Grant All-Detail Report

2010 Cost Share Base Grant

Grant Title - 2010 Cost Share Base Grant - Lake (SWCD)

Grant ID - C13-0926

Organization - Lake SWCD

Grant Awarded Amount / $9,721.00 / Grant Execution Date
Required Match Amount / $2,430.25 / Grant End Date / 1/1/2020
Required Match % / 25% / Grant Day To Day Contact

Budget Summary

Budgeted / Spent / Balance Remaining
Total Grant Amount / $9,721.00 / $9,721.00 / $0.00
Total Match Amount / $2,006.15 / $3,000.00 / $-993.85
Total Other Funds / $19,913.39 / $29,734.39 / $-9,821.00
Total / $31,640.54 / $42,455.39 / $-10,814.85

Budget Details

Activity Name / Activity Category / Source Type / Source Description / Budgeted / Spent / Last Transaction Date / Matching Fund /
Lake County Courthouse Rain Garden / Agricultural Practices / Current State Grant / 2010 Cost Share Base Grant - Lake (SWCD) / $1,135.00 / $1,135.00 / 5/13/2010 / N
Lake County Courthouse Rain Garden / Agricultural Practices / Current State Grant / 2010 Cost Share Base Grant - Lake (SWCD) / $4,540.00 / $4,540.00 / 5/11/2011 / N
Lake County Courthouse Rain Garden / Agricultural Practices / Local Fund / 2010 Two Harbors Community Grant / $2,006.15 / $3,000.00 / 7/28/2010 / Y
Lake County Courthouse Rain Garden / Agricultural Practices / Other Funds / 2009 - Landowners / $2,910.96 / $2,910.96 / 5/13/2010 / Y
Lake County Courthouse Rain Garden / Agricultural Practices / Other Funds / 2009 Cost Share Base Grant - Lake (SWCD) / $4,460.00 / $4,460.00 / 5/13/2010 / N
Lake County Courthouse Rain Garden / Agricultural Practices / Other Funds / 2009 T/A Cost Share Base Grant - Lake (SWCD) / $1,115.00 / $1,115.00 / 6/1/2010 / Y
Lake County Courthouse Rain Garden / Agricultural Practices / Other Funds / 2010 - CCMI Directed CWF - Conservation Corps - CCMI (SAGENCY) / $1,114.12 / $1,114.12 / 12/31/2010 / N
Lake County Courthouse Rain Garden / Agricultural Practices / Other Funds / 2010 Two Harbors Community Grant / $492.31 / $492.31 / 7/28/2010 / Y
Two Harbors Gully Stabilization Project / Streambank or Shoreline Protection / Current State Grant / 2010 Cost Share Base Grant - Lake (SWCD) / $809.20 / $809.20 / 3/8/2012 / N
Two Harbors Gully Stabilization Project / Streambank or Shoreline Protection / Current State Grant / 2010 Cost Share Base Grant - Lake (SWCD) / $3,236.80 / $3,236.80 / 3/8/2012 / N
Two Harbors Gully Stabilization Project / Streambank or Shoreline Protection / Other Funds / 2011 Cost Share Base Grant - Lake (SWCD) / $1,964.20 / $1,964.20 / 3/8/2012 / N
Two Harbors Gully Stabilization Project / Streambank or Shoreline Protection / Other Funds / 2011 Cost Share Base Grant - Lake (SWCD) / $1,964.20 / $7,856.80 / 3/8/2012 / N
Two Harbors Gully Stabilization Project / Streambank or Shoreline Protection / Other Funds / 2011 Cost Share Base Grant - Lake (SWCD) / $7,856.80 / $1,964.20 / 3/8/2012 / N
Two Harbors Gully Stabilization Project / Streambank or Shoreline Protection / Other Funds / 2011 Cost Share Base Grant - Lake (SWCD) / $7,856.80 / $7,856.80 / 3/8/2012 / N

Activity Details Summary

Activity Details / Total Action Count / Total Activity Mapped / Size / Unit /
580 - Streambank and Shoreline Protection / 1 / 2 / 145 ACRE-FEET/YR
155M - Storm Water Retention Basins / 1 / 4 / 0

Indicators Summary

Indicator Name / Total Value / Unit

Grant Activity

Grant Activity - Lake County Courthouse Rain Garden

Description / Construct 1600 square foot rain garden adjacent to newly paved parking lot.
Category / AGRICULTURAL PRACTICES
Start Date / End Date / Thu May 13 00:00:00 CDT 2010
Rates and Hours
Actual Results / Constructed 1600 square foot rain garden.
Activity Action - Legacy Migrated Data
Practice / 155M - Storm Water Retention Basins / Count of Activities / 1
Description
Proposed Size / Units / Lifespan / 10 YEARS
Actual Size/Units / Installed Date

Grant Activity - Two Harbors Gully Stabilization Project

Description / Stabilize a down-cutting roadside ditch/waterway that is contributing sediment to Lake Superior. The project site is adjacent to the new Two Harbors Campground expansion and the waterway outlets directly into a wetland before entering Lake Superior.
Category / STREAMBANK OR SHORELINE PROTECTION
Start Date / 2-Jan-12 / End Date / Thu Mar 08 00:00:00 CST 2012
Rates and Hours
Actual Results / 145 lineal feet of the roadside waterway was stabilized with rock rip-rap.
Activity Action - Legacy Migrated Data
Practice / 580 - Streambank and Shoreline Protection / Count of Activities / 1
Description
Proposed Size / Units / ACRE-FEET/YR / Lifespan / 10 YEARS
Actual Size/Units / 145 ACRE-FEET/YR / Installed Date

Grant Attachments

Document Name / Document Type / Description /

Report created on:7/24/2013 Page 1 of 4