.Schedule cum check sheet
- PROCESS DESCRIPTION & INTERFACES:
- Preventive maintenance: -
Sr. No. / Activity / Responsibility / Ref. Doc.
1 /
All the equipments requiring periodic maintenance will be identified and a list will be prepared.
/Asst.Manager
/ FQMNT02F012 /
A unique I.D.No. Will be given to them.
/Asst.Manager
/ FQMNT02F013 /
The frequency of maintenance will be decided on the basis of
- Manufacture recommendation
Asst.Manager
/ Operation & Maintenance Manual FQMNT02F064 / The P.M. schedule/P.M.Schedule cum check sheet will be made as per the identified frequency above. /
Asst.Manager
/ FQMNT02F06 FQMNT02F185 / The equipment will be spared and the preventive maintenance will be carried out as per P.M check list/ P.M.Schedule cum check sheet & relevant work instruction. /
Asst.Manager/PMI/ Sr.Formen/
Foreman
/ FQMNT02F07, FQMNT02W03, FQMNT02W10, FQMNT02W12 FQMNT02F18,FQMNT02W05
6 / The P.M. checklist / P.M.Schedule cum check sheet will be filled up after completing maintenance. /
PMI
/ FQMNT02F07, FQMNT02F187 / In case of any schedule getting delayed due to any reasons or preventive action if not carried out, should be recorded in the P.M slippage record. /
PMI
/ FQMNT02F088 / Review the P.M. schedule at least Six monthly for types of checks & frequency on the basis of its effectiveness. /
Asst.Manager/PMI
/ FQMNT02F03, FQMNT02F049 / Review the P.M.slippage record monthly & to avoid the frequency of slippage. / Asst.Manager/
PMI / FQMNT02F08
10 / In a case of overhauling required, for the equipment, follow the respective work instruction/Vendor instruction manual and filled the over hauling check list. / Sr. Foreman/ Foreman / Operating and maintenance manual, FQMNT02W09, FQMNT02W07
FQMNT02F19
11 / Operation of DG SET, Circuit breaker, 66KVSwithyard,HT Capacitor bank and power changeover done as per work instruction. / Shift foreman / FQMNT02W01
FQMNT02W02
FQMNT02W04
FQMNT02W08 FQMNT02W11
B. BREAKDOWN: -
Sr. No. /Activity
/ Responsibility / Ref. Doc.1 / Receiving work order from user department regarding breakdown of any equipment. / Shift Incharge
2 / Review the problem and allocate the job to concern person. / Asst.Manager/
Shift Incharge
3 / Carry out the breakdown maintenance. As per work instruction. / Sr.Forman/ Shift Incharge/Foreman / FQMNT02W06
4 / Prepare daily breakdown report and sent copy to Dy.GM (Mech) & GM (F&A). / Sr.Forman /Foreman / FQMNT02F03
5 / Prepare monthly breakdown report and sent copy to V.P. (foils), all Deptt. Heads, MIS & PPC. / Sr.Forman /Foreman / FQMNT02F04
- PROCESS OUT PUTS:
- Continue availability of machine.
- Relevant reports & records of equipments.
- P.M.Slippage Record.
- PROCESS MONITORING:
Sr. No. / Description /
Frequency
/ Responsibility1 /
Review of P.M. schedule.
/Six monthly
/ Asst.Manager2 /
Review P.M.slippage record.
/Monthly
/ Asst.Manager- RECORDS:
Sr.No. / Record No. / Record Title / Retention period / Location / Disposal authority
1 / FQMNT02F01 / COMPREHENSIVE EQUIPMENT LIST / Till the equipment Last / ELECTRICAL SHOP FLOOR / Dy. General Manager
2 / FQMNT02F02 / EQUIPMENT HISTORY RECORD / Till the equipme
nt Last / ELECTRICAL SHOP FLOOR, MSDS&ERS / Dy. General Manager
3 / FQMNT02F03 / DAILY BREAKDOWN REPORT / Six Months / ELECTRICAL SHOP FLOOR / Dy. General Manager
4 / FQMNT02F04 / MONTHLY BREAKDOWN REPORT / 1Year / ELECTRICAL SHOP FLOOR / Dy. General Manager
5 / FQMNT02F05 / MAJOR BREAKDOWN ANALYSIS REPORT / 1Year / ELECTRICAL SHOP FLOOR / Dy. General Manager
6 / FQMNT02F06 / PM SCHEDULE / 1Year / ELECTRICAL SHOP FLOOR/MSDS / Dy. General Manager
7 / FQMNT02F07
FQMNT02F07/ 01
FQMNT02F07/ 02
FQMNT02F07/ 03
FQMNT02F07/ 04
FQMNT02F07/ 05
FQMNT02F07/ 06
FQMNT02F07/ 07
FQMNT02F07/ 08
FQMNT02F07/ 09
FQMNT02F07/ 10
FQMNT02F07/ 11
FQMNT02F07/ 12
FQMNT02F07/ 13
FQMNT02F07/ 14
FQMNT02F07/ 15
FQMNT02F07/ 16
FQMNT02F07/ 17
FQMNT02F07/ 18
FQMNT02F07/ 19
FQMNT02F07/ 20
FQMNT02F07/ 21
FQMNT02F07/ 22
FQMNT02F07/ 23
FQMNT02F07/ 24
FQMNT02F07/ 25
FQMNT02F07/ 26
FQMNT02F07/ 27
FQMNT02F07/ 28
FQMNT02F07/ 29
FQMNT02F07/ 30
FQMNT02F07/ 31 /
P.M.CHECK LIST:-
MILL M50MILL M51
MILL M52
MILL Q4
MILL Q5
CRANE # 1
CRANE # 2
CRANE # 3
CRANE # 4
CRANE # 5
CRANE # 6
CRANE # 7
CRANE # 8
CRANE # 4A
REWIND LINE # 1
REWIND LINE # 2
REWIND LINE # 3
BAILING PRESS
ROLL GRINDER
ANN. FURNACE # 1
ANN. FURNACE # 2
ANN. FURNACE # 3
ANN. FURNACE # 4
OVEN # 1
OVEN # 2
OVEN # 3
SEPARATOR # 25
SEPARATOR # 26
DOWN ENDER
FUME EXH. SYSTEM
H G SLITTER / 1Year / ELECTRICAL SHOP FLOOR/MSDS / Dy. General Manager
FQMNT02F07/ 32
FQMNT02F07/ 33
FQMNT02F07/ 34
FQMNT02F07/ 35
FQMNT02F07/ 36
FQMNT02F07/ 37
FQMNT02F07/ 38
FQMNT02F07/ 39
FQMNT02F07/ 40
FQMNT02F07/ 41
FQMNT02F07/ 42
FQMNT02F07/ 43 FQMNT02F07/ 44 / M G SLITTER
L G SLITTER
DOCTOR REWINDER
DRY BOND LAM.
