100% PS&E Checklist
______
CORRIDOR: CONTRACT:
CONSULTANT: LETTING DATE:
NTTA Use Only
DATE: REVIEWED BY:
Comments: ______
PMO/GEC Use OnlyGrade ABCDF
AcceptRejectDate: By:
Comments:
______
DATE: REVIEWED BY:
Verify all design is in compliance with the NTTA Design Guidelines
Check all elements that apply to the project. If not applicable, explain why.
Color & FinishesLightingSign StructuresSignageWallsBridge Structures
Mainlane ElementsToll Gantry StructuresLandscape/IrrigationPublic Art
Comments:
NOTE: If any of the above boxes are not checked, an explanation must be provided as why Guidelines cannot be met.
Verify all design is in compliance with the following NTTA manuals and/or guidelines:
Roadway Electrical SystemMaintenance DesignPS&E Procedures Manual
Crash AttenuatorSign & Traffic Control Devices
Comments:
NOTE: If any of the above boxes are not checked, an explanation must be provided as why Guidelines cannot be met.
______
Design coordinated with adjacent project.
Verify all design in compliance with the established design criteria for this project.
Submittal being tracked in EPDS.
Comments:
Previous Plan Submittal
Revised PlansComments incorporated from previous review
Comments:
Consistent with NTTA CAD GuidelinesAll sheets numbered
Title Sheet- Final
Project DescriptionContract No.Section No.Project Limits
Project LengthBridge LengthBegin/End Sta.Design Speed & ADT
Location MapTDLR InspectionSignature Block
Exceptions, Equations and Railroad CrossingsAdoption Date of Governing Specifications
Comments:
Index Sheet(s)- Final
Volumes ListedTxDOT Standards NTTA Standard DrawingsMunicipal Standards
Comments:
Project Layout -Final
Major Intersections LabeledLegible Project Stationing
Comments:
Typical Sections-Final (Include labels, legends and dimensions where appropriate)
------Existing------
ROWShouldersBorder WidthLane Width
BarrierType of CurbMedian
------Existing Pavement Structure------
LTSHMAC BaseCRCPJRCP
Comments:
------Proposed------
Existing/Propposed ROWShouldersCross SlopesLane Width
Type of CurbSide SlopesStation LimitsLane Direction
Border WidthWallsFlumesMow Strips
Ditch SectionsMedian
------Proposed Pavement Structure------
LTSEmbankment TypeHMAC TypeCRCPJRCPPrime Coat
Comments:
General Notes- Final
IncludedSpecification DataSpecial Specification (Project Specific)
Comments:
Summary Sheet(s)- Final
Estimate & Quantity SummaryTCPRemovalEarthwork
RoadwayDrainageRetaining WallsBridge
Pavement Marking/DelineationITSSW3PMiscellaneous
Other
Comments:
Traffic Control Plan - Final
Sequence of Work NarrativeAdvance Warning SignsConstruction Sequence Typicals
Temporary PavementTemporary ShoringDetour/ Alignment
Phasing LayoutWork Zone Pavement MarkingWork Zone Signing
Channelization DevicesTemporary Traffic Signals/Illumination
Standards
Comments:
Removal Plan- Final
Existing Roadway Topography (pavement, curb, driveways, etc.)Known existing utilities (OH or UG)
Removal items identifiedLegend
Comments:
Geometric Layout- Final
Control Point CoordinatesBaseline and/or CenterlineGraphic Scale
North ArrowOverall view of project with primary control monumentation
Roadway NamesChain NamesLane Assignments
Comments:
Horizontal Control Alignment Data- Final
Curve DataPC, PI, PT Stations & CoordinatesRadius and DOC
Deflection AngleTangent Length and bearingsStations and Station Equations
Station/offset information (relative to other alignments)
Comments:
Superelevation Data Sheet- Final
Begin/End SuperelevationSuperelevation Rates
Comments:
Plan/Profile Sheet(s) - Final
------Plan View Update------
