/ DELHI POLLUTION CONTROL COMMITTEE
DEPARTMENT OF ENVIRONMENT, (GOVT. OF NCT OF DELHI)
4TH FLOOR, ISBTBUILDING, KASHMERE GATE, DELHI-6
visit us at :

Regarding Meeting of the Cell Phone Operators

Meeting of the Cell Phone Operators held on 10.03.2008 at 4.PM in

the chamber of Chairman,Delhi Pollution Control Committee.

The list of participants is at, Annexure-I

Attention of all cell phone operators was invited by the Chairman, DPCC regarding noise and health problems faced by people due to pollution causedby cell phone towers. After detailed discussions with the cell phoneoperators, it was decided that:

01. The cell phone operators must make efforts to share cell phone tower

Infrastructure so as to bring down the total number of cell phone towers

below 2000 against the existing 5000 towers in the city.

02. The cell phone operators shall make efforts to replace the existing

D.G.Sets with the cleaner fuel technologies i.e. gas based DG Sets or

solar energy based or Invertors. Copy of the complaints against the cell

phone towers received shall be sent to cell phone operators.

03. As advised by the Department of Telecommunications, Govt. of India,

(a) Cell phone towers which have been installed in the premises of Schools

and Hospitals shall be removed, and relocated immediately because

children and patients are more susceptible to electromagnetic radiations,

(b) Cell phone towers which are located in narrow lanes shall be removed

and relocated.

(c) Cell phone towers should be at least 3 meters away from nearby

building and antenna should not directly face the building and

lower end of the tower should be at least 3 meters above the

ground

or roof.

04. Cell phone operators shall get a study conducted on the adverse

effects of electromagnetic radiations from the Cell Phone Towers.

05. A copy of the draft guidelines issued by Telecommunication

Engineering Centre, Govt. of India shall be provided to cell

Phone operators for them tocomply with the same.

06. The incomplete information provided by some of the cell Phone

operators would be completed within two weeks.

The meeting ended with thanks to chair.
List of persons who attended the meeting regarding CellPhoneTowers on 10.03.2008 at 4.00 p.m. in the Conference Hall of chairman, DPCC

S.No. / Name and designation / Name of the Company / Address
1. / Mr. Sunil Sharma, ROW / Reliance Communication / 8th floor, VijayaBuilding, B.K. Road, Connaught Place
2. / Mr. Ashok Mehta
Head Corporate Affairs / Vodafone / C-48, Okhla Indl.Area, Ph-2, New Delhi - 20
3. / Mr. Puneet Narula
A.M. Estt. / Airtel / D-184, Okhla Phase – I, New Delhi11
4. / Mr. Gagan Kumar / Airtel / D-184, Okhla Phase – I, New Delhi11
5. / Mr. Manoj Rana / WTTIL / 2A, Old Ishwar Nagar, New Delhi
6. / Mr. Sandeep Kandhari / WTTIL / 2A, Old Ishwar Nagar, New Delhi
7. / Mr. Vatsalaya Vashney
Manager , Real Estate / Idea Cellular Ltd. / A-30, MCIA,
8. / Mr. K.K. Singh / Idea Cellular Ltd. / A-30, MCIA,