add: nakla .Embaba .Giza, Egypt
E-mail: Tel:-01063914466
Mohamed Rafaat Elsayed Amer
1. Personal Details / Ø Military status : completedØ Marital status : Single.
Ø Nationality : Egyptian.
Ø Date of Birth : 11 – 11-1985
Ø Gender : Male
Ø Last Job : Control Engineer in Soi lights company (from 2009 to 2010)
Ø Add. : nakla - manshiet el Qanater -Giza -Egypt
Ø Mobile : 002 01063914466
Ø Email :
2. University Education / Ø Minofiya University
Ø Faculty of Electronic Engineering.
Ø B.Sc. of Industrial electronics & Automatic Control engineering.
Ø Grade : acceptable with an honor degree (61.22 %).
Ø Graduated Project : production line
Ø Project Grade : Excellent (99.5 %)
Ø Graduation Year : May/2012
3. Languages / Ø Arabic (Mother Tongue.)
Ø English (Good fluent command (spoken/written/reading)
4. Computer Skills / Ø Operating systems & Microsoft Office(ICDL)
Ø Skills for computer software & hardware maintenance.
Ø Skilled in using, CIRCUIT MAKER, , EAGLE
Software for circuit design and analysis.
Ø Microcontrollers programming using C, basic and assembly
Ø Internet Skills.
5. Personal Skills / Ø The ability to learns new tools
Ø Practical application: --dc motor speed & position control & Level control
& temperature control & hydraulic and pneumatic control.
Ø Excellent communication skills , work in team, making good presentation of
my ideas, and work for long time with high efficiency.
6. TRAININGS / Ø Training in "Helwan University Hospital" (2006\2007) .
Ø Training in Alfa electronics (2008).
Ø Soi lights Company (2009).
Ø Coca Cola Egypt Factory (2009).
Ø SYSTEL telecom company (2010)
7. HINTS ABOUT THE graduation PROJECT / Ø My main project is Production line
The main objectives of my project is to design a production line system
In order to mobilize the product after conducting various operations it
The following is an explanation of this process Designing a water treatment process.
Ø Designing a production line.
Ø Designing a max station.
Ø Linking three processes as a completely system.
Ø Simulate the complete system.
Ø Monitoring and control of the introduced process using PLC.
Ø using Microcontrollers programming to control this production line.
Ø Using the scada system to monitor the production line