EXECUTIVE SUMMARY

  • Qualified Mechanical Engineer with displayed credentials in planning & supervising the assigned project right from scoping, planning, scheduling, defining technical specifications, reporting and documentation, coordination with team members & clients, etc. and monitoring to ensure project accomplishment within defined time/cost parameters
  • Technically competent with tremendous experience in erection & alignment of structures,planning,erection and alignment of static & rotary equipment’s
  • Professional competencies in mobilizing and judiciously managing resources, materials management including raising indent for Materials, Contractor Management, OPI of materials, and reconciliation of materials issued to the contractor
  • Possess clear understanding of Construction Methods & Implementation, sound understanding of the Industrial Standards, Code& Practices and Health & Safety Norms
  • A complete manager with excellent communications skills, demonstrated capabilities in team building and training professionals with different skill sets from various disciplines for executing new projects

Key Competencies

Construction Management  Detailed Engineering  Crisis Management Equipment Installation/Commissioning  Quality Management  Safety Management  Analytical Skills  Nurturing Project Planning/Scheduling Cross Functional Coordination

KEY ACCOLADES ACROSS CAREER PATH

  • Working as an in charge of 2*6 Strand Billet Caster, 1*6 Strand Bloom cum Billet Caster & 1*3 Strand Beam Blank Caster at SAIL-BHILAI site
  • Proper planning of resources, scheduling, assembly & erection of critical structure of Canopy in SMP unit for M/s Essar Steel Ltd, Hazira, Gujarat.
  • Hands on experience in the erection of ducts for power plant project.
  • My work was appreciated by Mr. A.V. Amarnath (Project Director) and was awarded with “Project Pride Award”.
  • Useful experience in erection, alignment of 1500 MT of static and rotary equipments of Platemill at SAIL project-Rourkela.

PROFESSIONAL SPAN

Project :- 7 MTPA SMSlll CASTER, BHILAI, CHHATTISGARH

Client : - STEEL AUTHORITY OF INDIA LIMITED SINCE APR-2014

Employer : - ESSAR PROJECTS INDIA LIMTED as Manager

Area: - 2*6 Strand Billet Caster, 1*6 Strand Bloom cum Billet Caster & 1*3 Strand Beam Blank Caster(Equipment)

  • In-chargeof static and rotary equipments in Caster area.

Planning & Scheduling of equipment erection and alignment of Caster, Follow up with client for civil front availability, Co-ordinate with Technology provider(SVAI now Prime Metals) and Client for material and its OPI, erection and alignment of Equipments as per standard procedure, job monitoring, maintaining of database of progress tracker, preparing database for billing purpose maintaining quality records includes in the scope

Preparation and review of Caster area weekly, Monthly Progress Report

Attending the Customer Project Progress review meeting

Execution of erection and alignment of equipments viz. Ladle turret, Oscillation unit, Strand Guide, Shroud Manipulator, swivelling launder, Emergency Casting Equipments, Cooing Chamber, Withdrawal & Straightening unit, Dummy bar, Roller Tables, Billet Lifting Device, Transfer Car, Turnover Cooling Bed & Walking Beam Cooling Bed, Multistep Pusher, Tundish Drying Stand, Tundish preheating station, Tundish Cooling & Storage Stand, etc.

Preparation of method of statements, HIRA for the jobs at site and daily evaluation of HIRA as per the prevalent conditions. Reporting of near misses if found during at site.

Project : - 0.92 MTPA New Plate Mill, ROURKELA, ODISHA

Client : - STEEL AUTHORITY OF INDIA LIMITED DEC 12 – MAR 14

Employer : - ESSAR PROJECTS INDIA LIMTED as Deputy Manager

Area: - Finishing Mill,De-scaling Unit & Hot Leveller (Equipment)

  • Execution-in-charge in the installation of 3000 MT’s of static and rotary equipment’ in De-scaling area and hot leveller area.

Erection planning of De-scaling & hot leveller area, job monitoring, maintaining of database of progress tracker & quality records includes in the scope.

Active involvement in the erection, alignment of finishing mill equipment.Starting from the first we have fixed machined plates, wedges for aligningbed plate, bottom plate, then erected bed plate, housing, tie beams, separators, roll balancing rails, HAGC’s, screw down, feed rolls etc.

Execution of erection and alignment of motors in plate mill

Execution of work roll & back up roll chock assembly mill housing

Preparation of shifting plan of equipment packages, shifting & OPI of individual packages.

Draw up plans to ensure construction operations are in compliance with project specification and quality of installations

Precautions like Safety net, scaffoldings prepared for work above trenches.

Preparation of method of statements, HIRA for the jobs at site and daily evaluation of HIRA as per the prevalent conditions. Reporting of near misses if found during at site.

Project : - 270MW Multi Fuel Power Plant, Hazira

Client : - ESSAR STEEL HAZIRA LIMITED DEC’11-NOV’12

Employer : - ESSAR PROJECTS INDIA LIMTED as Deputy Manager

Area: - BOILER UNIT-1 &2 ( Equipment, Duct, Structure)

Looking after the activities related to Erection & Alignment of Equipments (Coal Mill, PA fan, FD fan, ID fan, Air pre heater, Condenser, Boiler feed water pump)

Erection & Alignment of Ducts(Cold air duct, Secondary air duct, Flue gas duct)

Implementation of IMS(Integrated Management System) for Safety

Experienced in Managing sub contractors and Labour Issues at site

Project : - 5 MTPA Steel Making Plant

Client : - Essar Steel Hazira Limited, Hazira JUL’08-DEC’11

Employer : - ESSAR PROJECTS INDIA LIMTED as Assistant Manager

Area: - Conarc furnace, Laddle furnace, Material handling bay (Structure)

  • Follow up with client for front availability, drawings. Erection of structure

Looking after the activities related to Erection & Alignment of Structure at 5 MTPA Steel Making Plant

Erection & Alignment of heavy structure(Columns-200 MT, Beams)

Erection & Alignment of Crane girders

Erection & Alignment of Bunkers, Roof structure, Sheeting

Most of the heavy lifting should be done by making an assembly to reduce the time

Implementation of OHSAS:180001 & ISO:140001 for safety

Motivate the contract workmen by giving them training regarding quality and safety

Optimum utilization of available resources

Co ordination with Planning department and production department to complete the erection according to master schedule

ACADEMIA

B.E. (Mechanical Engineering), 2008

L.E. College, Morbi (Saurashtra University) - 66.67%

12th, 2004

Gujarat Higher Secondary Education Board, Gujarat, 74.6%

10th, 2002

Gujarat Secondary Education Board, Gujarat, 82.7%

Well versed with AutoCAD, MS Office, Internet

PERSONAL DOSSIER

Date of Birth: 1st July, 1987

Languages Known: English, Hindi, and Gujarati

Current CTC: Rs.8.27 Lacs

Salary: Negotiable

T