1. Answer: B, although each person should check their own work as part of any project, the project manager ultimately has the responsibility for quality on a project as a whole
  1. Answer: C, Quality attributes are the measurements that determine if the product is acceptable. They are based on the characteristics of the product for which they are designed.
  1. Answer: B, Choices A, C, and D are done as part of Perform Quality Assurance or Perform Quality Control (depending on how they are used). This leaves only choice B, which must be the best answer, as cost of quality is part of Plan Quality.
  1. Answer: B, Only quality training (B) is a cost of conformance to quality. All the other choices are costs of nonconformance to quality.
  1. Answer: C, it just is.
  1. Answer: C, quality metrics are an output of the Plan Quality process. They are an input to the Perform Quality process, which is the process in which quality audits take place.
  1. Answer: C, Although quality planning usually occurs during a project planning, all projects or parts of projects frequently need to be replanned.
  1. Answer: B, although each person should check their own work as part of any project, the project manager ultimately has the responsibility for quality on a project as a whole
  1. Answer: C, Quality attributes are the measurements that determine if the product is acceptable. They are based on the characteristics of the product for which they are designed.
  1. Answer: B, Choices A, C, and D are done as part of Perform Quality Assurance or Perform Quality Control (depending on how they are used). This leaves only choice B, which must be the best answer, as cost of quality is part of Plan Quality.
  1. Answer: B, Only quality training (B) is a cost of conformance to quality. All the other choices are costs of nonconformance to quality.
  1. Answer: C, it just is.
  1. Answer: C, quality metrics are an output of the Plan Quality process. They are an input to the Perform Quality process, which is the process in which quality audits take place.
  1. Answer: C, Although quality planning usually occurs during a project planning, all projects or parts of projects frequently need to be replanned.