Existing/Proposed ROWExisting/Proposed UtilitiesExisting/Proposed Cross Drainage
Lane AssignmentsStationing/BearingsBench Marks
Control Points LabeledNorth ArrowHorizontal Scale
Type of CurbRiprapMow Strips
Retaining WallsCrash AttenuatorsMBGF/Barrier/Rail
SGT/TASConstruction EasementsHorizontal Curve Data
Proposed GantriesCross Slopes
Existing Roadway Topography (Background)
Proposed Roadway (Foreground)
Comments:
------Profile Update View------
Existing Ground ProfileProposed Grade LineCross Drainage Structures
Station/ElevationGradesVertical Curve Data
Comments:
Paving & Bridge Deck Contours - Final
Intersection(s)Bridge(s)
Comments:
Miscellaneous Roadway Details (ADAItems, Transition for Curb Ends, etc.)- Final
IncludedIn progress
Comments:
Retaining Wall Layouts- Final
Key MapPlan & ProfileBegin/End StationsMow Strips Flumes Finished Grade Pay Limits Pipe Underdrains Cleanouts Sections Control Points Riprap Coping Bore Holes Table of Estimated Quantities
Comments:
Drainage - Final
Drainage Area MapRunoff ComputationsInlet Computations
Storm Sewer ComputationsDrainage Plan/ProfileSize/Type of Pipe
Lateral DetailsManholesPipe Slopes
Trench ProtectionType & Offset of InletsStorm Drain Master Plan
Comments:
Culvert Layout(s) - Final
Existing Plan/ProfileProposed Plan/ProfileCulvert Description (Span X Height)
Type of Wingwalls/HeadwallsUSFL/DSFL ElevationsHW/TW for Des. & 100 yr. flood
Riprap/Erosion ControlNBI No. (Bridge Class)Direction of flow
Culvert SlopesBox Culvert SupplementSafety End Treatment(s)
Hydraulic Data Table including: Q, HW, TW, V for appropriate design year and 100 yr. flood
Hydraulic Report(s) Approval (Bridge Class only)
Comments:
Utility Plan - Final
Existing Utilities LayoutProposed Utilities LayoutConflict Resolution
Plans Distributed to Utility Companies
Comments:
Bridge Layout(s)- Final
Plan and ElevationBegin/End StationingSpansRail
Riprap LimitsHorizontal/Vertical Curve DataVertical ClearancesTest Hole Data
Estimated QuantitiesBearing Seat Elevations
Comments:
Bridge Details- Final
Abutment DetailsBent DetailsSlab DetailsBeam Layout
Beam Unit DetailsEstimated Quantity TablesCompliance with Aesthetic Criteria
Comments:
Railroad Exhibit (when required) - Finalized
TxDOT ChecklistRailroad Checklist (UPRR, BNSF, DART, etc.)Approval
Comments:
Signing Layout(s) - Final
Sign LayoutGuide Sign DetailsOH Sign Structure Elevations
Preliminary Sign Support Details
Comments:
Illumination & Signal Layout(s) - Final
Illumination PlanLighting Circuit DiagramUnderbridge Lighting PlanElectrical Details
Quantity SummariesSignal Layout(s)Signal Phase DiagramTemporary Signal
Comments:
Pavement Marking & Delineation Layout - Final
Pavement Marking PlanDesign details
Comments:
ITS Layout(s)- Final
ITS PlanDMS LocationsCCTV Camera LocationsITS Legend
Power SourceTraffic SensorsPavement SensorsConduit Runs
Electrical Service CentersMini Power Enclosures
Ground Box Locations (1000’min. spacing)
Comments:
Landscape and Irrigation- Final
------Landscape------
Plant LayoutPlanting DetailsLegend
------Irrigation------
Irrigation LayoutHydraulic DataControl System
Fiber ConnectionPower Source
Comments:
Storm Water Pollution Prevention Plan – SW3P - Final
EPICSW3P Layout with phases/stagesBMP Install/Remove Dates
Disturbed/Stabilized DatesSW3P Data Sheet
Comments:
Earthwork Cross Sections – Final
50’IntervalsPavement LimitsRetaining WallsROW
Side SlopesVertical & Horizontal ControlBarrier/Rail
Comments:
Estimate - Final
Cost Construction Schedule
Comments:
Proposal Book - Final
Pending ReviewApproved
Comments:
FD-01-F4Page 1 of 7Release Date: 06/24/2009