PRINTING MACHINE
EXTRUDER COATER
MAIN PUMP HOUSE
COOLING TOWER
NITROGEN GEN.
FIRE HYDRANT
W.T.P.
VENT. SYSTEM
COMP. HOUSE / 1 Year / ELECTRICAL SHOP FLOOR/MSDS / Dy.
General
Manager
8 / FQMNT02F08 / P.M.SLIPPAGE RECORD / 1Year / ELECTRICAL SHOPFLOOR/MSDS / Dy. General Manager
9 / FQMNT02F09 / WORK ORDER / 3 Month / ECR Q4/Q5, ERS& MSDS / Dy. General Manager
10 / FQMNT02F10 / WORK PERMIT / 3Month / ECR Q4/Q5, ERS& MSDS / Dy. General Manager
11 / FQMNT02F11 / OVERHAULING SCHEDULE / 1 Year / MSDS / ERS / Dy. General Manager
12 / FQMNT02F12 / SHIFT LOG BOOK / 1YEAR / Q4/Q5 CONTROL ROOM / Dy. General Manager
13 / FQMNT02F13 / DAILY ENERGY GENERATION /CONSUMPTION REPORT / Six Months / MSDS / Dy. General Manager
14 / FQMNT02F14 / STATEMENT SHOWING ENERGY GENERATED & CONSUMED INCLUDING CONSUMPTION OF DIESEL / 1Year / MSDS / Dy. General Manager
15 / FQMNT02F15 / DG LOG BOOK / 1Year / MSDS / Dy. General Manager
16 / FQMNT02F16 / ANALYSIS OF MOTOR FAILURE / 1Year / ERS / Dy. General Manager
17 / FQMNT02F17 / ELECTRICAL POWER CONSUMPTION REPORT / 1Year / ELECTRICAL SHOP FLOOR / Dy. General Manager
18 / FQMNT02F18
FQMNT02F18/ 01
FQMNT02F18/ 02
FQMNT02F18/ 03
FQMNT02F18/ 04
FQMNT02F18/ 05
FQMNT02F18/ 06
FQMNT02F18/ 07
FQMNT02F18/ 08
FQMNT02F18/ 09
FQMNT02F18/ 10
FQMNT02F18/ 11 / PM SCHEDULE CUM CHECK SHEET: -
LT air circuit breaker
66 kv CT, PT, CVT & LA
LT APFC panel, HT capacitor bank & reactor
Battery bank & battery charger
11 kv & 132 kv MOCB
11 kv T.M.G. ACB
11 kv ABB (indoor & outdoor) & Siemens VCB
66 kv Sf6 circuit breaker
22 kv Sf6 circuit breaker
11 kv, 22 kv & 66 kv isolators
11 kv, 1500 kva DG set / 1Year / MSDS / Dy. General Manager
FQMNT02F18/ 12
FQMNT02F18/ 13
FQMNT02F18/ 14
FQMNT02F18/ 15 / Power & distribution transformer
415 v, 125 kva DG set
Sub- station (monthly)
Sub- station (fortnight) / 1Year / MSDS / Dy. General Manager
19 / FQMNT02F19 / OVER HAULING CHECK LIST / 3 Years / ERS / Dy. General Manager
10. REFERENCE :
Sr.No. / Document no. / Work instruction1 / FQMNT 02W01 / OPERATION OF D.G.SET
2 / FQMNT 02W02 / OPERATION OF 66KV SWITCH YARD
3 / FQMNT 02W03 / OPERATION AND MAINTENANCE OF BATTERY BANK
4 / FQMNT 02W04 / OPERATION OF H.T CAPACITOR BANK
5 / FQMNT 02W05 / OPERATION AND MAINTENANCE OF TRANSFORMER
6 / FQMNT 02W06 / BREAKDOWN MAINTENANCE
7 / FQMNT 02W07 / OVER HAULING OF D.C. MOTOR
8 / FQMNT 02W08 / POWER CHANGE OVER
9 / FQMNT 02W09 / OVER HAULING OF A.C. SLIPRING MOTOR
10 / FQMNT 02W10 / MAINTENANCE OF DIESEL GENERATOR
11 / FQMNT 02W11 / OPERATION OF CIRCUIT BREAKER
12 / FQMNT 02W12 / PREVENTIVE MAINTENANCE
Approved By: / Issued By: / Edition No. 01
Date: 01. 12. 2001 / Date: 01.12. 2001 / Revision No. 02